ML22039A134

From kanterella
Revision as of 12:07, 2 September 2023 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Annex 17 - Testing Instruction PA-00-01 Rev 3
ML22039A134
Person / Time
Site: 07103037
Issue date: 02/05/2004
From: Bergmann W
Nuclear Cargo + Service GmbH
To:
Office of Nuclear Material Safety and Safeguards
Bernie White NMSS/DFM/STL 301-415-6577
Shared Package
ML22039A116 List:
References
Download: ML22039A134 (10)


Text

Publisher: Department AT Testing Instruction-No.: PA-00-01 Periodic Inspection of the BU-D Package Contents

1. Scope of validity
2. Purpose of the instruction
3. Personnel qualification
4. Inspections before first use
5. Periodic inspections
6. Documentation
7. Non-conformities : Follow-up plan for periodic inspections (5-years inspection) of BU-D packages : Follow-up plan for periodic inspections (1-years inspection) of BU-D packages Rev.-No. Revision Prepared/Date Checked/Date Release NCS/ Release BAM/

Date Date 3 Instruction revised W. Bergmann F. Hilbert M. Kübel T. Nitz in the follow-up 11.04.2003 14.04.2003 15.04.2003 05.02.2004 plans G:\AT_alt\Anweisungen\PA\PA-00-01_Rev 3_engl.doc

NCS GmbH Testing Instruction-No. PA-00-01 Page 2 of 3

1. Scope of validity These instructions describe the kind and amount of the periodic inspections of all packagings of the BU-D type required by the transport regulations.
2. Purpose of the instruction The correct performance of the periodic inspections assure that the packagings are kept in a serviceable condition and that they will always fulfil the requirements of the certificate of approval.
3. Personnel qualification The personnel responsible for the inspections has to be familiar with the relevant inspection and working instructions and must be able to demonstrate to the compe-tent authority that it has the required skill or undergone training to acquire it. For the responsible person designated by the user the requirements for a works expert ac-cording to DIN EN 10204 apply.
4. Inspections before first use The inspections of the packagings before first use assure that the requirements of the certificate of approval are fulfilled at the time of first use.

The relevant inspections are performed during final acceptance testing according to a manufacturing and inspection follow-up plan.

The documentation of the inspections during the final acceptance testing which are relevant for the periodic inspections (visual inspection) is filed in the inspection book.

5. Periodic inspections The periodic inspections are performed yearly by the user and every five years by the expert of BAM.

If a container is not used as a transport package for a longer period as the period between two periodic inspections the next periodic inspections has to be performed at latest before the next loading.

These periods of stand-still are not taken into account for the inspection date.

Kind and amount of the periodic inspections are specified in a inspection follow-up plan (attachments 1 and 2).

There is also specified if or which inspection instruction has to be used for the per-formance of the individual inspections.

G:\AT_alt\Anweisungen\PA\PA-00-01_Rev 3_engl.doc

NCS GmbH Testing Instruction-No. PA-00-01 Page 3 of 3 The user of the packaging assures that at the time when the inspections have to be performed the latest valid instructions which have to be used for the testing of the packaging are available.

The results of the periodic inspections have to be certified by the works expert. In case of the 5-years inspection the expert of BAM checks the complete documenta-tion, certifies the correctness and completeness and marks the packaging durably with the date of the next periodic inspection.

The expert of BAM may perform at his own discretion periodic inspections at ran-dom respectively check the documentation. He therefore has to be informed in any case in due time of the performance of the periodic inspections (5-years inspec-tions).

Before the performance of the periodic inspections it has to be assured that a certifi-cate for the absence of contamination of the packaging is present.

6. Documentation The performance and the results of the periodic inspections have to be certified in the documentation originals by stamping or letter symbol and a record has to be prepared if required.

Because of the great number of packagings to be tested for the documentation a collective protocol for all inspected packagings with their serial numbers is prepared.

Only in case of deviations a separate protocol is prepared for the individual packag-ing.

