MONTHYEARML20205Q6151999-04-15015 April 1999 Summary of 990413 Meeting with Boston Edison Co & Entergy Nuclear Generating Co Re Sale & Transfer of Pilgrim Nuclear Power Station from Boston Edison Co to Entergy Nuclear. List of Attendees & Draft Order & Cover Ltr Encl ML20141F4351997-06-30030 June 1997 Summary of Meeting W/Util Re Amend to Change UFSAR to Take Credit for Containment Overpressure in Net Positive Suction Head Analyses for ECCS Pumps ML20138J8821997-05-0202 May 1997 Summary of Operating Reactors Events Meeting 97-03 on 970430.List of Attendees,Significant Elements of Discussed Events & Reactor Scram Statistics for Listed Wks Encl ML20141A5041997-04-0404 April 1997 Summary of ACRS Subcommittee on Planning & Procedures Meeting on 970402 in Rockville,Md to Discuss Matters Re Conduct of ACRS Business ML20058M1861993-09-22022 September 1993 Summary of Operating Reactors Events Meeting 93-35 on 930915 ML20059N2091990-09-21021 September 1990 Summary of 900919 Operating Reactors Events Meeting 90-023 to Discuss Significant Elements ML20059G7011990-09-0606 September 1990 Summary of Operating Reactors Events Meeting 90-22 on 900905.List of Attendees & Scram Statistics Encl ML20058P4591990-08-16016 August 1990 Summary of 900807 Meeting W/Util & Eg&G Idaho in Braintree, Ma Re Inservice Testing Program Review.Meeting Agenda & List of Attendees Encl ML20247R0161989-09-21021 September 1989 Summary of Operating Reactors Events Meeting 89-34 on 890920 to Brief Senior Managers & Regional Offices on Selected Events That Occured Since Last Meeting ML20247E3641989-09-0606 September 1989 Summary of 890717 Meeting W/Numarc,B&W Owners Group & Representatives of Lead Plants Re Status of STS Amends & Outstanding Issues Associated W/Lead Plant STS Submittals ML20247D5291989-09-0505 September 1989 Summary of Operating Reactors Events Meeting 89-31 on 890830.Significant Event for Input Into NRC Performance Indicator Program Identified ML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20246K2171989-08-24024 August 1989 Summary of Operating Reactors Events Meeting 89-30 on 890823 Re Reactor Trip W/Multiple Instrumentation & Equipment Failures at DC Cook Unit 2 on 890814 & Auxiliary Feedwater Flows at Hb Robinson ML20245G5421989-08-0303 August 1989 Summary of Operating Reactors Events Meeting 89-28 on 890802.List of Attendees,Events Discussed & Significant Elements of Events & Summaries of Reactor Scrams for Wks Ending 890723 & 30 Encl ML20248B5171989-08-0303 August 1989 Summary of 890725 Interface Meeting W/Util in Birrmingham,Al Re Sonopco/Util Corporate Organization Including Generic Activities & Initiatives Re Plants.Agenda & Viewgraphs Encl ML20246P7771989-07-13013 July 1989 Summary of Operating Reactors Events Meeting 89-26 on 890712.Events Discussed & Significant Elements of Events Presented in Encl 2.List of Attendees Also Encl ML20246F8691989-06-22022 June 1989 Summary of Operating Reactors Events Meeting 89-24 on 890621.On 890615,potential Unmonitored Primary Coolant Release Path to Environ Discovered at WPPSS-2.On 890617,loss of Offsite Power Occurred at Brunswick,Unit 2 ML20245G6411989-06-15015 June 1989 Summary of Operating Reactors Events Meeting 89-23 on 890614.On 890607,multiple Electrical Distribution Sys Problems Occurred at Oconee,Units 1,2 & 3.On 890610,unit Power Signal Caused Scram ML20245F2221989-06-0808 June 1989 Summary of Operating Reactors Events Meeting 89-21 on 890531.List of Attendees & Related Info Encl ML20245A3851989-05-30030 May 1989 Summary of Operating Reactors Events Meeting 89-20 on 890524.List of Meeting Attendees & Viewgraphs Encl ML20247M7961989-05-24024 May 1989 Summary of 890502 Meeting W/Util,Sargent & Lundy & Rl Cloud Assoc in Rockville,Md Re Nonlinear Piping Analyses Used to Justify Removal of Snubbers & Pipe Supports.List of Attendees & Presentation by Licensee & Contractors Encl ML20247K0901989-05-23023 May 1989 Summary of 890517 Meeting W/Inpo Re Similarities & Differences Between Performance Indicator Programs.Detailed Discussion Encl ML20247J6991989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl ML20247J7051989-05-19019 May 1989 Summary of 890501 Meeting w/C-E Owners Group in Rockville,Md Re Diverse Emergency Feedwater Actuation Sys,Per 10CFR50.62 Requirements.List of Meeting Attendees & Viewgraphs Encl. Record Copy ML20247D3441989-05-16016 May 1989 Summary of Operating Reactors Events Meeting 89-19 on 890510.List of Attendees,Events Discussed & Significant Elements of Events & Rept of long-term Followup Assignments & Summary of Scrams for Wk Ending 890507 Encl ML20247K1011989-05-16016 May 1989 Summary of 890517 Meeting W/Inpo in Bethesda,Md Re Similarities & Differences Between INPO & NRC Performance Indicators ML20246L7281989-05-0505 May 1989 Summary of 890503 Meeting W/Util in Rockville,Md Re Containment Vessel Structural Integrity Tech Specs for Plants.List of Attendees & Licensee Presentation Encl ML20246C3261989-05-0404 May 1989 Summary of Operating Reactors Events Meeting 89-18 on 890503 ML20246B5161989-04-28028 April 1989 Summary of 890419 Operating Reactors Events Meeting 89-16. List of Attendees & Handouts Encl ML20248K3761989-04-10010 April 1989 Summary of Operating Reactors Events Meeting 89-014 on 890405.List of Attendees,Events Discussed & Significant Elements of Events & Summary of Reactor Scrams for Wk Ending 890402 Encl ML20247F1991989-03-24024 March 1989 Summary of Operating Reactors Events Meeting 89-12 on 890322.List of Attendees,Events Discussed & Significant Elements,Summary of Reactor Scrams & Comparison of Weekly Statistics W/Industry Averages for Wk Ending 890319 Encl ML20246N9201989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-010 on 890308.List of Attendees,Significant Events Identified for Input to NRC Performance Indicator Program & Summary of Reactor Scrams for Wk Ending 890305 Encl ML20247A8971989-03-16016 March 1989 Summary of Operating Reactors Events Meeting 89-11 on 890315.List of Attendees,Events Discussed & Significant Elements of Events & Four Events Identified for Input to NRC Performance Indicator Program & Summary of Scrams Encl ML20245H8011989-02-23023 February 1989 Summary of Operating Reactors Events Meeting 89-08 on 890222.Attendee List & Events Discussed & Significant Elements of Events Encl ML20235M1671989-02-17017 February 1989 Summary of Operating Reactors Events Meeting 89-07 on 890215.List of Attendees,List of Events Discussed,Summary of Events for Long Term Followup or Input to NRC Performance Indicator Program & Summary of Reactor Scrams Encl ML20196B9821988-12-0101 December 1988 Summary of Operating Reactors Events Meeting 88-47 on 881129.List of Attendees,Events Discussed & Significant Elements of Events,Two Events Suggested for long-term Followup & Summary of Reactor Scrams Encl ML20206L9831988-11-25025 November 1988 Summary of Operating Reactors Events Meeting 88-45 on 881115.List of Attendees & Handouts Encl ML20195H0271988-11-25025 November 1988 Summary of Operating Reactor Events Meeting 88-46 on 881122 ML20206E3591988-11-10010 November 1988 Summary of Operating Reactors Events Meeting 88-44 on 881108.List of Meeting Attendees,Significant Events & Summary of Reactor Scrams