Semiannual Report to Congress on the Status of NRC Licensing and Regulatory Duties Attachment
ML22117A075
Person / Time
Issue date: 05/09/2022
From: Christopher Hanson
NRC/Chairman
To: Carper T, Feinstein D, Kaptur M, Markey E, Pallone F, Tonko P
US HR (House of Representatives), US HR, Comm on Appropriations, US HR, Comm on Energy & Commerce, US HR, Subcomm on Energy, US HR, Subcomm on Energy & Water Development, US HR, Subcomm on Environment and Climate Change, US SEN (Senate), US SEN, Comm on Appropriations, US SEN, Comm on Environment & Public Works, US SEN, Subcomm on Clean Air, Climate Change & Nuclear Safety, US SEN, Subcomm on Energy & Water Development
Mroz S
Shared Package
ML22117A069 List:
References
CORR-22-0036
Download: ML22117A075 (9)


Text

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 1 1BItem 2B#

3BCategory 4BTitle 5BCPR Priority 6BRIN [1]

7BDocket ID 8BAssociated 9BPRM 10BNumbers 11BRulemaking 12BInitiation 13BDate 14BRegulatory Basis Publication 15BDate 16BProposed Rule to Signature Authority

[2]

17BProposed Rule Publication Date [2]

18BFinal Rule 19Bto 20BSignature Authority

[2]

21BFinal 22BRule 23BPublication 24BDate [2]

25B1 26BRulemaking Actions 27B2021 Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code 28BHigh 29B3150-AK21 30BNRC-2018-0289 31BN/A 32B12/12/2018 33BN/A 34BN/A 35BN/A 36BN/A 37BN/A 38B2 39BRulemaking Actions 40B2022 Edition of the American Society of Mechanical Engineers Operations and Maintenance Code 41BHigh 42B3150-AK43 43BNRC-2020-0030 44BN/A 45B12/12/2019 46BN/A 47BN/A 48BN/A 49BN/A 50BN/A 51B3 52BRulemaking Actions 53B2023 Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code 54BHigh 55B3150-AK42 56BNRC-2020-0029 57BN/A 58B12/12/2019 59BN/A 60BN/A 61BN/A 62BN/A 63BN/A 64B4 65BRulemaking Actions 66B2024 Edition of the American Society of Mechanical Engineers Operations and Maintenance Code 67BHigh 68B3150-AK62 69BNRC-2021-0022 70BN/A 71B1/6/2021 72BN/A 73BN/A 74BN/A 75BN/A 76BN/A 77B5 78BRulemaking Actions 79B2025 Edition of the American Society of Mechanical Engineers Boiler and Pressure Vessel Code 80BHigh 81B3150-AK77 82BNRC-2022-0017 83BN/A 84BN/A 85BN/A 86BN/A 87BN/A 88BN/A 89BN/A 90B6 91BRulemaking Actions 92BAdvanced Nuclear Reactor Generic Environmental Impact Statement 93BHigh 94B3150-AK55 95BNRC-2020-0101 96BN/A 97B9/21/2020 98BN/A 99B11/30/2021 100B5/30/2022 101B5/1/2023 102B1/2/2024 103B7 104BRulemaking Actions 105BAmerican Society of Mechanical Engineers 2019 - 2020 Code Editions 106BHigh 107B3150-AK22 108BNRC-2018-0290 109BN/A 110B12/12/2018 111BN/A 112B3/3/2021 113B3/26/2021 114B2/24/2022 115B6/30/2022 116BAttachment 117B[1] Rulemaking activities without a Regulation Identification Number (RIN) have not been approved by the Commission for the NRC staff to begin rulemaking but are included in the table for completeness because the staff has submitted or is preparing rulemaking plans.

0B[2] These dates are NRC staff estimates. The actual dates are subject to Commission action.

