Annex 14 - Handling Instructions HA-97-09
ML22039A131
Person / Time
Site: 07103037
Issue date: 10/18/2018
From: Hennebach M
DAHER-NCS
To:
Office of Nuclear Material Safety and Safeguards
Bernie White NMSS/DFM/STL 301-415-6577
Shared Package
ML22039A116 List:
References
Download: ML22039A131 (9)


Text

TRANSLATION Publisher: Department AT Handling instructions No.: HA-97-09 Handling of the BU-D Package Distributor:

Owner of certificate of approval BfE BAM Users Rev. Modification Prepared/ Checked/ Release DAHER/ Release BAM/

No. date date date date 4 Addition to M. Hennebach Y. van Wijk F. Hilbert C. Kuschke Chapter 6 17.08.2018 21.08.2018 22.08.2018 18.10.2018

TRANSLATION Handling instructions No. HA-97-09, Rev.4 Page 2 of 5 Contents 1 SCOPE OF VALIDITY 2 PURPOSE OF THESE INSTRUCTIONS 3 PERSONNEL QUALIFICATION 4 COURSE OF HANDLING AND CONTROLS 5 NONCONFORMITIES 6 DOCUMENTATION ATTACHMENT 1: FOLLOW-UP PLAN OF CONTROLS

TRANSLATION Handling instructions No. HA-97-09, Rev.4 Page 3 of 5 1 Scope of validity These instructions are valid for the handling of the BU-D package while it is being loaded, and for the controls which are to be carried out during the loading operations.

Only package specific control steps which are relevant during handling will be presented in this document.

2 Purpose of these instructions The correct handling and the controls during loading assure that the package will be kept in orderly working conditions, and that it will always fulfil the requirements of the approval according to the transport regulations.

3 Personnel qualification The personnel must be familiar with these instructions. In case of necessity, it must be demonstrated to the relevant authorities that the personnel has the required skill, or that it has undergone specific training to acquire it.

The responsible person designated by the user for loading and release of the packages for transport has to have sufficient knowledge of the transport regulations and must be able to certify the correct condition of the packages.

4 Course of handling and controls The main handling steps and controls during loading to assure the fulfilment of the requirements of the approval according to the transport regulations are presented in attachment I.

Detailed descriptions of the handling steps are contained in the plant specific handling instructions.

The handling and loading or unloading of the packages must only be done in areas which are free of contamination.

The user of the package will make sure that at the time of handling, the latest valid instructions, or the instructions which must be used, are available.

Controls shall be carried out by a responsible person appointed by the user. The controls which must be carried out are listed in attachment I, in a follow-up plan for controls.

TRANSLATION Handling instructions No. HA-97-09, Rev.4 Page 4 of 5 5 Nonconformities Nonconformities within the scope of operation and of controls must be elimi-nated through adequate repair measures or by exchanging parts, before the package may continue to be used.

Repairs of components falling under steps 1 (parts of the inner container) and 2 (parts of the outer container and the thermal insulation) may only be effected after consultation with BAM.

Repairs at the surface of the thermal insulation are allowed without contacting BAM.

All spare parts must meet the requirements of the material specification sheets and be certified correspondingly.

6 Documentation The correct handling, the executed control steps and the carrying out and results of controls during loading operations must be recorded in original documents and countersigned by the responsible representative appointed by the user.

Due to the large number of packages which must be controlled, a global report covering all handled packages, mentioning the serial number of each package, will be issued. An individual report will only be issued in case of nonconformity of a single package.

Incidents and events that are not covered by the applicable regulations, as well as information on the operating record (experience in transport and handling) are to be reported in writing by the user of the packaging to the license holder.

This certification is part of the transport documents. The documentation of repair measures is part of the package's control book.

TRANSLATION Handling instructions No. HA-97-09, Rev.4 Page 5 of 5 : Follow-up plan of controls Follow-up plan of controls during the loading of the BU-D transport package

Follow-up plan of controls PFP No. HA-97-09 Page 1 of 4 Designation of design: Drawing No.: User Explanations:

BU-D 1-001-068-00-00 U user Identification: Serial No. No. of instruction Rev.

D/4280/AF- HA-97-09 4 D/4305/AF-96 S written certification Manufacturing year: required Running Description of the work or No. of instruction Control by Control Record No. Remarks No. control step or control re- certifications quirement U S U A. Incoming control

1. Control of completeness Plant specific X The handling and good working order is done of tools, auxiliary media, usually with accessories and spare pallets and parts. fork lift. If other han-dling devices are used (for example drum grabs) atten-tion has to be payed that the packages will not get dam-aged.
2. Visual inspection of the PA-03-04 X
  • exterior package and of Rev. 0 the clamping ring.

