TXX-6122, Interim Deficiency Rept CP-86-08 Re Control of Stamps Used to Identify Super Hilti Kwik Bolts.Initially Reported on 860206.Ultrasonic Testing Will Be Completed by 870227.Next Rept Anticipated by 870320
| ML20215D661 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/01/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-08, CP-86-8, TXX-6122, NUDOCS 8612160441 | |
| Download: ML20215D661 (1) | |
Text
.
Log # TXX-6122 File # 10110 _1 903.9 =
TEXAS UTILITIES GENERATING COMPANY f SKYWAY TOWER . ese NORTH OLIVE STREEr. 3.15. 83 . DALL.AB. TEXAS THOI q December 1, 1986 $
m??,"tff.0:A 3 @IE Mr. Eric H. Johnson, Director DEC - 91986 e E
i Division of Reactor Safety and Projects # [
U. S. Nuclear Regulatory Commission _ __
611 Ryan Plaza Drive, Suite 1000 -
Arlington, TX 76011 -
a
[
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES) -
DOCKET NOS. 50-445 AND 50-446 I l
' INSTALLATION OF SUPER HILTI KWIK BOLTS =
SDAR: CP-86-08 (INTERIM REPORT) }
Dear Mr. Johnson:
On February 6,1986, we verbally notified your Mr. T. F. Westerman of a 1 deficiency involving the control of stamps used to identify Super Hilti Kwik 4l Bolts. This is an interim report of a potentially reportable item under the .3 -
provisions of 10CFR50.55(e). Our latest interim report, logged TXX-4963, was e submitted on August 22, 1986. "
l As noted in our previous response, the portion of this deficiency which 5 involves ASME installations has been completed without the identification of conditions adverse to safety. All installations were evaluated and determined $
to be acceptable "as-is". ,
For the portion of this issue involving non-ASME applications (such as cable _
tray supports, structural steel, conduit supports, and electrical equipment y, installations), our evaluation is continuing. This effort, which consists of ?
ultrasonic testing of a sample of non-ASME installations, must be completed a prior to our assessment of the possible adverse effects of this deficiency. F' These testing activities are currently scheduled for completion on February E_
27, 1987.
4 We anticipate submitting our next report by March 20, 1987. -
Very truly yours, ;
=
. E s
8612160441 861201 / / 6- -
PDR S
ADOCK 05000445 PDR
/ ,
' ' g
- 2 l W. G. Counsil ,,'
! GLB/mlh -
c - NRC Region IV (0 + 1 copy)
! Director, Inspection & Enforcement (15 copies) '
U. S. Nuclear Regulatory Commission %
Washington, D.C. 20555 g A unusum or rms twmas ruernic <<mmr 1
% -1400 i o IEZ7 _p