ML22117A075

From kanterella
Revision as of 14:28, 23 May 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Semiannual Report to Congress on the Status of NRC Licensing and Regulatory Duties Attachment
ML22117A075
Person / Time
Issue date: 05/09/2022
From: Christopher Hanson
NRC/Chairman
To: Carper T, Feinstein D, Kaptur M, Markey E, Pallone F, Tonko P
US HR (House of Representatives), US HR, Comm on Appropriations, US HR, Comm on Energy & Commerce, US HR, Subcomm on Energy, US HR, Subcomm on Energy & Water Development, US HR, Subcomm on Environment and Climate Change, US SEN (Senate), US SEN, Comm on Appropriations, US SEN, Comm on Environment & Public Works, US SEN, Subcomm on Clean Air, Climate Change & Nuclear Safety, US SEN, Subcomm on Energy & Water Development
Mroz S
Shared Package
ML22117A069 List:
References
CORR-22-0036
Download: ML22117A075 (9)


Text

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 18B Final 16B Proposed Rule 14B Regulatory Rule to 17B Proposed 19B to 21B Final 8B Associated Rulemaking 11B Basis Signature Rule 20B Signature 22B Rule 1B Item 5B CPR 9B PRM 12B Initiation Publication Authority Publication Authority Publication 23B 2B # 3B Category 4B Title Priority 6B RIN [1] 7B Docket ID 10B Numbers 13B Date 15B Date [2] Date [2] [2] 24B Date [2]

27B 2021 Edition of the American Society of Rulemaking NRC-2018-1 Mechanical Engineers High 3150-AK21 N/A 12/12/2018 N/A N/A N/A N/A N/A 26B 30B Actions 0289 25B 28B 29B 31B 32B 33B 34B 35B 36B 37B Boiler and Pressure Vessel Code 40B 2022 Edition of the American Society of Rulemaking NRC-2020-2 Mechanical Engineers High 3150-AK43 N/A 12/12/2019 N/A N/A N/A N/A N/A 39B 43B Actions 0030 38B 41B 42B 44B 45B 46B 47B 48B 49B 50B Operations and Maintenance Code 53B 2023 Edition of the American Society of Rulemaking NRC-2020-3 Mechanical Engineers High 3150-AK42 N/A 12/12/2019 N/A N/A N/A N/A N/A 52B 56B Actions 0029 51B 54B 55B 57B 58B 59B 60B 61B 62B 63B Boiler and Pressure Vessel Code 66B 2024 Edition of the American Society of Rulemaking NRC-2021-4 Mechanical Engineers High 3150-AK62 N/A 1/6/2021 N/A N/A N/A N/A N/A 65B 69B Actions 0022 64B 67B 68B 70B 71B 72B 73B 74B 75B 76B Operations and Maintenance Code 79B 2025 Edition of the American Society of Rulemaking NRC-2022-5 Mechanical Engineers High 3150-AK77 N/A N/A N/A N/A N/A N/A N/A 78B 82B Actions 0017 77B 80B 81B 83B 84B 85B 86B 87B 88B 89B Boiler and Pressure Vessel Code 92B Advanced Nuclear Rulemaking Reactor Generic NRC-2020-6 High 3150-AK55 N/A 9/21/2020 N/A 11/30/2021 5/30/2022 5/1/2023 1/2/2024 91B 95B Actions Environmental Impact 0101 90B 93B 94B 96B 97B 98B 99B 100B 101B 102B Statement American Society of Rulemaking NRC-2018-105B 7 Mechanical Engineers High 3150-AK22 N/A 12/12/2018 N/A 3/3/2021 3/26/2021 2/24/2022 6/30/2022 104B 108B Actions 0290 103B 106B 107B 109B 110B 111B 112B 113B 114B 115B 2019 - 2020 Code Editions 116B Attachment 117B [1] Rulemaking activities without a Regulation Identification Number (RIN) have not been approved by the Commission for the NRC staff to begin rulemaking but are included in the table for completeness because the staff has submitted or is preparing rulemaking plans.