Encl.One Significant Event Identified for Input to Performance Indicator Program ML20235U3281988-11-0909 November 1988 Discusses Commonwealth of Ma 881006 Public Meeting on Offsite Emergency Preparedness for Plant ML20205J3451988-10-24024 October 1988 Summary of 881005 Meeting W/Util in Rockville,Md Re Status of Readiness for Facility Restart.List of Attendees & Viewgraphs Encl ML20205H7521988-10-18018 October 1988 Summary of Operating Reactors Events Meeting 88-41 on 881018.No Significant Events Identified for Input to NRC Performance Indicator Program ML20207M0771988-10-0505 October 1988 Summary of Operating Reactors Events Meeting 88-39 on 881004.List of Attendees & Viewgraphs Encl ML20207K9461988-10-0404 October 1988 Summary of 880830 Meeting W/Util in Rockville,Md Re Fire protection-related Issues.Draft Fire Protection Engineering Evaluation, Cables on Svc Bldg Outside Wall & List of Attendees Encl ML20235R5241988-09-28028 September 1988 Summary of Pilgrim Restart Assessment Panel 880915 Meeting by Telcon Re Status of NRC & Licensee Activities Associated W/Proposed Plant Restart.Panel Meeting in Plymouth,Ma on 880929 Planned.Partially Deleted Subj Panel Issues Encl ML20245D8411988-09-28028 September 1988 Summary of Operating Reactors Events Meeting 88-38 on 880927 Re Events Which Occurred Since Last Meeting on 880920 IA-88-519, Summary of Pilgrim Restart Assessment Panel 880915 Meeting by Telcon Re Status of NRC & Licensee Activities Associated W/Proposed Plant Restart.Panel Meeting in Plymouth,Ma on 880929 Planned.Partially Deleted Subj Panel Issues Encl1988-09-28028 September 1988 Summary of Pilgrim Restart Assessment Panel 880915 Meeting by Telcon Re Status of NRC & Licensee Activities Associated W/Proposed Plant Restart.Panel Meeting in Plymouth,Ma on 880929 Planned.Partially Deleted Subj Panel Issues Encl ML20155B8231988-09-20020 September 1988 Summary of Operating Reactors Events Meeting 88-37 on 880920.Info Encl Includes rept-to-date of long-term Followup Assignments & Summary of Reactor Scrams ML20154F7971988-09-15015 September 1988 Summary of 880901 QA Meeting W/Util in Rockville,Md to Discuss Rev 2 of Util Operational QA Plan for Plants.Agenda & List of Participants Encl ML20235R5101988-09-13013 September 1988 Summary of Pilgrim Restart Assessment Panel 880901 Meeting by Telcon Re Status of NRC & Licensee Activities Associated W/Proposed Plant Restart.Panel Meeting by Telcon Planned for 880915 1999-04-15
[Table view] Category:TRIP REPORTS
MONTHYEARML20247K2471989-08-24024 August 1989 Trip Rept of Staff 890718-19,21 & 0801-02 Visits to Nuclear Power Plants to Gather Info Re Industry Actions to Address Loss of Oil Malfunctions of Rosemount Models 1153 & 1154 Transmitters ML20154L1661988-05-10010 May 1988 Trip Rept of 880412-15 Mgt Team Visit to Plant Sites,Two Matls Licensees & Region I Ofcs.List of Team Members & Summary of Observations & Perceptions from Visit Encl.Info Deleted ML20196F9951988-02-24024 February 1988 Partially Withheld Trip Rept of 880209-11 Mgt Team Visit to Region V & San Onofre & Trojan Sites Re Integrated Assessment of Mgt Effectiveness Associated W/Regionalized NRR & NMSS Programs IA-87-643, Trip Rept of 870722-23 Visit to Braintree,Ma to Discuss Proposed Safety Enhancement Program at Plant1987-08-17017 August 1987 Trip Rept of 870722-23 Visit to Braintree,Ma to Discuss Proposed Safety Enhancement Program at Plant ML20237L1751987-08-17017 August 1987 Trip Rept of 870722-23 Visit to Braintree,Ma to Discuss Proposed Safety Enhancement Program at Plant ML20151W0041987-03-12012 March 1987 Submits After Trip Rept