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 2 118BItem 119B#

120BCategory 121BTitle 122BCPR Priority 123BRIN [1]

124BDocket ID 125BAssociated 126BPRM 127BNumbers 128BRulemaking 129BInitiation 130BDate 131BRegulatory Basis Publication 132BDate 133BProposed Rule to Signature Authority

[2]

134BProposed Rule Publication Date [2]

135BFinal Rule 136Bto 137BSignature Authority

[2]

138BFinal 139BRule 140BPublication 141BDate [2]

142B8 143BRulemaking Actions 144BApproval of American Society of Mechanical Engineers Code Cases, Revision 40 145BHigh 146B3150-AK23 147BNRC-2018-0291 148BN/A 149B12/12/2018 150BN/A 151BN/A 152BN/A 153BN/A 154BN/A 155B9 156BRulemaking Actions 157BApproval of American Society of Mechanical Engineers Code Cases, Revision 41 158BHigh 159B3150-AK61 160BNRC-2021-0023 161BN/A 162B1/6/2021 163BN/A 164BN/A 165BN/A 166BN/A 167BN/A 168B10 169BRulemaking Actions 170BCyber Security for Fuel Facilities 171BHigh 172B3150-AJ64 173BNRC-2015-0179 174BN/A 175B3/24/2015 176B4/12/2016 177B10/4/2017 178B9/15/2022 179B7/28/2023 180B1/26/2024 181B11 182BRulemaking Actions 183BDrug and Alcohol Testing:

Technical Issues and Editorial Changes 184BHigh 185B3150-AJ15 186BNRC-2012-0079 187BPRM-26-4, PRM-26-7, PRM-26-8 188BN/A 189B2/1/2023 190B1/2/2024 191B4/1/2024 192B1/2/2025 193B4/1/2025 194B12 195BRulemaking Actions 196BEnhanced Security for Special Nuclear Material

[3]

197BHigh 198B3150-AJ41 199BNRC-2014-0118 200BN/A 201B2/8/2006 202BN/A 203B1/5/2023 204B7/5/2023 205B1/5/2024 206B7/5/2024 207B13 208BRulemaking Actions 209BEnhanced Weapons for Spent Fuel Storage Installations and TransportationSection 161A Authority 210BHigh 211B3150-AJ55 212BNRC-2015-0018 213BN/A 214B8/15/2008 215BN/A 216B1/31/2024 217B4/27/2023 218B1/31/2025 219B6/28/2025 220B14 221BRulemaking Actions 222BEnhanced Weapons, Firearms Background Checks, and Security Event Notifications 223BHigh 224B3150-AI49 225BNRC-2011-0018 226BN/A 227B8/8/2005 228BN/A 229B3/16/2015 230B9/22/2015 231B5/21/2018 232B9/30/2022 233B15 234BRulemaking Actions 235BFitness-for-Duty Drug Testing Program Requirements 236BHigh 237B3150-AI67 238BNRC-2009-0225 239BN/A 240B9/1/2012 241B7/1/2013 242B2/22/2017 243B9/16/2019 244B9/15/2021 245B6/15/2022 246B16 247BRulemaking Actions 248BGreater-Than-Class-C and Transuranic Waste 249BHigh 250B3150-AK00 251BNRC-2017-0081 252BN/A 253B12/22/2015 254B7/22/2019 255BN/A 256BN/A 257BN/A 258BN/A 259B17 260BRulemaking Actions 261BIncreased Enrichment of Conventional and Accident Tolerant Fuel Designs for Light-Water Reactors 262BHigh 263B3150-AK79 264BNRC-2020-0034 265BN/A 266B3/16/2022 267B9/16/2023 268BN/A 269BN/A 270BN/A 271BN/A

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 3 272B[3] The Commission issued a staff requirements memorandum (SRM) directing the staff to provide a notation vote paper with a full range of options with respect to this rulemaking activity. (SRM-SECY-19-0095, "Staff Requirements - SECY-19-0095-Discontinuation of Rulemaking - Enhanced Security of Special Nuclear Material," dated August 4, 2021, ML21217A065).

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 4 273BItem 274B#

275BCategory 276BTitle 277BCPR Priority 278BRIN [1]

279BDocket ID 280BAssociated 281BPRM 282BNumbers 283BRulemaking 284BInitiation 285BDate 286BRegulatory Basis Publication 287BDate 288BProposed Rule to Signature Authority

[2]

289BProposed Rule Publication Date [2]

290BFinal Rule 291Bto 292BSignature Authority

[2]

293BFinal 294BRule 295BPublication 296BDate [2]

297B18 298BRulemaking Actions 299BIndependent Spent Fuel Storage Installation Security Requirements [4]