0B [2] These dates are NRC staff estimates. The actual dates are subject to Commission action.

1

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 135B Final 133B Proposed Rule 131B Regulatory Rule to 134B Proposed 136B to 138B Final 125B Associated Rulemaking 128B Basis Signature Rule 137B Signature 139B Rule 118B Item 122B CPR 126B PRM 129B Initiation Publication Authority Publication Authority Publication 140B 119B # 120B Category 121B Title Priority 123B RIN [1] 124B Docket ID 127B Numbers 130B Date 132B Date [2] Date [2] [2] 141B Date [2]

144B Approval of American Rulemaking Society of Mechanical NRC-2018-8 High 3150-AK23 N/A 12/12/2018 N/A N/A N/A N/A N/A 143B 147B Actions Engineers Code Cases, 0291 142B 145B 146B 148B 149B 150B 151B 152B 153B 154B Revision 40 157B Approval of American Rulemaking Society of Mechanical NRC-2021-9 High 3150-AK61 N/A 1/6/2021 N/A N/A N/A N/A N/A 156B 160B Actions Engineers Code Cases, 0023 155B 158B 159B 161B 162B 163B 164B 165B 166B 167B Revision 41 Rulemaking Cyber Security for Fuel NRC-2015-10 High 3150-AJ64 N/A 3/24/2015 4/12/2016 10/4/2017 9/15/2022 7/28/2023 1/26/2024 169B 170B 173B Actions Facilities 0179 168B 171B 172B 174B 175B 176B 177B 178B 179B 180B Drug and Alcohol Testing: PRM-26-4, Rulemaking NRC-2012-183B 187B 11 Technical Issues and High 3150-AJ15 PRM-26-7, N/A 2/1/2023 1/2/2024 4/1/2024 1/2/2025 4/1/2025 182B 186B Actions 0079 181B 184B 185B 188B 189B 190B 191B 192B 193B Editorial Changes PRM-26-8 Enhanced Security for Rulemaking NRC-2014-196B 12 Special Nuclear Material High 3150-AJ41 N/A 2/8/2006 N/A 1/5/2023 7/5/2023 1/5/2024 7/5/2024 195B 199B Actions 0118 194B 197B 198B 200B 201B 202B 203B 204B 205B 206B

[3]

209B Enhanced Weapons for Spent Fuel Storage Rulemaking NRC-2015-13 Installations and High 3150-AJ55 N/A 8/15/2008 N/A 1/31/2024 4/27/2023 1/31/2025 6/28/2025 208B 212B Actions 0018 207B 210B 211B 213B 214B 215B 216B 217B 218B 219B TransportationSection 161A Authority 222B Enhanced Weapons, Rulemaking Firearms Background NRC-2011-14 High 3150-AI49 N/A 8/8/2005 N/A 3/16/2015 9/22/2015 5/21/2018 9/30/2022 221B 225B Actions Checks, and Security 0018 220B 223B 224B 226B 227B 228B 229B 230B 231B 232B Event Notifications Fitness-for-Duty Drug Rulemaking NRC-2009-235B 15 Testing Program High 3150-AI67 N/A 9/1/2012 7/1/2013 2/22/2017 9/16/2019 9/15/2021 6/15/2022 234B 238B Actions 0225 233B 236B 237B 239B 240B 241B 242B 243B 244B 245B Requirements Rulemaking Greater-Than-Class-C and NRC-2017-16 High 3150-AK00 N/A 12/22/2015 7/22/2019 N/A N/A N/A N/A 247B 248B 251B Actions Transuranic Waste 0081 246B 249B 250B 252B 253B 254B 255B 256B 257B 258B 261B Increased Enrichment of Rulemaking Conventional and Accident NRC-2020-17 High 3150-AK79 N/A 3/16/2022 9/16/2023 N/A N/A N/A N/A 260B 264B Actions Tolerant Fuel Designs for 0034 259B 262B 263B 265B 266B 267B 268B 269B 270B 271B Light-Water Reactors 2

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 272B [3] The Commission issued a staff requirements memorandum (SRM) directing the staff to provide a notation vote paper with a full range of options with respect to this rulemaking activity. (SRM-SECY-19-0095, "Staff Requirements - SECY-19-0095- Discontinuation of Rulemaking - Enhanced Security of Special Nuclear Material," dated August 4, 2021, ML21217A065).

