KP-NRC-2208-008 August 19, 2022 Docket No. 50-7513 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001
Subject:
Kairos Power LLC Transmittal of Change to Preliminary Safety Analysis Report Chapter 14
References:
- 1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), September 29, 2021 (ML21272A376)
- 2. Letter, Kairos Power LLC to Document Control Desk, Transmittal of Kairos Power CPA Changes, February 18, 2022 (ML22049B556)
In September 2021, Kairos Power submitted a Preliminary Safety Analysis Report (PSAR) (Reference 1) as part of the Construction Permit Application (CPA) for the Hermes non-power reactor. In February 2022, Kairos Power submitted changes to the CPA (Reference 2). This letter transmits a conforming change to a page of the PSAR to align with the changes submitted in February 2022. The change to the page of the PSAR is provided in Enclosure 1. Kairos Power requests NRC review of this changes as part of the continued review of the Hermes CPA.
If you have any questions or need any additional information, please contact Michael Ellett at ellettmic@kairospower.com or (704) 247-6310 x1368, or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.
I declare under penalty of perjury that the foregoing is true and correct.
Executed on August 19, 2022 Peter Hastings, PE Vice President, Regulatory Affairs and Quality
Enclosure:
Change to Hermes PSAR Chapter 14 Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211
KP-NRC-2208-008 Page 2 xc (w/enclosure):
William Kennedy, Acting Chief, NRR, Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR, Advanced Reactor Licensing Branch Samuel Cuadrado de Jesus, Project Manager, NRR, Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR, Advanced Reactor Licensing Branch