Proposed Tech Spec Page 3/4 7-20,extending Schedule in Surveillance Requirement 4.7.9.a Until First Refueling Outage for one-time Only
ML20062D892
Person / Time
Site: Farley Southern Nuclear icon.png
Issue date: 08/02/1982
From:
ALABAMA POWER CO.
To:
Shared Package
ML20062D890 List:
References
NUDOCS 8208060256
Download: ML20062D892 (1)


Text

-- -

3 Q ~ - ' '....~ ~

f,

..  ; ,- 't

., + -

1 PLANT SYSTEMS -

g.

3/4.7.9 SNUBBERS.

LIMITING CONDITION FOR OPERATION ____ _; _ _ _ -

I s l

'?j 3.7.9 All snubbers listed in Tables 3.7-4a and 3.7-4b shal1~be ,OPi,RABLE. . .

APPLICABILITY: MODES 1, 2, 3 and 4. (MODES 5 and 6 for snu'obers located on' systems required OPERABLE in those MODES).

lt ACTION:

P _ J

~

witn one or more snpbbers inoperable, within 72 hours8.333333e-4 days <br />0.02 hours <br />1.190476e-4 weeks <br />2.7396e-5 months <br /> replace or restore the '

inoperable snubber (s) to 0PERABLE status and perform an engineering evaluation ,

/ per Specificrtion 4.7.9.c on the supported component or declare for thethatsupported e system inopsrehle and follow ,

the appropriate ACTION statement system. ',',

(  ; >

SURVEILLANCE REQUIREMENTS ~ _'

m- 3,

/

4.7.9 Eachscubbers$slibedemonstratedOPERABLEbyperformanceofthe N 1 M ng augmented inservice faspection program and the requirements o~f '

'L Specification 4.0.5. , e -

.- ., )

a. Visual Inspectio'nsj .

c,

, e , / i ,

i, e The first inservic'e' visual inspection of 56ubb'ers shall 19 performed -

after'four it.onths but within 10 months of POWER OPERATICf; wd j hall; include all sdubbers listed in Tablesr3.P 4a and 1 7-4b. If less' 1 -

< than two (2) snubbers are found inoperable during the first 'inservi'ce /

visual inspection, the second insorvice visual inspection shall bei /

performed 12 months i 25% from the date of the first inspection. ..

Otherwise, subsequent visual inspections shall be performed in accordance with the following schedule: ,

Ho. Inoperable Snubbers Subsequent Visual per Inspection Period Inspection Period"g O 18 months i 25%

1 / 12 months i 25%

2 6 months i 25% N k-3 ,'4 124 days i 25%

8200060256 e20eo2 5,6,7 62 days i 25%

%DRADUCK05000 '8 or more 31 days i 25%

The snubbers ray be categcrized into two groups: Those accessible and those inaccessible during reactor operation. Each group may be inspected independently in accordance with the above schedule.

A

)

The inspection interval shall not be lengthened more than one step at a time.

  1. 1 Tha nenvisions of Speci cation Q.2 are 'ot licably. _ I i t %is Yo.konth0 25% Aspc s'en Teri ,5 ex '

on i theyr.st retuelm. od*tt .for inuusstUt sno%rs. %1s is a. onc~ tint tR" at expire.s tallady be 0 re o tu

_ . - _ _ _ _ _ _ _ _ _ _ _ _ _- _