300BHigh 301B3150-AI78 302BNRC-2009-0558 303BPRM-72-6 304BN/A 305BN/A 306B1/5/2023 307B7/5/2023 308B1/5/2024 309B7/5/2024 310B19 311BRulemaking Actions 312BIntegrated Radioactive Source Security and Accountability 313BHigh 314BN/A 315BNRC-2015-0094 316BPRM-37-1 317BN/A 318BN/A 319BN/A 320BN/A 321BN/A 322BN/A 323B20 324BRulemaking Actions 325BList of Approved Spent Fuel Storage Casks: NAC International Inc., NAC-UMS Universal Storage System, Certificate of Compliance No. 1015, Amendment No. 9 326BHigh 327B3150-AK76 328BNRC-2022-0049 329BN/A 330B2/1/2022 331BN/A 332B5/26/2022 333B6/27/2022 334B5/26/2022 335B6/27/2022 336B21 337BRulemaking Actions 338BLow-Level Radioactive Waste Disposal 339BHigh 340B3150-AI92 341BNRC-2011-0012 342BN/A 343B3/18/2009 344BN/A 345B7/18/2013 346B3/26/2015 347B11/30/2022 348B5/30/2023 349B22 350BRulemaking Actions 351BNuScale Small Modular Reactor Design Certification 352BHigh 353B3150-AJ98 354BNRC-2017-0029 355BN/A 356B3/23/2017 357BN/A 358B1/14/2021 359B7/1/2021 360B8/17/2022 361B23 362BRulemaking Actions 363BPerformance-Based Emergency Core Cooling System Acceptance Criteria 364BHigh 365B3150-AH42 366BNRC-2008-0332 367BPRM 71, PRM-50-84 368B3/31/2003 369B7/31/2008 370B3/1/2012 371B3/24/2014 372B3/16/2016 373B6/30/2022 374B24 375BRulemaking Actions 376BRegulatory Improvements for Production and Utilization Facilities Transitioning to Decommissioning 377BHigh 378B3150-AJ59 379BNRC-2015-0070 380BN/A 381B12/30/2014 382B11/27/2017 383B5/7/2018 384B3/3/2022 385B10/2/2023 386B5/6/2024 387B25 388BRulemaking Actions 389BRelease of Veterinary Animals Containing Byproduct Materials 390BHigh 391BN/A 392BNRC-2021-0027 393BN/A 394BN/A 395BN/A 396BN/A 397BN/A 398BN/A 399BN/A 400B26 401BRulemaking Actions 402BRenewing Nuclear Power Plant Operating Licenses -

Environmental Review [5]

403BHigh 404B3150-AK32 405BNRC-2018-0296 406BN/A 407BN/A 408BN/A 409BN/A 410BN/A 411BN/A 412BN/A 413B[4] The Commission issued an SRM directing the staff to provide a notation vote paper with a full range of options with respect to this rulemaking activity. (SRM-SECY-19-0100, "Staff Requirements - SECY-19-0100 - Discontinuation of Rulemaking - Independent Spent Fuel Storage Installation Security Requirements," dated August 4, 2021, ML21217A045) 414B[5] A rulemaking plan was provided to the Commission for review and approval on July 22, 2021 (SECY 21-0066). On February 24, 2022, the Commission disapproved the plan, and directed staff to resubmit a revised plan within 30 days. A revised rulemaking plan was provided to the Commission for review and approval on March 25, 2022 (SECY 22-0024).

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 5 415BItem 416B#

417BCategory 418BTitle 419BCPR Priority 420BRIN [1]

421BDocket ID 422BAssociated 423BPRM 424BNumbers 425BRulemaking 426BInitiation 427BDate 428BRegulatory Basis Publication 429BDate 430BProposed Rule to Signature Authority

[2]

431BProposed Rule Publication Date [2]

432BFinal Rule 433Bto 434BSignature Authority

[2]

435BFinal 436BRule 437BPublication 438BDate [2]

439B27 440BRulemaking Actions 441BRevision of Fee Schedules: Fee Recovery for FY 2022 442BHigh 443B3150-AK44 444BNRC-2020-0031 445BN/A 446B1/15/2020 447BN/A 448B1/12/2022 449B2/23/2022 450B5/12/2022 451B5/30/2022 452B28 453BRulemaking Actions 454BRevision of Fee Schedules: Fee Recovery for FY 2023 455BHigh 456B3150-AK58 457BNRC-2021-0024 458BN/A 459B1/6/2021 460BN/A 461B1/12/2023 462B1/25/2023 463B5/12/2023 464B5/25/2023 465B29 466BRulemaking Actions 467BRevision of Fee Schedules: Fee Recovery for FY 2024 468BHigh 469B3150-AK74 470BNRC-2022-0046 471BN/A 472BN/A 473BN/A 474BN/A 475B1/25/2024 476BN/A 477B5/24/2024 478B30 479BRulemaking Actions 480BRisk-Informed, Technology Inclusive Regulatory Framework for Advanced Reactors 481BHigh 482B3150-AK31 483BNRC-2019-0062 484BN/A 485B10/2/2020 486BN/A 487B2/28/2023 488B8/28/2023 489B12/27/2024 490B6/27/2025 491B31 492BRulemaking Actions 493BU.S. Advanced Pressurized Water Reactor (US-APWR)