ML20213F8661986-07-31031 July 1986 Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl IA-86-778, Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl1986-07-31031 July 1986 Trip Rept of 860514-15 Site Visit Re Seismic Design Issues Concerning Cable Trays,Conduit Qualification,Hvac Concerns, CRD Return Lines,Ie Bulletins 79-14 & 79-02 & Nonessential Piping.Request for Addl Info Re Vermont Yankee Encl ML20206J6561986-06-23023 June 1986 Trip Rept of 860612 Training Session in Lacey,Wa Re Federal Radiological Emergency Response Plans & Meeting W/Utils & State of Wa Concerning Potential Emergency Preparedness Issues.Attendees Listed & Training Agenda Encl ML20244D8391986-05-0707 May 1986 Trip Rept of 860415 Site Visit Re Demonstration for Ultrasonic Exam Procedure of Statically Cast Stainless Steel Primary Loop Welds.Issue of Preservice Ultrasonic Exam of Welds Resolved.Trip Repts by Inel & Bnwl Encl ML20244D8401986-04-22022 April 1986 Trip Rept of 860415 Site Visit Re Demonstration of Ultrasonic Exams Performed on Cast Stainless Steel Primary Piping Welds.Exam Procedure Appears to Meet or Exceed ASME Code Requirements.Written Procedure Not Available ML20154S2531986-03-26026 March 1986 Trip Rept of 860303-07 Site Visit to Introduce Zwolinski to Key Personnel Throughout Util Nuclear Organization & to Observe Results of 3-wk around-the-clock Team Insp.Draft Summary of Insp Team Findings Encl ML20154L9181986-03-0606 March 1986 Trip Rept of 851021-24 Site Visits Re Wrong Unit/Wrong Train Events to Determine Whether Simple,Low Cost Improvements Can Be Identified & Implemented ML20237C9681986-02-19019 February 1986 Trip Rept of Attendance at State of Il 860213 Meeting Re Training Session on NRC Incident Response Program & NRC Participation in 860408 Plant Emergency Exercise.List of Attendees & Partial Agenda Encl ML20141H8551986-01-10010 January 1986 Trip Rept of 851112-15 Site Visits Re Wrong Unit/Wrong Train Events.Visit Conducted as Part of short-term Effort to Determine If Low Cost Improvements Can Be Identified & Implemented to Reduce Frequency of Events ML20138A1201985-09-23023 September 1985 Trip Rept of 850617-20 Site Visits Re Reduction of Wrong Unit/Wrong Train Events at Facilities ML20199G3181985-01-15015 January 1985 Trip Rept of 841114-16 Site Visit Re Meetings W/Qa/Qc Inspectors to Emphasize That All Safety Issues Must Be Resolved Before Units Can Be Licensed ML20127B5101984-04-13013 April 1984 Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed IA-85-160, Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed1984-04-13013 April 1984 Trip Rept of Site Visit During Wk of 831031 Re Physical Arrangement & Installation of Electrical,Instrumentation & Control Equipment.Compliance W/Nrc Design Criteria Confirmed ML20138M9741983-12-20020 December 1983 Trip Rept of 831129-30 Site Visit Statistical Analysis of Backfit Insp Program ML20205T5371983-02-15015 February 1983 Trip Rept of 830126 Meeting in Bethesda to Discuss Question of Corrective Actions to Be Required of Util Re Finding of Uncertified QC Inspectors at Site ML20134B4611982-09-16016 September 1982 Trip Rept of 820830-31 Visit to Bechtel,Norwalk,Ca to Observe Region IV Insp Concerning Effectiveness of Util/ Bechtel Processing of Field Change Notices for Facility Const.Supporting Documentation Encl ML18139B9671982-07-13013 July 1982 Trip Rept of 820512-14 Visit to Facilities Re Radiological Effluent Tech Specs ML20213D9361981-12-0707 December 1981 Trip Rept of 811005 Visit to Denver,Co & Richland,Wa to Discuss Site Drainage Plans,Meeting W/Westec Consultants on Possible Orographic