The certificate with the signatures of the works expert and the expert of BAM is part of the inspection book which comprises the packagings with the mentioned serial numbers.

7. Non-conformities In case of non-conformities during the periodic inspections these have to be re-moved by suitable repair measures or the exchange of parts.

Repair measures have to be agreed with the expert of BAM and have to be ap-proved by him.

BfS and BAM have to be informed about the performed measures.

Exchange parts have to be in agreement with the parts lists and the material specifi-cation sheets and have to be documented in accordance with these.

G:\AT_alt\Anweisungen\PA\PA-00-01_Rev 3_engl.doc

NCS GmbH Testing Instruction-No. PA-00-01 Attachment 1 Follow-up plan for periodic inspections (5-years inspections) of BU-D packages G:\AT_alt\Anweisungen\PA\PA-00-01_Rev 3_engl.doc

Inspections Follow-up Plan PFP-No. I/1 (5-years inspection) Page 1 of 3 Designation of the Drawing-No. User Explanations:

package design: V Expert of BU-D 1-001-068-00-00 The user Marking: Serial-No. Instruction-No. Rev. K1 -

D/4280/AF-D/4305/AF-96 PA-00-01 Rev. 3 T Expert of BAM Year of construction: S Written record required Description of the Instruction- Inspection Inspection Record-No. Remark No. working or inspection No. resp. by certified step inspection specification V K1 T S V K1 T A) Packaging body 1 Check and x x

  • registration of the container marking, comparison with the inspection book 2 Visual inspection of PA-03-04 x x
  • the outer container 3 Visual inspection of PA-03-04 x x
  • the clamping ring and the closure screw 4 Visual inspection of PA-03-04 x x
  • the outer lid 5 Visual inspection of PA-03-04 x x
  • the outer lid gasket 6 Visual inspection of PA-03-04 x X
  • the insulation disc 7 Visual inspection of PA-03-04 x x
  • the inner lid T = sample testing by The expert of BAM
  • = only in case of non-conformities Rev. No. Revision Prepared/Date Checked/Date Release Release BAM/

NCS/ Date Date 3 Instruction W. Bergmann/ F. Hilbert/ M. Kübel T. Nitz revised 11.04.2003 14.04.2003 15.04.2003 05.02.2004 Inspections performed:

Place Date Works expert Expert of BAM of the user

Inspections Follow-up Plan PFP-No. I/1 (5-years inspection) Page 2 of 3 Designation of the Drawing-No. User Explanations:

package design: V Expert of BU-D 1-001-068-00-00 The user Marking: Serial-No. Instruction-No. Rev. K1 -

D/4280/AF-D/4305/AF-96 PA-00-01 Rev. 3 T Expert of BAM Year of construction: S Written record required Description of the Instruction- Inspection Inspection Record-No. Remark No. working or inspection No. resp. by certified step inspection specification V K1 T S V K1 T 8 Visual inspection of PA-03-04 x x

  • the inner lid gasket 9 Visual inspection of PA-03-04 x x
  • the lid screws and thread holes 10 Control of the lid Thread x x
  • screws and thread tolerances holes by ring gauge Plug:

resp. plug gauge (only M10-6h NOT-GO side) Ring:

Amount of inspection: M10-8C 100%

11 Visual inspection of PA-03-04 x x

  • inside of the inner container including sealing surface 12 Sample control of the PA-03-04 x x
  • wall thickness with a US- testing instrument 5 % of the containers T = Sample testing by the expert of BAM
  • = only in case of non- conformities Rev. No. Revision Prepared/Date Checked/Date Release Release BAM/

NCS/ Date Date 3 Instruction W. Bergmann/ F. Hilbert/ M. Kübel T. Nitz revised 11.04.2003 14.04.2003 15.04.2003 05.02.2004 Inspections performed:

Place Date Works expert Expert of BAM of the user

Inspections Follow-up Plan PFP-No. I/1 (5-years inspection) Page 3 of 3 Designation of the Drawing-No. User Explanations:

package design: V Expert of BU-D 1-001-068-00-00 The user Marking: Serial-No. Instruction-No. Rev. K1 -

