ML22042A095

From kanterella
Revision as of 15:31, 18 April 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Kairos Power LLC, Transmittal of Changes to Hermes Construction Permit Application
Date released: 02/28/2022 Download: ML22042A095


Kairos Power LLC, Chapter 2, Environmental Report
ML22042A098
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 02/10/2022
From:
Kairos Power
To:
Office of Nuclear Reactor Regulation
References
KP-NRC-2202-005
Download: ML22042A098 (18)
Kairos Power LLC, Preliminary Safety Analysis Report
ML22042A097
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 02/10/2022
From:
Kairos Power
To:
Office of Nuclear Reactor Regulation
References
KP-NRC-2202-005
Download: ML22042A097 (10)
Kairos Power LLC, Transmittal of Changes to Hermes Construction Permit Application
ML22042A096
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 02/10/2022
From: Hastings P
Kairos Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
KP-NRC-2202-005
Download: ML22042A096 (4)