Interim Deficiency Rept CP-86-41 Re Small Break LOCA Mode 4 Operations.Initially Reported on 860528.Westinghouse Owners Group Accepted Program Designed by Analysis Subcommittee to Address Concern.Next Rept Will Be Submitted by 870612
ML20215P007
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/29/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-41, TXX-6062, NUDOCS 8611100213
Download: ML20215P007 (1)


Text

-

Log # TXX-6062 File # 10110 l 915.6 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER e 485 NORTH OLIVE STREET R.B. 91. DALLAS. TEXAS 75398 October 29, 1986 kb

- b.. uw

. .. o..c.o.u.s..s.it.

I}

4 NOV v

Mr. Eric H. Johnson, Director i

41986 )b l Division of Reactor Safety and Projects -

U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000

t. - y. Arlington, TX 76012 s

t

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 SMALL BREAK LOCA MODE 4 OPERATIONS SDAR: CP-86-41 (INTERIM REPORT)

Dear Mr. Johnson:

~

On May 28, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving small break LOCA evaluations regarding the effects of the operational status of plant squipment during Mode 4 operations. This is an p l interim report of a potentially reportable item under the provisions of

10CFR50.55(e). We have submitted interim reports logged TXX-4876 and TXX-4959, dated June 26, 1986, and August 13, 1986, respectively.

~

The Westinghouse Owners Group, of which TUGC0 is a member, accepted a program designed by the WOG Analysis Subcommittee to address this concern at their September, 1986 meeting. The projected schedule outlines an April,1987 completion date. Allowing for a reasonable delay time in distributing the conclusions from the subcommittee to all affected parties, we anticipate submitting our next report on this issue by. June 12, 1987.

\

Very truly yours,

. ?7'-

W. G. Counsil JCH/mlh

c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C. 20555 Nk'SD S

lQ A snrusuas or trus n,ts.mrs riscrnsc cunarm

-2.