TXX-6062, Interim Deficiency Rept CP-86-41 Re Small Break LOCA Mode 4 Operations.Initially Reported on 860528.Westinghouse Owners Group Accepted Program Designed by Analysis Subcommittee to Address Concern.Next Rept Will Be Submitted by 870612

From kanterella
(Redirected from TXX-6062)
Jump to navigation Jump to search
Interim Deficiency Rept CP-86-41 Re Small Break LOCA Mode 4 Operations.Initially Reported on 860528.Westinghouse Owners Group Accepted Program Designed by Analysis Subcommittee to Address Concern.Next Rept Will Be Submitted by 870612
ML20215P007
Person / Time
Site: Comanche Peak  Luminant icon.png
Issue date: 10/29/1986
From: Counsil W
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To: Johnson E
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
References
CP-86-41, TXX-6062, NUDOCS 8611100213
Download: ML20215P007 (1)


Text

-

Log # TXX-6062 File # 10110 l

915.6 TEXAS UTILITIES GENERATING COMPANY SKYWAY TOWER e 485 NORTH OLIVE STREET R.B. 91. DALLAS. TEXAS 75398 October 29, 1986 I} kb

- b.. uw o c.o.u.s..s.it.

v 41986 )b l 4

NOV i

Mr. Eric H. Johnson, Director Division of Reactor Safety and Projects U. S. Nuclear Regulatory Commission 611 Ryan Plaza Drive, Suite 1000

- y.

Arlington, TX 76012 t.

s t

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STATION (CPSES)

DOCKET NOS. 50-445 AND 50-446 SMALL BREAK LOCA MODE 4 OPERATIONS SDAR: CP-86-41 (INTERIM REPORT)

Dear Mr. Johnson:

~

On May 28, 1986, we verbally notified your Mr. I. Barnes of a deficiency involving small break LOCA evaluations regarding the effects of the operational status of plant squipment during Mode 4 operations.

This is an p

l interim report of a potentially reportable item under the provisions of 10CFR50.55(e). We have submitted interim reports logged TXX-4876 and TXX-

~

4959, dated June 26, 1986, and August 13, 1986, respectively.

The Westinghouse Owners Group, of which TUGC0 is a member, accepted a program designed by the WOG Analysis Subcommittee to address this concern at their September, 1986 meeting. The projected schedule outlines an April,1987 completion date. Allowing for a reasonable delay time in distributing the conclusions from the subcommittee to all affected parties, we anticipate submitting our next report on this issue by. June 12, 1987.

\\

Very truly yours,

?7'-

W. G. Counsil JCH/mlh c - NRC Region IV (0 + 1 copy)

Director, Inspection & Enforcement (15 copies)

U. S. Nuclear Regulatory Commission Washington, D.C.

20555 Nk'SD S

-2.

lQ A snrusuas or trus n,ts.mrs riscrnsc cunarm 1 0 l