D/4280/AF-D/4305/AF-96 PA-00-01 Rev. 3 T Expert of BAM Year of construction: S Written record required Description of the Instruction- Inspection Inspection Record-No. Remark No. working or inspection No. resp. by certified step inspection specification V K1 T S V K1 T 13 Preparation of a x x certificate about the performance and results of the inspections 14 Documentation x x control and preparation of a certificate 15 Marking of the x packaging with the date for the next periodic inspection Rev. No. Revision Prepared/Date Checked/Date Release Release BAM/

NCS/ Date Date 3 Instruction W. Bergmann/ F. Hilbert/ M. Kübel T. Nitz revised 11.04.2003 14.04.2003 15.04.2003 05.02.2004 Inspections performed:

Place Date Works expert Expert of BAM of the user

NCS GmbH Testing Instruction-No. PA-00-01 Attachment 2 Follow-up plan for periodic inspections (1-years inspections) of BU-D packages G:\AT_alt\Anweisungen\PA\PA-00-01_Rev 3_engl.doc

Inspections Follow-up Plan PFP-No. II/1 (1-years inspection) Page 1 of 2 Designation of the Drawing-No. User Explanations:

package design: V Expert of BU-D 1-001-068-00-00 the user Marking: Serial-No. Instruction-No. Rev. K1 -

D/4280/AF-D/4305/AF-96 PA-00-01 Rev. 3 T Expert of BAM Year of construction: S Written record required Description of the Instruction- Inspection Inspection Record-No. Remark No. working or inspection No. resp. by certified step inspection specification V K1 T S V K1 T A) Packaging body 1 Check and x

  • registration of the container marking, comparison with the inspection book 2 Visual inspection of PA-03-04 x
  • the outer container 3 Visual inspection of PA-03-04 x
  • the clamping ring and the closure screw 4 Visual inspection of PA-03-04 x
  • the outer lid 5 Visual inspection of PA-03-04 x
  • the outer lid gasket 6 Visual inspection of PA-03-04 x
  • the insulation disc 7 Visual inspection of PA-03-04 x
  • the inner lid
  • = only in case of non-conformities Rev. No. Revision Prepared/Date Checked/Date Release Release BAM/

NCS/ Date Date 3 Instruction W. Bergmann/ F. Hilbert/ M. Kübel T. Nitz revised 11.04.2003 11.04.2003 15.04.2003 05.02.2004 Inspections performed:

Place Date Works expert of the user

Inspections Follow-up Plan PFP-No. II/1 (1-years inspection) Page 2 of 2 Designation of the Drawing-No. User Explanations:

package design: V Expert of BU-D 1-001-068-00-00 the user Marking: Serial-No. Instruction-No. Rev. K1 -

D/4280/AF-D/4305/AF-96 PA-00-01 Rev. 3 T Expert of BAM Year of construction: S Written record required Description of the Instruction- Inspection Inspection Record-No. Remark No. working or inspection No. resp. by certified step inspection specification V K1 T S V K1 T 8 Visual inspection of PA-03-04 x

  • the inner lid gasket 9 Visual inspection of PA-03-04 x
  • the lid screws and thread holes 10 Control of the lid Thread x
  • screws and thread tolerances holes by ring gauge Plug:

resp. plug gauge (only M10-6h NOT-GO side) Ring:

Amount of inspection: M10-8C 25%

11 Visual inspection of PA-03-04 x

  • inside of the inner container including sealing surface 12 Preparation of a PA-03-04 x x certificate about the performance and results of the inspections
  • = only in case of non-conformities Rev. No. Revision Prepared/Date Checked/Date Release Release BAM/

NCS/ Date Date 3 Instruction W. Bergmann/ F. Hilbert/ M. Kübel T. Nitz revised 11.04.2003 11.04.2003 15.04.2003 05.02.2004 Inspections performed:

Place Date Works expert of the user