TXX-6122, Interim Deficiency Rept CP-86-08 Re Control of Stamps Used to Identify Super Hilti Kwik Bolts.Initially Reported on 860206.Ultrasonic Testing Will Be Completed by 870227.Next Rept Anticipated by 870320

From kanterella
(Redirected from TXX-6122)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-08 Re Control of Stamps Used to Identify Super Hilti Kwik Bolts.Initially Reported on 860206.Ultrasonic Testing Will Be Completed by 870227.Next Rept Anticipated by 870320
ML20215D661
Person / Time
Site: Comanche Peak  
Issue date: 12/01/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-08, CP-86-8, TXX-6122, NUDOCS 8612160441
Download: ML20215D661 (1)


Text

.

Log # TXX-6122 File # 10110

_1 903.9

=

TEXAS UTILITIES GENERATING COMPANY f

SKYWAY TOWER. ese NORTH OLIVE STREEr. 3.15. 83. DALL.AB. TEXAS THOI q

December 1, 1986 m??,"tff.0:A 3 @IE DEC - 91986 e

Mr. Eric H. Johnson, Director E

[

i Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000 Arlington, TX 76011 a

[

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 I

l INSTALLATION OF SUPER HILTI KWIK BOLTS

=

SDAR: CP-86-08 (INTERIM REPORT)

}

Dear Mr. Johnson:

On February 6,1986, we verbally notified your Mr. T. F. Westerman of a 1

deficiency involving the control of stamps used to identify Super Hilti Kwik 4l Bolts.

This is an interim report of a potentially reportable item under the

.3 -

provisions of 10CFR50.55(e). Our latest interim report, logged TXX-4963, was "e

submitted on August 22, 1986.

l As noted in our previous response, the portion of this deficiency which 5

involves ASME installations has been completed without the identification of conditions adverse to safety. All installations were evaluated and determined to be acceptable "as-is".

For the portion of this issue involving non-ASME applications (such as cable tray supports, structural steel, conduit supports, and electrical equipment y,

installations), our evaluation is continuing.

This effort, which consists of

?

ultrasonic testing of a sample of non-ASME installations, must be completed a

prior to our assessment of the possible adverse effects of this deficiency.

F' These testing activities are currently scheduled for completion on February E_

27, 1987.

4 We anticipate submitting our next report by March 20, 1987.

Very truly yours,

=

8612160441 861201

/

/

E 6- -

s PDR ADOCK 05000445

/

g S

PDR 2

l W. G. Counsil GLB/mlh c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 g

% -1400 A unusum or rms twmas ruernic <<mmr 1