L-21-006, Independent Spent Fuel Storage Installation Material Status Report for the Period Ending September 30, 2021

From kanterella
Revision as of 15:03, 2 September 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search

Independent Spent Fuel Storage Installation Material Status Report for the Period Ending September 30, 2021
ML21308A284
Person / Time
Site: Humboldt Bay
Issue date: 11/04/2021
From: Peck A
Pacific Gas & Electric Co
To: Cettin J
Document Control Desk, Office of Nuclear Material Safety and Safeguards, US Dept of Energy (DOE)
References
HIL-21-006
Download: ML21308A284 (1)


Text

Pacific Gas and Electric Company"'

Adam S. Peck Diablo Canyon Power Plant Senior Director Mail code 10415/507 Engineering, Technical P.O. Box 56 And Emergency Services Avila Beach, CA 93424 805.545.6675 lhtern al: 69 1.6675 PG&E Letter HIL-21-006 Mr. John Cettin NMMSS Program, NA-532 Germantown Building U.S. Department of Energy 1000 Independence Avenue , SW Washington , DC 20585-1290 Docket No. 72-27, License No. SNM-2514 Humboldt Bay Independent Spent Fuel Storage Installation Material Status Report for the Period Ending September 30, 2021

Dear Mr. Cettin:

Pursuant to 10 CFR 74.13, Enclosure 1 of this letter provides computer-readable format of Forms DOE/NRC-742, "Material Balance Report, " and DOE/NRC-742C, "Physical Inventory Listing." The data on these forms provide inventory balances at Humboldt Bay Independent Spent Fuel Storage Installation (ISFSI) [RIS :ZRM] for the period ending September 30, 2021, for the following nuclear materials : enriched uranium and plutonium . At the end of the reporting period all material was stored in the ISFSI.

Pursuant to 10 CFR 74.15, Enclosure 2 of this letter provides computer-readable format of Form DOE/NRC-741, "Nuclear Material Transaction Report." The transaction reports decay of plutonium at Humboldt Bay Independent Spent Fuel Storage Installation for the period ending September 30, 2021. provides three files in a computer-readable format containing the information provided in Enclosure 1 and 2. The files were prepared in accordance with Nuclear Material Management and Safeguards System (NMMSS) Report D-24, "Personal Computer Data Input for NRC Licensees, " dated August 1, 2016.

Pacific Gas and Electric Company makes no new or revised regulatory commitments (as defined by NEI 99-04) in this report.

If you have any questions regarding the enclosures, please contact Mr. Joseph Lee at (805) 545-3348.

Sincerely, Adam S. Peck J I Date