3

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 288B Proposed 290B Final Rule 286B Regulatory Rule to 289B Proposed 291B to 293B Final 280B Associated Rulemaking 283B Basis Signature Rule 292B Signature 294B Rule 273B Item 277B CPR 281B PRM 284B Initiation Publication Authority Publication Authority Publication 295B 274B # 275B Category 276B Title Priority 278B RIN [1] 279B Docket ID 282B Numbers 285B Date 287B Date [2] Date [2] [2] 296B Date [2]

Independent Spent Fuel Rulemaking NRC-2009-299B 18 Storage Installation High 3150-AI78 PRM-72-6 N/A N/A 1/5/2023 7/5/2023 1/5/2024 7/5/2024 298B 302B Actions 0558 297B 300B 301B 303B 304B 305B 306B 307B 308B 309B Security Requirements [4]

Integrated Radioactive Rulemaking NRC-2015-312B 19 Source Security and High N/A PRM-37-1 N/A N/A N/A N/A N/A N/A 311B 315B Actions 0094 310B 313B 314B 316B 317B 318B 319B 320B 321B 322B Accountability 325B List of Approved Spent Fuel Storage Casks: NAC International Inc., NAC-Rulemaking NRC-2022-20 UMS Universal Storage High 3150-AK76 N/A 2/1/2022 N/A 5/26/2022 6/27/2022 5/26/2022 6/27/2022 324B 328B Actions 0049 323B 326B 327B 329B 330B 331B 332B 333B 334B 335B System, Certificate of Compliance No. 1015, Amendment No. 9 Rulemaking Low-Level Radioactive NRC-2011-21 High 3150-AI92 N/A 3/18/2009 N/A 7/18/2013 3/26/2015 11/30/2022 5/30/2023 337B 338B 341B Actions Waste Disposal 0012 336B 339B 340B 342B 343B 344B 345B 346B 347B 348B NuScale Small Modular Rulemaking NRC-2017-351B 22 Reactor Design High 3150-AJ98 N/A 3/23/2017 N/A 1/14/2021 7/1/2021 8/17/2022 350B 354B Actions 0029 349B 352B 353B 355B 356B 357B 358B 359B 360B Certification Performance-Based PRM 363B Rulemaking Emergency Core Cooling 3150- NRC-2008-367B 23 High 71, PRM- 3/31/2003 7/31/2008 3/1/2012 3/24/2014 3/16/2016 6/30/2022 362B 365B 366B Actions System Acceptance AH42 0332 361B 364B 368B 369B 370B 371B 372B 373B 50-84 Criteria 376B Regulatory Improvements for Production and Rulemaking NRC-2015-24 Utilization Facilities High 3150-AJ59 N/A 12/30/2014 11/27/2017 5/7/2018 3/3/2022 10/2/2023 5/6/2024 375B 379B Actions 0070 374B 377B 378B 380B 381B 382B 383B 384B 385B 386B Transitioning to Decommissioning Release of Veterinary Rulemaking NRC-2021-389B 25 Animals Containing High N/A N/A N/A N/A N/A N/A N/A N/A 388B 392B Actions 0027 387B 390B 391B 393B 394B 395B 396B 397B 398B 399B Byproduct Materials Renewing Nuclear Power Rulemaking NRC-2018-402B 26 Plant Operating Licenses - High 3150-AK32 N/A N/A N/A N/A N/A N/A N/A 401B 405B Actions 0296 400B 403B 404B 406B 407B 408B 409B 410B 411B 412B Environmental Review [5]

413B [4] The Commission issued an SRM directing the staff to provide a notation vote paper with a full range of options with respect to this rulemaking activity. (SRM-SECY-19-0100, "Staff Requirements - SECY-19-0100 - Discontinuation of Rulemaking - Independent Spent Fuel Storage Installation Security Requirements," dated August 4, 2021, ML21217A045) 414B [5] A rulemaking plan was provided to the Commission for review and approval on July 22, 2021 (SECY 21-0066). On February 24, 2022, the Commission disapproved the plan, and directed staff to resubmit a revised plan within 30 days. A revised rulemaking plan was provided to the Commission for review and approval on March 25, 2022 (SECY 22-0024).

