ENS 56849
ENS Event | |
---|---|
21:45 Nov 10, 2023 | |
Title | |
Event Description | The following information was provided by the licensee via email:
At 1545 CST on November 10, 2023, personnel at Waterford Steam Electric Station Unit 3 determined that 19 conduits in the engineered safety features actuation system (ESFAS) auxiliary relay cabinets A and B did not have the required fire seals for bay separation. This condition meets the criteria involving an unanalyzed condition that significantly affects plant safety. The plant is currently defueled. Decay heat is being removed by normal spent fuel cooling system operations. ESFAS is not required to be operable in the current plant mode. This event is being reported as an eight-hour, non-emergency notification per 10 CFR 50.72(b)(3)(ii)(B) as an unanalyzed condition that significantly degrades plant safety. There was no impact to the health and safety of the public or plant personnel. The NRC Region 4 Branch Chief [Dixon] has been notified.
On November 10, 2023, Waterford Steam Electric Station Unit 3 reported in EN 56849 that 19 conduits in engineered safety features actuation system (ESFAS) auxiliary relay cabinets A and B did not have the required fire seals for bay separation. This condition met the criteria involving an unanalyzed condition that significantly affects plant safety. Waterford 3 has determined that the ESFAS auxiliary relay cabinets A and B jumper conduits do not require fire seals based on review of an engineering specification that specifies the size and length of conduits which require fire seals to be installed. None of the nineteen affected conduits meet the size and length criteria that would necessitate installation of a fire seal. Based on this, the condition described in EN 56849 is not considered to be an unanalyzed condition that significantly affects plant safety as described in 10 CFR 50.72(b)(3)(ii)(B) and therefore is not reportable. The licensee notified the NRC Resident Inspector. Notified R4DO (Gaddy) |
Where | |
---|---|
Waterford Louisiana (NRC Region 4) | |
Reporting | |
10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition | |
Time - Person (Reporting Time:+2.63 h0.11 days <br />0.0157 weeks <br />0.0036 months <br />) | |
Opened: | Ben Boone 00:23 Nov 11, 2023 |
NRC Officer: | Adam Koziol |
Last Updated: | Jan 8, 2024 |
56849 - NRC Website
Loading map... {"minzoom":false,"maxzoom":false,"mappingservice":"leaflet","width":"350px","height":"250px","centre":false,"title":"","label":"","icon":"","lines":[],"polygons":[],"circles":[],"rectangles":[],"copycoords":false,"static":false,"zoom":6,"defzoom":14,"layers":["OpenStreetMap"],"image layers":[],"overlays":[],"resizable":false,"fullscreen":false,"scrollwheelzoom":true,"cluster":false,"clustermaxzoom":20,"clusterzoomonclick":true,"clustermaxradius":80,"clusterspiderfy":true,"geojson":"","clicktarget":"","imageLayers":[],"locations":[{"text":"\u003Cb\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca class=\"mw-selflink selflink\"\u003EENS 56849\u003C/a\u003E - \u003Ca href=\"/Waterford\" title=\"Waterford\"\u003EWaterford\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E\u003C/b\u003E\u003Cdiv class=\"mw-parser-output\"\u003E\u003Cp\u003E\u003Ca href=\"/Unanalyzed_Condition\" title=\"Unanalyzed Condition\"\u003EUnanalyzed Condition\u003C/a\u003E\n\u003C/p\u003E\u003C/div\u003E","title":"ENS 56849 - Waterford\n","link":"","lat":29.993747222222222,"lon":-90.4687111111111,"icon":"/w/images/7/79/Entergy_icon.png"}],"imageoverlays":null} | |
WEEKMONTHYEARENS 568492023-11-10T21:45:00010 November 2023 21:45:00
[Table view]10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Unanalyzed Condition ENS 498752014-03-05T15:12:0005 March 2014 15:12:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Potential Impact on Unfused Direct Current Ammeter Circuits in the Main Control Room ENS 493262013-09-05T21:00:0005 September 2013 21:00:00 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition Loss of Auxiliary Component Cooling Water Systems ENS 406322004-04-01T01:19:0001 April 2004 01:19:00 Other Unspec Reqmnt, 10 CFR 50.72(b)(3)(ii)(B), Unanalyzed Condition New Worst Case Single Failure May Exceed 10 Cfr 50.46 Acceptance Criterion for Sbloca 2023-11-10T21:45:00 | |