Design Certification 494BHigh 495B3150-AI83 496BNRC-2010-0133 497BN/A 498B2/29/2008 499BN/A 500BN/A 501BN/A 502BN/A 503BN/A 504B32 505BRulemaking Actions 506BUpdates for Emerging Medical Technologies 507BHigh 508B2150-AK80 509BNRC-2018-0297 510BN/A 511B1/13/2022 512B4/13/2023 513BN/A 514B5/30/2024 515B9/12/2025 516BN/A 517B33 518BRulemaking Actions 519BAdjustment of Civil Penalties for Inflation for Fiscal Year 2023 520BMedium 521B3150-AK59 522BNRC-2021-0025 523BN/A 524BN/A 525BN/A 526BN/A 527BN/A 528B1/3/2023 529BN/A 530B34 531BRulemaking Actions 532BAdjustment of Civil Penalties for Inflation for Fiscal Year 2024 533BMedium 534B3150-AK73 535BNRC-2022-0045 536BN/A 537BN/A 538BN/A 539BN/A 540BN/A 541B12/20/2023 542B1/15/2024 543B35 544BRulemaking Actions 545BAlignment of Licensing Processes and Lessons Learned from New Reactor Licensing 546BMedium 547B3150-AI66 548BNRC-2009-0196 549BPRM 110, PRM-171-1 550B9/22/2015 551B1/29/2021 552B5/26/2022 553B8/23/2022 554B3/14/2024 555B6/19/2024 556B36 557BRulemaking Actions 558BAlternative Physical Security Requirements for Advanced Reactors 559BMedium 560B3150-AK19 561BNRC-2017-0227 562BN/A 563B11/19/2018 564B7/16/2019 565B6/28/2022 566B11/14/2022 567B10/19/2023 568B6/14/2024 569B37 570BRulemaking Actions 571BAmendment to Access Authorization Fees [6]

572BMedium 573B3150-AK49 574BNRC-2020-0133 575BN/A 576B4/1/2020 577BN/A 578B10/29/2021 579B12/28/2021 580B10/29/2021 581B12/28/2021

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 6 582B[6] The direct final rule was withdrawn on March 8, 2022, due to the receipt of a significant adverse comment. The NRC will publish a final rule that addresses the comment.

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 7 583BItem 584B#

585BCategory 586BTitle 587BCPR Priority 588BRIN [1]

589BDocket ID 590BAssociated 591BPRM 592BNumbers 593BRulemaking 594BInitiation 595BDate 596BRegulatory Basis Publication 597BDate 598BProposed Rule to Signature Authority

[2]

599BProposed Rule Publication Date [2]

600BFinal Rule 601Bto 602BSignature Authority

[2]

603BFinal 604BRule 605BPublication 606BDate [2]

607B38 608BRulemaking Actions 609BCategorical Exclusions from Environmental Review 610BMedium 611B3150-AK54 612BNRC-2018-0300 613BN/A 614B11/30/2020 615BN/A 616B9/16/2022 617B3/31/2023 618B5/10/2024 619B11/29/2024 620B39 621BRulemaking Actions 622BControlled Unclassified Information 623BMedium 624B3150-AK30 625BNRC-2019-0060 626BN/A 627B1/18/2019 628BN/A 629BN/A 630BN/A 631B8/15/2022 632B8/31/2022 633B40 634BRulemaking Actions 635BCost-Benefit Analysis for Power Reactor Radwaste Systems 636BMedium 637B3150-AK75 638BNRC-2022-0048 639BN/A 640BN/A 641BN/A 642B2/28/2023 643B8/30/2023 644B8/30/2024 645B3/28/2025 646B41 647BRulemaking Actions 648BDecommissioning Financial Assurance for Sealed and Unsealed Radioactive Materials 649BMedium 650B3150-AK52 651BNRC-2017-0031 652BPRM-30-66 653B10/13/2020 654B5/6/2022 655B2/17/2023 656B8/17/2023 657B5/31/2024 658B11/29/2024 659B42 660BRulemaking Actions 661BDefinition of Utilization Facility for Medical Radioisotope Facilities 662BMedium 663BN/A 664BNRC-2018-0299 665BN/A 666BN/A 667BN/A 668BN/A 669BN/A 670BN/A 671BN/A 672B43 673BRulemaking Actions 674BEmergency Preparedness Requirements for Small Modular Reactors and Other New Technologies 675BMedium 676B3150-AJ68 677BNRC-2015-0225 678BN/A 679B6/22/2016 680B11/15/2017 681B10/12/2018 682B5/12/2020 683B12/30/2021 684B7/1/2022 685B44 686BRulemaking Actions 687BExempt Quantities in Schedule B 688BMedium 689BN/A 690BNRC-2021-0077 691BN/A 692BN/A 693BN/A 694BN/A 695BN/A 696BN/A 697BN/A 698B45 699BRulemaking Actions 700BFinancial Qualifications Requirements for Reactor Licensing 701BMedium 702B3150-AJ43 703BNRC-2014-0161 704BN/A 705B4/24/2014 706BN/A 707B2/28/2018 708B7/22/2022 709B8/10/2022 710B2/27/2023 711B46 712BRulemaking Actions 713BGeologic Repository Operations Area (GROA)