B. Preparations for loa-ding

3. Opening of exterior and Plant specific X interior package
4. Visual control of the PA-03-04 X
  • interior package cavity, Rev. 0 including the sealing surfaces
5. Visual control of tapped PA-03-04 X
  • holes Rev. 0 Rev. No. Change Carried out / date Controlled / date Release DAHER / Release BAM /

date date 4 Revision 4 of M. Hennebach / Y. van Wijk / F. Hilbert / C. Kuschke /

HA-97-09 17.08.18 21.08.18 22.08.18 18.10.18 Handling carried out:

Place Date User Works expert Independent expert

Follow-up plan of controls PFP No. HA-97-09 Page 2 of 4 Designation of design: Drawing No.: User Explanations:

BU-D 1-001-068-00-00 U user Identification: Serial No. No. of instruction Rev.

D/4280/AF- HA-97-09 4 D/4305/AF-96 S written certification Manufacturing year: required Running Description of the work or No. of instruction Control by Control Record No. Remarks No. control step or control re- certifications quirement U S U

6. Visual control of the lid PA-03-04 X
  • screws Rev. 0
7. Visual control of the PA-03-04 X
  • interior package gasket Rev. 0
8. Visual control of the PA-03-04 X
  • interior package lid Rev. 0 X
9. C. Loading Loading of the package Plant specific X The adequate with the filled fuel pails, protective using the special grab rack must be and setting in the protec- used accord-tive rack ing to the type of powder pail.

Attention:

the package must always be completely filled with pails.

If necessary, use empty pails or spacers.

Rev. No. Change Carried out / date Controlled / date Release NCS / date Release BAM /

date 4 Revision 4 of M. Hennebach / Y. van Wijk / F. Hilbert / C. Kuschke /

HA-97-09 17.08.18 21.08.18 22.08.18 18.10.18 Handling carried out:

Place Date User Works expert Independent expert

Follow-up plan of controls PFP No. HA-97-09 Page 3 of 4 Designation of design: Drawing No.: User Explanations:

BU-D 1-001-068-00-00 U user Identification: Serial No. No. of instruction Rev.

D/4280/AF- HA-97-09 4 D/4305/AF-96 S written certification Manufacturing year: required Running Description of the work or No. of instruction Control by Control Record No. Remarks No. control step or control re- certifications quirement U S U

10. Recording of the pack- X + X age serial number and of its contents D. Closing the package
11. Check presence of Plant specific X protective rack and close interior package. Tightening torque of the screws:

13 Nm

12. Visual control of the PA-03-04 X
  • insulating disk. Rev. 0
13. Visual control of the PA-03-04 X
  • exterior package gasket. Rev. 0
14. Visual control of the PA-03-04 X
  • exterior package lid. Rev. 0
15. Setting in the insulating Plant specific X disk and closing the tightening torque exterior package. of the screw:

16 Nm

16. Lead sealing of the X +

package at the clamping ring screw.

Rev. No. Change Carried out / date Controlled / date Release NCS / date Release BAM /

date 4 Revision 4 of M. Hennebach / Y. van Wijk / F. Hilbert / C. Kuschke /

HA-97-09 17.08.18 21.08.18 22.08.18 18.10.18 Handling carried out:

Place Date User Works expert Independent expert

Follow-up plan of controls PFP No. HA-97-09 Page 4 of 4 Designation of design: Drawing No.: User Explanations:

BU-D 1-001-068-00-00 U user Identification: Serial No. No. of instruction Rev.

D/4280/AF- HA-97-09 4 D/4305/AF-96 S written certification Manufacturing year: required Running Description of the work or No. of instruction Control by Control Record No. Remarks No. control step or control re- certifications quirement U S U E. Preparation for re-moval

17. Contamination control PA-03-05 X X Rev. 0
18. Dose rate measurement PA-03-05 X X Rev. 0
19. Determination of the According to the X transport index (TI) and transport regula-the criticality index tions (CSI).
20. Sticking labels onto the According to the X package. transport regula-tions
21. Determination of the X gross weight by weigh-ing and entering of the weight on the package label.
22. Controlling that the X transport papers are correct and complete.
  • only in case of nonconformity + IAEA/EURATOM Rev. No. Change Carried out / date Controlled / date Release NCS / date Release BAM /

date 4 Revision 4 of M. Hennebach / Y. van Wijk / F. Hilbert / C. Kuschke /

HA-97-09 17.08.18 21.08.18 22.08.18 18.10.18 Handling carried out:

Place Date User Works expert Independent expert