ML21152A302

From kanterella
Revision as of 16:01, 20 January 2022 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Date a Response Is Due for Inspection Report 050004072020201
ML21152A302
Person / Time
Site: University of Utah
Issue date: 05/25/2021
From: Bassett C
NRC/NRR/DANU/UNPO
To: Sjoden G
NRC/NRR/DANU/UNPO
Bassett C
References
IR 2020201
Download: ML21152A302 (1)


See also: IR 05000407/2020201

Text

From: Bassett, Craig

To: Glenn Eric Sjoden

Cc: Tate, Travis

Subject: Date a response is due for Inspection Report 05000407/2020201

Date: Tuesday, May 25, 2021 1:22:00 PM

Dr. Sjoden,

You asked about the inspection report (IR) you received concerning an inspection that was

conducted in October 2020 and when you were required to respond to the report. The

NRC has experienced a few issues with our document system (ADAMS) recently which

prevented some documents from being declared as an Official Document in the system.

That was the case with IR 05000407/2020201, Accession Number ML20304A216, you

received today, May 25, 2021. Because of these issues with ADAMS, you received the IR

considerably later than usual. Therefore please note that you will have 30 days from the

date you received the inspection report to respond. Your response will be due on June 24,

2021.

Thanks for your question.

Regards,

Craig Bassett

Research & Test Reactor Inspector

Office of Nuclear Reactor Regulation