ML20062D892
| ML20062D892 | |
| Person / Time | |
|---|---|
| Site: | Farley |
| Issue date: | 08/02/1982 |
| From: | ALABAMA POWER CO. |
| To: | |
| Shared Package | |
| ML20062D890 | List: |
| References | |
| NUDOCS 8208060256 | |
| Download: ML20062D892 (1) | |
Text
-- -
3 Q ~ - ' '....~ ~
f,
.. ; ,- 't
., + -
1 PLANT SYSTEMS -
g.
3/4.7.9 SNUBBERS.
LIMITING CONDITION FOR OPERATION ____ _; _ _ _ -
I s l
'?j 3.7.9 All snubbers listed in Tables 3.7-4a and 3.7-4b shal1~be ,OPi,RABLE. . .
APPLICABILITY: MODES 1, 2, 3 and 4. (MODES 5 and 6 for snu'obers located on' systems required OPERABLE in those MODES).
lt ACTION:
P _ J
~
witn one or more snpbbers inoperable, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> replace or restore the '
inoperable snubber (s) to 0PERABLE status and perform an engineering evaluation ,
/ per Specificrtion 4.7.9.c on the supported component or declare for thethatsupported e system inopsrehle and follow ,
the appropriate ACTION statement system. ',',
( ; >
SURVEILLANCE REQUIREMENTS ~ _'
m- 3,
/
4.7.9 Eachscubbers$slibedemonstratedOPERABLEbyperformanceofthe N 1 M ng augmented inservice faspection program and the requirements o~f '
'L Specification 4.0.5. , e -
.- ., )
- a. Visual Inspectio'nsj .
c,
, e , / i ,
i, e The first inservic'e' visual inspection of 56ubb'ers shall 19 performed -
after'four it.onths but within 10 months of POWER OPERATICf; wd j hall; include all sdubbers listed in Tablesr3.P 4a and 1 7-4b. If less' 1 -
< than two (2) snubbers are found inoperable during the first 'inservi'ce /
visual inspection, the second insorvice visual inspection shall bei /
performed 12 months i 25% from the date of the first inspection. ..
Otherwise, subsequent visual inspections shall be performed in accordance with the following schedule: ,
Ho. Inoperable Snubbers Subsequent Visual per Inspection Period Inspection Period"g O 18 months i 25%
1 / 12 months i 25%
2 6 months i 25% N k-3 ,'4 124 days i 25%
8200060256 e20eo2 5,6,7 62 days i 25%
%DRADUCK05000 '8 or more 31 days i 25%
The snubbers ray be categcrized into two groups: Those accessible and those inaccessible during reactor operation. Each group may be inspected independently in accordance with the above schedule.
A
)
The inspection interval shall not be lengthened more than one step at a time.
- 1 Tha nenvisions of Speci cation Q.2 are 'ot licably. _ I i t %is Yo.konth0 25% Aspc s'en Teri ,5 ex '
on i theyr.st retuelm. od*tt .for inuusstUt sno%rs. %1s is a. onc~ tint tR" at expire.s tallady be 0 re o tu
_ . - _ _ _ _ _ _ _ _ _ _ _ _ _- _