4

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 430B Proposed 432B Final Rule 428B Regulatory Rule to 431B Proposed 433B to 435B Final 422B Associated Rulemaking 425B Basis Signature Rule 434B Signature 436B Rule 415B Item 419B CPR 423B PRM 426B Initiation Publication Authority Publication Authority Publication 437B 416B # 417B Category 418B Title Priority 420B RIN [1] 421B Docket ID 424B Numbers 427B Date 429B Date [2] Date [2] [2] 438B Date [2]

Revision of Fee Rulemaking NRC-2020-441B 27 Schedules: Fee Recovery High 3150-AK44 N/A 1/15/2020 N/A 1/12/2022 2/23/2022 5/12/2022 5/30/2022 440B 444B Actions 0031 439B 442B 443B 445B 446B 447B 448B 449B 450B 451B for FY 2022 Revision of Fee Rulemaking NRC-2021-454B 28 Schedules: Fee Recovery High 3150-AK58 N/A 1/6/2021 N/A 1/12/2023 1/25/2023 5/12/2023 5/25/2023 453B 457B Actions 0024 452B 455B 456B 458B 459B 460B 461B 462B 463B 464B for FY 2023 Revision of Fee Rulemaking NRC-2022-467B 29 Schedules: Fee Recovery High 3150-AK74 N/A N/A N/A N/A 1/25/2024 N/A 5/24/2024 466B 470B Actions 0046 465B 468B 469B 471B 472B 473B 474B 475B 476B 477B for FY 2024 480B Risk-Informed, Rulemaking Technology Inclusive NRC-2019-30 High 3150-AK31 N/A 10/2/2020 N/A 2/28/2023 8/28/2023 12/27/2024 6/27/2025 479B 483B Actions Regulatory Framework for 0062 478B 481B 482B 484B 485B 486B 487B 488B 489B 490B Advanced Reactors 493B U.S. Advanced Rulemaking Pressurized Water NRC-2010-31 High 3150-AI83 N/A 2/29/2008 N/A N/A N/A N/A N/A 492B 496B Actions Reactor (US-APWR) 0133 491B 494B 495B 497B 498B 499B 500B 501B 502B 503B Design Certification Rulemaking Updates for Emerging NRC-2018-32 High 2150-AK80 N/A 1/13/2022 4/13/2023 N/A 5/30/2024 9/12/2025 N/A 505B 506B 509B Actions Medical Technologies 0297 504B 507B 508B 510B 511B 512B 513B 514B 515B 516B Adjustment of Civil Rulemaking NRC-2021-519B 33 Penalties for Inflation for Medium 3150-AK59 N/A N/A N/A N/A N/A 1/3/2023 N/A 518B 522B Actions 0025 517B 520B 521B 523B 524B 525B 526B 527B 528B 529B Fiscal Year 2023 Adjustment of Civil Rulemaking NRC-2022-532B 34 Penalties for Inflation for Medium 3150-AK73 N/A N/A N/A N/A N/A 12/20/2023 1/15/2024 531B 535B Actions 0045 530B 533B 534B 536B 537B 538B 539B 540B 541B 542B Fiscal Year 2024 Alignment of Licensing PRM 545B Rulemaking Processes and Lessons NRC-2009-549B 35 Medium 3150-AI66 110, PRM- 9/22/2015 1/29/2021 5/26/2022 8/23/2022 3/14/2024 6/19/2024 544B 548B Actions Learned from New 0196 543B 546B 547B 550B 551B 552B 553B 554B 555B 171-1 Reactor Licensing Alternative Physical Rulemaking NRC-2017-558B 36 Security Requirements for Medium 3150-AK19 N/A 11/19/2018 7/16/2019 6/28/2022 11/14/2022 10/19/2023 6/14/2024 557B 561B Actions 0227 556B 559B 560B 562B 563B 564B 565B 566B 567B 568B Advanced Reactors Rulemaking Amendment to Access NRC-2020-37 Medium 3150-AK49 N/A 4/1/2020 N/A 10/29/2021 12/28/2021 10/29/2021 12/28/2021 570B 571B 574B Actions Authorization Fees [6] 0133 569B 572B 573B 575B 576B 577B 578B 579B 580B 581B 5

