TXX-6122, Interim Deficiency Rept CP-86-08 Re Control of Stamps Used to Identify Super Hilti Kwik Bolts.Initially Reported on 860206.Ultrasonic Testing Will Be Completed by 870227.Next Rept Anticipated by 870320
| ML20215D661 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 12/01/1986 |
| From: | Counsil W TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | Johnson E NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV) |
| References | |
| CP-86-08, CP-86-8, TXX-6122, NUDOCS 8612160441 | |
| Download: ML20215D661 (1) | |
Text
.
Log # TXX-6122 File # 10110
_1 903.9
=
TEXAS UTILITIES GENERATING COMPANY f
SKYWAY TOWER. ese NORTH OLIVE STREEr. 3.15. 83. DALL.AB. TEXAS THOI q
December 1, 1986 m??,"tff.0:A 3 @IE DEC - 91986 e
Mr. Eric H. Johnson, Director E
[
i Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 a
[
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)
DOCKET NOS. 50-445 AND 50-446 I
l INSTALLATION OF SUPER HILTI KWIK BOLTS
=
SDAR: CP-86-08 (INTERIM REPORT)
}
Dear Mr. Johnson:
On February 6,1986, we verbally notified your Mr. T. F. Westerman of a 1
deficiency involving the control of stamps used to identify Super Hilti Kwik 4l Bolts.
This is an interim report of a potentially reportable item under the
.3 -
provisions of 10CFR50.55(e). Our latest interim report, logged TXX-4963, was "e
submitted on August 22, 1986.
l As noted in our previous response, the portion of this deficiency which 5
involves ASME installations has been completed without the identification of conditions adverse to safety. All installations were evaluated and determined to be acceptable "as-is".
For the portion of this issue involving non-ASME applications (such as cable tray supports, structural steel, conduit supports, and electrical equipment y,
installations), our evaluation is continuing.
This effort, which consists of
?
ultrasonic testing of a sample of non-ASME installations, must be completed a
prior to our assessment of the possible adverse effects of this deficiency.
F' These testing activities are currently scheduled for completion on February E_
27, 1987.
4 We anticipate submitting our next report by March 20, 1987.
Very truly yours,
=
8612160441 861201
/
/
E 6- -
s PDR ADOCK 05000445
/
g S
PDR 2
l W. G. Counsil GLB/mlh c - NRC Region IV (0 + 1 copy)
Director, Inspection & Enforcement (15 copies)
U. S. Nuclear Regulatory Commission Washington, D.C.
20555 g
% -1400 A unusum or rms twmas ruernic <<mmr 1
IEZ7
_p i o
_...