ML20062D892

From kanterella
Jump to navigation Jump to search
Proposed Tech Spec Page 3/4 7-20,extending Schedule in Surveillance Requirement 4.7.9.a Until First Refueling Outage for one-time Only
ML20062D892
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/02/1982
From:
ALABAMA POWER CO.
To:
Shared Package
ML20062D890 List:
References
NUDOCS 8208060256
Download: ML20062D892 (1)


Text

Q ~ - ' '....~ ~

3 f,

't

+

1 PLANT SYSTEMS g.

3/4.7.9 SNUBBERS.

LIMITING CONDITION FOR OPERATION I

l

'?j s

3.7.9 All snubbers listed in Tables 3.7-4a and 3.7-4b shal1~be OPi,RABLE..

APPLICABILITY:

MODES 1, 2, 3 and 4.

(MODES 5 and 6 for snu'obers located on' systems required OPERABLE in those MODES).

lt ACTION:

P J

witn one or more snpbbers inoperable, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> replace or restore the '

~

inoperable snubber (s) to 0PERABLE status and perform an engineering evaluation

/ per Specificrtion 4.7.9.c on the supported component or declare the supported e

system inopsrehle and follow the appropriate ACTION statement for that system.

(

SURVEILLANCE REQUIREMENTS ~ _'

m-3,

/

4.7.9 Eachscubbers$slibedemonstratedOPERABLEbyperformanceofthe N 1 M ng augmented inservice faspection program and the requirements o~f

'L Specification 4.0.5.

e

)

Visual Inspectio'nsj c,

a.

/

i e

i, e The first inservic'e' visual inspection of 56ubb'ers shall 19 performed after'four it.onths but within 10 months of POWER OPERATICf; wd j hall; include all sdubbers listed in Tablesr3.P 4a and 1 7-4b.

If less' 1 than two (2) snubbers are found inoperable during the first 'inservi'ce

/

visual inspection, the second insorvice visual inspection shall bei

/

performed 12 months i 25% from the date of the first inspection.

Otherwise, subsequent visual inspections shall be performed in accordance with the following schedule:

Ho. Inoperable Snubbers Subsequent Visual per Inspection Period Inspection Period"g O

18 months i 25%

1

/

12 months i 25%

2 6 months i 25% N k-3,'4 124 days i 25%

8200060256 e20eo2 5,6,7 62 days i 25%

%DRADUCK05000

'8 or more 31 days i 25%

The snubbers ray be categcrized into two groups:

Those accessible and those inaccessible during reactor operation.

Each group may be inspected independently in accordance with the above schedule.

)

AThe inspection interval shall not be lengthened more than one step at a time.

1 Tha nenvisions of Speci cation Q.2 are 'ot licably.

I i theyr.st retuelm. od*tt.for i t %is Yo.konth0 25% Aspc s'en Teri

,5 ex on inuusstUt sno%rs. %1s is a. onc~ tint tR" at expire.s tallady be 0 re o

tu

_-