ML22073A123

From kanterella
Revision as of 21:53, 5 April 2022 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
SLR License
ML22073A123
Person / Time
Site: Turkey Point  NextEra Energy icon.png
Issue date: 03/25/2022
From: Vaughn Thomas
NRC/NRR/DNRL/NLRP
To: Coffey B
Florida Power & Light Co
Thomas V
Shared Package
ML22073A121 List:
References
Download: ML22073A123 (1)


Text

8 spray piping headers (3A and 3B) at penetrations P-19A and P-19B to a minimum plant elevation of 65 feet inside containment. FPL shall notify the NRC in writing within 60 days following completion of the refueling outage during which the piping replacement is completed. The notification will confirm the elevation of the air-to-borated-water interface inside the piping and confirm that the installation of the stainless steel piping exceeds this elevation.

4. This subsequent renewed license is effective as of the date of issuance, and shall expire at midnight July 19, 2032.

FOR THE NUCLEAR REGULATORY COMMISSION

/RA/

Ho K. Nieh, Director Office of Nuclear Reactor Regulation Attachments:

Appendix A - Technical Specifications for Unit 3 Appendix B - Environmental Protection Plan Date of Issuance: December 4, 2019 Subsequent Renewed License No. DPR-31