The following is a summary of information provided by the licensee via email:
Global Nuclear Fuel discovered instances of GNF3 fuel assembly spacers relocating within the fuel bundle. A safety communication was issued in 2022 following the discovery of a raised water rod (WR) at Grand Gulf Nuclear Station. Shutdown inspections in February 2024 at Lasalle identified five spacers out of position. Shutdown inspections at Limerick in April 2024 identified four spacers out of position. Those discoveries prompted this Part 21 report. An evaluation concluded that the relocated spacers could result in a degraded critical power margin, but the evaluation of this condition indicates it will not compromise or greatly reduce protection to public health and safety.
Plants with suspect bundles installed:
Grand Gulf Nuclear Station (Raised WR but no defective spacers)
Lasalle (1 bundle with 5 relocated spacers found)
Limerick (1 bundle with 4 relocated spacers found)
Nine Mile Point (No defects found)
Fermi (No defects found)
Peach Bottom (Shutdown scheduled in Fall 2024)
Fitzpatrick (Shutdown scheduled in Fall 2024)
- * * UPDATE ON 4/26/24 AT 1220 EDT FROM LISA SCHICHLEIN TO ADAM KOZIOL * * *
Updated to correct administrative errors in the summary of defects. Corrections were made above.
Notified R1DO (Werkheiser), R3DO (Betancourt-Roldan), R4DO (Warnick), Part 21/Reactor Group (email)