Fitness-For-Duty Requirements [7]

714BMedium 715B3150-AI38 716BNRC-2009-0089 717BN/A 718BN/A 719B9/17/2040 720B3/17/2042 721B9/17/2042 722B9/17/2043 723B3/17/2044 724B[7] This rulemaking activity is currently on hold. The dates listed are temporary placeholders pending the scheduling of an adjudicatory hearing on the DOE license application, which must be completed before the Commission decides whether to authorize construction of a geologic repository for high-level nuclear waste at Yucca Mountain, NV. The NRC will initiate requisite rulemaking activities pending the outcome of the licensing decision.

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 8 725BItem 726B#

727BCategory 728BTitle 729BCPR Priority 730BRIN [1]

731BDocket ID 732BAssociated 733BPRM 734BNumbers 735BRulemaking 736BInitiation 737BDate 738BRegulatory Basis Publication 739BDate 740BProposed Rule to Signature Authority

[2]

741BProposed Rule Publication Date2 742BFinal Rule 743Bto 744BSignature Authority2 745BFinal 746BRule 747BPublication 748BDate2 749B47 750BRulemaking Actions 751BGeologic Repository Operations Area Security and Material Control and Accounting Requirements

[8]

752BMedium 753B3150-AI06 754BNRC-2007-0670 755BN/A 756BN/A 757B3/16/2040 758B9/16/2041 759B3/16/2042 760B3/16/2043 761B7/15/2043 762B48 763BRulemaking Actions 764BGroundwater Protection at Uranium In Situ Recovery Facilities 765BMedium 766B3150-AI40 767BNRC-2008-0421 768BN/A 769B3/24/2006 770BN/A 771B7/22/2021 772B5/21/2022 773B9/22/2022 774B3/30/2023 775B49 776BRulemaking Actions 777BHarmonization of Transportation Safety Requirements with IAEA Standards 778BMedium 779B3150-AJ85 780BNRC-2016-0179 781BN/A 782B8/19/2016 783B4/12/2019 784B10/30/2020 785B5/31/2022 786B3/31/2023 787B11/27/2023 788B50 789BRulemaking Actions 790BIndustrial Radiographic Operations and Training 791BMedium 792BN/A 793BNRC-2017-0022 794BPRM-34-6 795BN/A 796BN/A 797BN/A 798BN/A 799BN/A 800BN/A 801B51 802BRulemaking Actions 803BItems Containing Byproduct Material Incidental to Production 804BMedium 805B3150-AJ54 806BNRC-2015-0017 807BPRM-30-65 808B8/13/2012 809B2/2/2021 810B1/19/2022 811B4/19/2022 812B12/21/2022 813B3/30/2023 814B52 815BRulemaking Actions 816BNon-power Production or Utilization Facility License Renewal 817BMedium 818B3150-AI96 819BNRC-2011-0087 820BN/A 821B8/26/2009 822B10/2/2012 823B4/7/2016 824B3/30/2017 825B6/17/2019 826B8/5/2022 827B53 828BRulemaking Actions 829BReporting Requirements for Nonemergency Events at Nuclear Power Plants 830BMedium 831B3150-AK71 832BNRC-2020-0036 833BPRM 116 834B7/28/2021 835B6/30/2022 836B4/28/2023 837B8/28/2023 838B4/29/2024 839B8/29/2024 840B54 841BRulemaking Actions 842BRevision of Administrative Requirements 843BMedium 844BN/A 845BNRC-2018-0298 846BN/A 847BN/A 848BN/A 849BN/A 850BN/A 851BN/A 852BN/A 853B55 854BRulemaking Actions 855BRevision to the NRC's Acquisition Regulation (NRCAR) 856BMedium 857B3150-AJ36 858BNRC-2014-0033 859BN/A 860B6/1/2014 861BN/A 862BN/A 863B6/30/2022 864BN/A 865B6/30/2022 866B56 867BRulemaking Actions 868BTransforming the NRCs Environmental Review Process 869BMedium 870BN/A 871BNRC-2021-0029 872BN/A 873BN/A 874BN/A 875BN/A 876BN/A 877BN/A 878BN/A 879B57 880BRulemaking Actions 881BAlternatives to the Use of Credit Ratings 882BLow 883B3150-AJ92 884BNRC-2017-0021 885BN/A 886B9/1/2014 887BN/A 888B4/29/2022 889B10/31/2022 890B7/31/2023 891B1/30/2024 892B[8] This rulemaking activity is currently on hold. The dates listed are temporary placeholders pending the scheduling of an adjudicatory hearing on the DOE license application, which must be completed before the Commission decides whether to authorize construction of a geologic repository for high-level nuclear waste at Yucca Mountain, NV. The NRC will initiate requisite rulemaking activities pending the outcome of the licensing decision.