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 582B [6] The direct final rule was withdrawn on March 8, 2022, due to the receipt of a significant adverse comment. The NRC will publish a final rule that addresses the comment.

6

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 598B Proposed 600B Final Rule 596B Regulatory Rule to 599B Proposed 601B to 603B Final 590B Associated Rulemaking 593B Basis Signature Rule 602B Signature 604B Rule 583B Item 587B CPR 591B PRM 594B Initiation Publication Authority Publication Authority Publication 605B 584B # 585B Category 586B Title Priority 588B RIN [1] 589B Docket ID 592B Numbers 595B Date 597B Date [2] Date [2] [2] 606B Date [2]

Categorical Exclusions Rulemaking 3150- NRC-2018-609B 38 from Environmental Medium N/A 11/30/2020 N/A 9/16/2022 3/31/2023 5/10/2024 11/29/2024 608B 611B 612B Actions AK54 0300 607B 610B 613B 614B 615B 616B 617B 618B 619B Review Rulemaking Controlled Unclassified 3150- NRC-2019-39 Medium N/A 1/18/2019 N/A N/A N/A 8/15/2022 8/31/2022 621B 622B 624B 625B Actions Information AK30 0060 620B 623B 626B 627B 628B 629B 630B 631B 632B Cost-Benefit Analysis for Rulemaking 3150- NRC-2022-635B 40 Power Reactor Radwaste Medium N/A N/A N/A 2/28/2023 8/30/2023 8/30/2024 3/28/2025 634B 637B 638B Actions AK75 0048 633B 636B 639B 640B 641B 642B 643B 644B 645B Systems 648B Decommissioning Rulemaking Financial Assurance for 3150- NRC-2017-41 Medium PRM-30-66 10/13/2020 5/6/2022 2/17/2023 8/17/2023 5/31/2024 11/29/2024 647B 650B 651B Actions Sealed and Unsealed AK52 0031 646B 649B 652B 653B 654B 655B 656B 657B 658B Radioactive Materials Definition of Utilization Rulemaking NRC-2018-661B 42 Facility for Medical Medium N/A N/A N/A N/A N/A N/A N/A N/A 660B 664B Actions 0299 659B 662B 663B 665B 666B 667B 668B 669B 670B 671B Radioisotope Facilities 674B Emergency Preparedness Rulemaking Requirements for Small NRC-2015-43 Medium 3150-AJ68 N/A 6/22/2016 11/15/2017 10/12/2018 5/12/2020 12/30/2021 7/1/2022 673B 677B Actions Modular Reactors and 0225 672B 675B 676B 678B 679B 680B 681B 682B 683B 684B Other New Technologies Rulemaking Exempt Quantities in NRC-2021-44 Medium N/A N/A N/A N/A N/A N/A N/A N/A 686B 687B 690B Actions Schedule B 0077 685B 688B 689B 691B 692B 693B 694B 695B 696B 697B Financial Qualifications Rulemaking NRC-2014-700B 45 Requirements for Reactor Medium 3150-AJ43 N/A 4/24/2014 N/A 2/28/2018 7/22/2022 8/10/2022 2/27/2023 699B 703B Actions 0161 698B 701B 702B 704B 705B 706B 707B 708B 709B 710B Licensing 713B Geologic Repository Rulemaking Operations Area (GROA) NRC-2009-46 Medium 3150-AI38 N/A N/A 9/17/2040 3/17/2042 9/17/2042 9/17/2043 3/17/2044 712B 716B Actions Fitness-For-Duty 0089 711B 714B 715B 717B 718B 719B 720B 721B 722B 723B Requirements [7]

