Kairos Power LLC, Transmittal of Changes to Hermes Construction Permit Application
ML22042A096
Person / Time
Site: Hermes File:Kairos Power icon.png
Issue date: 02/10/2022
From: Hastings P
Kairos Power
To:
Document Control Desk, Office of Nuclear Reactor Regulation
Shared Package
ML22042A095 List:
References
KP-NRC-2202-005
Download: ML22042A096 (4)


Text

KP-NRC-2202-005 February 10, 2022 Docket No. 50-7513 US Nuclear Regulatory Commission ATTN: Document Control Desk Washington, DC 20555-0001

Subject:

Kairos Power LLC Transmittal of Changes to Hermes Construction Permit Application

References:

1. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Preliminary Safety Analysis Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), September 29, 2021 (ML21272A376)
2. Letter, Kairos Power LLC to Document Control Desk, Submittal of the Environmental Report for the Kairos Power Fluoride Salt-Cooled, High Temperature Non-Power Reactor (Hermes), October 31, 2021 (ML21306A131)
2. Kairos Power LLC to Document Control Desk, Graphite Material Qualification for the Kairos Power Fluoride Salt-Cooled High-Temperature Reactor, KP-TR-014, Revision 1, July 8, 2021 (ML21190A220)
3. Kairos Power LLC to Document Control Desk, Metallic Materials Qualification for the Kairos Power Fluoride Salt-Cooled High Temperature Reactor, KP-TR-013, Revision 0, June 30, 2020 (ML20182A800)

In September and October 2021, Kairos Power submitted a Construction Permit Application (CPA) for the Hermes non-power reactor, including a Preliminary Safety Analysis Report (PSAR) (Reference 1) and an Environmental Report (ER) (Reference 2). Subsequent to the initial submittal of these documents, Kairos Power made a decision to reduce the Hermes operating life from 10 years to 4 years. This change has a negligible impact on the CPA but has a minor effect on content in Chapters 1, 2, 4, 9, 13, and 15 of the PSAR and Chapters 2, 4, and 5 of the ER. Kairos Power requests NRC review of these changes as part of continued review of the Hermes CPA.

Changes to the pages of the PSAR affected by this decision are provided in Enclosure 1. Changes to the pages of the ER affected by this decision are provided in Enclosure 2.

This change also impacts two topical reports referenced in the CPA that are currently under review by NRC staff, KP-TR-014 (Reference 2) and KP-TR-013 (Reference 3). Kairos Power will provide updates to these reports as part of changes to these documents that are occurring as part of their review process.

Kairos Power LLC www.kairospower.com 707 W Tower Ave, Suite A 5201 Hawking Dr SE, Unit A 2115 Rexford Rd, Suite 325 Alameda, CA 94501 Albuquerque, NM 87106 Charlotte, NC 28211

KP-NRC-2202-005 Page 2 If you have any questions or need any additional information, please contact Drew Peebles at peebles@kairospower.com or at (704) 275-5388 or Darrell Gardner at gardner@kairospower.com or (704) 769-1226.

I declare under penalty of perjury that the foregoing is true and correct.

Executed on February 10, 2022.

Peter Hastings, PE Vice President, Regulatory Affairs and Quality

Enclosures:

1) Change Pages for PSAR
2) Change Pages for ER xc (w/enclosure):

William Kennedy, Acting Chief, NRR Advanced Reactor Licensing Branch Benjamin Beasley, Project Manager, NRR Advanced Reactor Licensing Branch Edward Helvenston, Project Manager, NRR Advanced Reactor Licensing Branch Samuel de Jesus Cuadrado, Project Manager, NRR Advanced Reactor Licensing Branch Tamsen Dozier, Environmental Project Manager, NMSS, Environmental Review Branch Peyton Doub, Environmental Project Manager, NMSS, Environmental Review Branch

Enclosure 1 Change Pages for PSAR (Non-Proprietary)

Enclosure 2 Change Pages for ER (Non-Proprietary)