xx xx U.S. Nuclear Regulatory Commission Rulemaking Activities Planned (As of April 1, 2022) 9 893BItem 894B#

895BCategory 896BTitle 897BCPR Priority 898BRIN1 899BDocket ID 900BAssociated 901BPRM 902BNumbers 903BRulemaking 904BInitiation 905BDate 906BRegulatory Basis Publication 907BDate 908BProposed Rule to Signature Authority2 909BProposed Rule Publication Date2 910BFinal Rule 911Bto 912BSignature Authority2 913BFinal 914BRule 915BPublication 916BDate2 917B58 918BRulemaking Actions 919BCost Recovery Criteria for Research and Development Utilization Facilities 920BLow 921BN/A 922BNRC-2020-0071 923BN/A 924BN/A 925B6/30/2022 926B1/31/2023 927B6/30/2023 928B4/30/2024 929B10/30/2024 930B59 931BRulemaking Actions 932BMiscellaneous Corrections Rule for Spring 2022 933BLow 934B3150-AK72 935BNRC-2021-0171 936BN/A 937B9/2/2021 938BN/A 939BN/A 940BN/A 941B4/21/2022 942B4/29/2022 943B60 944BPetition Actions 945BAccident Source Term Methodologies and Corresponding Release Fractions 946BN/A 947BN/A 948BNRC-2020-0150 949BPRM 122 950BN/A 951BN/A 952BN/A 953BN/A 954BN/A 955BN/A 956B61 957BPetition Actions 958BAdvance Tribal Notification of Certain Radioactive Material Shipments 959BN/A 960BN/A 961BNRC-2021-0051 962BPRM-37-2 963BN/A 964BN/A 965BN/A 966BN/A 967BN/A 968BN/A 969B62 970BPetition Actions 971BAlternative Method for Calculating Embrittlement for Steel Reactor Vessels 972BN/A 973BN/A 974BNRC-2019-0180 975BPRM 120 976BN/A 977BN/A 978BN/A 979BN/A 980BN/A 981BN/A 982B63 983BPetition Actions 984BPublic Protective Actions During a General Emergency 985BN/A 986BN/A 987BNRC-2020-0155 988BPRM 123 989BN/A 990BN/A 991BN/A 992BN/A 993BN/A 994BN/A 995B64 996BPetition Actions 997BReporting Nuclear Medicine Injection Extravasations as Medical Events 998BN/A 999BN/A 1000BNRC-2020-0141 1001BPRM-35-22 1002BN/A 1003BN/A 1004BN/A 1005BN/A 1006BN/A 1007BN/A 1008B65 1009BPetition Actions 1010BVoluntary Adoption of Revised Design Basis Accident Dose Criteria 1011BN/A 1012BN/A 1013BNRC-2020-0055 1014BPRM 121 1015BN/A 1016BN/A 1017BN/A 1018BN/A 1019BN/A 1020BN/A