724B [7] This rulemaking activity is currently on hold. The dates listed are temporary placeholders pending the scheduling of an adjudicatory hearing on the DOE license application, which must be completed before the Commission decides whether to authorize construction of a geologic repository for high-level nuclear waste at Yucca Mountain, NV. The NRC will initiate requisite rulemaking activities pending the outcome of the licensing decision.

7

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 740B Proposed 738B Regulatory Rule to 741B Proposed Final Rule 742B 745B Final 732B Associated Rulemaking 735B Basis Signature Rule 743B to 746B Rule 725B Item 729B CPR 733B PRM 736B Initiation Publication Authority Publication Signature Publication 744B 747B 726B # 727B Category 728B Title Priority 730B RIN [1] 731B Docket ID 734B Numbers 737B Date 739B Date [2] Date2 Authority2 748B Date2 751B Geologic Repository Operations Area Security Rulemaking NRC-2007-47 and Material Control and Medium 3150-AI06 N/A N/A 3/16/2040 9/16/2041 3/16/2042 3/16/2043 7/15/2043 750B 754B Actions 0670 749B 752B 753B 755B 756B 757B 758B 759B 760B 761B Accounting Requirements

[8]

Groundwater Protection Rulemaking NRC-2008-764B 48 at Uranium In Situ Medium 3150-AI40 N/A 3/24/2006 N/A 7/22/2021 5/21/2022 9/22/2022 3/30/2023 763B 767B Actions 0421 762B 765B 766B 768B 769B 770B 771B 772B 773B 774B Recovery Facilities 777B Harmonization of Rulemaking Transportation Safety NRC-2016-49 Medium 3150-AJ85 N/A 8/19/2016 4/12/2019 10/30/2020 5/31/2022 3/31/2023 11/27/2023 776B 780B Actions Requirements with IAEA 0179 775B 778B 779B 781B 782B 783B 784B 785B 786B 787B Standards Rulemaking Industrial Radiographic NRC-2017-50 Medium N/A PRM-34-6 N/A N/A N/A N/A N/A N/A 789B 790B 793B Actions Operations and Training 0022 788B 791B 792B 794B 795B 796B 797B 798B 799B 800B Items Containing Rulemaking NRC-2015-803B 51 Byproduct Material Medium 3150-AJ54 PRM-30-65 8/13/2012 2/2/2021 1/19/2022 4/19/2022 12/21/2022 3/30/2023 802B 806B Actions 0017 801B 804B 805B 807B 808B 809B 810B 811B 812B 813B Incidental to Production Non-power Production or Rulemaking NRC-2011-816B 52 Utilization Facility License Medium 3150-AI96 N/A 8/26/2009 10/2/2012 4/7/2016 3/30/2017 6/17/2019 8/5/2022 815B 819B Actions 0087 814B 817B 818B 820B 821B 822B 823B 824B 825B 826B Renewal Reporting Requirements Rulemaking 3150- NRC-2020- PRM 829B 53 for Nonemergency Events Medium 7/28/2021 6/30/2022 4/28/2023 8/28/2023 4/29/2024 8/29/2024 828B 831B 832B 833B Actions AK71 0036 116 827B 830B 834B 835B 836B 837B 838B 839B at Nuclear Power Plants Rulemaking Revision of Administrative NRC-2018-54 Medium N/A N/A N/A N/A N/A N/A N/A N/A 841B 842B 845B Actions Requirements 0298 840B 843B 844B 846B 847B 848B 849B 850B 851B 852B Revision to the NRC's Rulemaking NRC-2014-855B 55 Acquisition Regulation Medium 3150-AJ36 N/A 6/1/2014 N/A N/A 6/30/2022 N/A 6/30/2022 854B 858B Actions 0033 853B 856B 857B 859B 860B 861B 862B 863B 864B 865B (NRCAR)

Transforming the NRCs Rulemaking NRC-2021-868B 56 Environmental Review Medium N/A N/A N/A N/A N/A N/A N/A N/A 867B 871B Actions 0029 866B 869B 870B 872B 873B 874B 875B 876B 877B 878B Process Rulemaking Alternatives to the Use of NRC-2017-57 Low 3150-AJ92 N/A 9/1/2014 N/A 4/29/2022 10/31/2022 7/31/2023 1/30/2024 880B 881B 884B Actions Credit Ratings 0021 879B 882B 883B 885B 886B 887B 888B 889B 890B 891B 892B [8] This rulemaking activity is currently on hold. The dates listed are temporary placeholders pending the scheduling of an adjudicatory hearing on the DOE license application, which must be completed before the Commission decides whether to authorize construction of a geologic repository for high-level nuclear waste at Yucca Mountain, NV. The NRC will initiate requisite rulemaking activities pending the outcome of the licensing decision.

8

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 910B Final 906B Regulatory Proposed Proposed 908B 909B Rule 913B Final 900B Associated Rulemaking 903B Basis Rule to Rule 911B to 914B Rule 893B Item 897B CPR 901B PRM 904B Initiation Publication Signature Publication Signature Publication 912B 915B 894B # 895B Category 896B Title Priority 898B RIN1 899B Docket ID 902B Numbers 905B Date 907B Date Authority2 Date2 Authority2 916B Date2 919B Cost Recovery Criteria for Rulemaking Research and NRC-2020-58 Low N/A N/A N/A 6/30/2022 1/31/2023 6/30/2023 4/30/2024 10/30/2024 918B 922B Actions Development Utilization 0071 917B 920B 921B 923B 924B 925B 926B 927B 928B 929B Facilities Rulemaking Miscellaneous Corrections NRC-2021-59 Low 3150-AK72 N/A 9/2/2021 N/A N/A N/A 4/21/2022 4/29/2022 931B 932B 935B Actions Rule for Spring 2022 0171 930B 933B 934B 936B 937B 938B 939B 940B 941B 942B 945B Accident Source Term Petition Methodologies and NRC-2020- PRM 60 N/A N/A N/A N/A N/A N/A N/A N/A 944B 948B 949B Actions Corresponding Release 0150 122 943B 946B 947B 950B 951B 952B 953B 954B 955B Fractions 958B Advance Tribal Petition Notification of Certain NRC-2021-61 N/A N/A PRM-37-2 N/A N/A N/A N/A N/A N/A 957B 961B Actions Radioactive Material 0051 956B 959B 960B 962B 963B 964B 965B 966B 967B 968B Shipments Alternative Method for Petition NRC-2019- PRM 971B 62 Calculating Embrittlement N/A N/A N/A N/A N/A N/A N/A N/A 970B 974B 975B Actions 0180 120 969B 972B 973B 976B 977B 978B 979B 980B 981B for Steel Reactor Vessels Public Protective Actions Petition NRC-2020- PRM 984B 63 During a General N/A N/A N/A N/A N/A N/A N/A N/A 983B 987B 988B Actions 0155 123 982B 985B 986B 989B 990B 991B 992B 993B 994B Emergency 997B Reporting Nuclear Petition Medicine Injection NRC-2020-64 N/A N/A PRM-35-22 N/A N/A N/A N/A N/A N/A 996B 1000B Actions Extravasations as Medical 0141 995B 998B 999B 1001B 1002B 1003B 1004B 1005B 1006B 1007B Events Voluntary Adoption of Petition NRC-2020- PRM 1010B 65 Revised Design Basis N/A N/A N/A N/A N/A N/A N/A N/A 1009B 1013B 1014B Actions 0055 121 1008B 1011B 1012B 1015B 1016B 1017B 1018B 1019B 1020B Accident Dose Criteria 9