Effects & Duration of Rainfall & Meeting W/Pnl to Discuss Safety & Environ Review Procedures ML20140G2531976-06-28028 June 1976 Trip Rept of 760614-17 Site Visits Re Relief Valve Test Sequence.Test Results Encl ML20140G2591976-06-15015 June 1976 Trip Rept of 760529 Site Visit Re Witness of Safety/Relief Valve Tests.List of Attendees Encl ML20235C1831975-11-24024 November 1975 Trip Rept of 751111 Visit to Plant Site as Part of Q-1 Review Procedures Re Status of Plant Const.List of Participants Encl ML20235C1511975-10-21021 October 1975 Trip Rept of Site Visit During Wk of 751006 Re NRC Concerns & General Overview by Util of Const Activities.Summary of Site Visit Schedule & Participating Personnel Encl ML20126D8131973-05-0101 May 1973 Trip Rept of 730424-25 Site Visit to Obtain First Hand Knowledge of Site & Environs & to Discuss Possible Problem Areas.Attendance List Encl ML20210B3761972-12-29029 December 1972 Trip Rept of 721218 Site Visit Re Jet Pump Assembly & Torus Ring Header Sys.Dynamic Analysis & Measured Data Not Available.Results & Findings Will Be Described in Rept Scheduled for 730302 ML20210B2621972-10-25025 October 1972 Trip Rept of 721019 Visit to Plant to Investigate Ring Header Problem & Observe GE Blowdown Tests ML20084K2751971-01-27027 January 1971 Trip Rept of 710120 Visit to Plant Re Plans for Replacement of Dome Concrete & Review of Specs for Work.Concrete Removal Operation Satisfactory ML20234E3591964-04-29029 April 1964 Trip Rept of 640318 Visit to Bodega Reactor Site Re Geology of Area. Statement on Bodega Head Power Site Shaft Fault, Encl 1989-08-24
[Table view] |
Text
__ _ __.
7 March 12, 1987 MEMORANDUM FOR: The Files FROM: Thomas P. Gwynn yd Technical Assistant d
SUBJECT:
PILGRIM AFTER TRIP REPORT
- 1. There were neither press nor the public present during the trip.
- 2. NRC personnel present included:
- a. Lando Zech, Chairman
- b. Max Clausen, Technical Assistant to the Chairman
- c. Pat Gwynn, Technical Assistant to the Chairman ;
- d. Tom Murley, Regional Administrator, Region I
- e. Jim Wiggins, Section Chief, Region II ,
- f. Two of the three resident inspectors currently assigned to Pilgrim (McBridgeandLyash) ,
- 3. The above NRC personnel met during a working lunch in Plymouth, MA to apprise the Chairman of the status of the plant, current issues at the plant, and current items of interest.
- 4. The site visit began with a very brief presentation by Boston Edison Company (BEco) personnel. The handouts from the briefing and an agenda for the site visit are attacheo in a BECo briefing book.
- 5. Key BECo personnel attending the briefing and accompanying the Chairman on his tour included the following:
- a. Ralph G. Bird, Senior Vice President, Nuclear
- b. A. l.ee Oxsen, Vice President, Nuclear Operations
- c. Kenneth P. Roberts, Nuclear Operations Manager f
I 8808230135 880728 1 '
PDR FOIA JOHNSON 88-198 POR l M1 l
L I
- d. James M. Lydon, Executive Vice President and Chief Operating Officer
- o. Edward Howard, Vice President Nuclear Engineering
- f. Neil Brosee, Maintenance Section Manager
- 6. The plant tour generally followed the attached agenda, however, the tour was shortened to end at 4:00 p.m.
. 7. Mr. Stephen J. Sweeney, Chairman, President, and CEO of BEco joined the Chairman for his exit briefing at the BEco/ Pilgrim Emergency Operations facility. The following sumarizes the scope and substance of the Chair 1 nan's exit coments:
- a. Thanked the utility for.their hospitality and the opportunity to visit the plant.
- t. Discussed BECo's performance at Pilgrim over the last several years and BECo's apparent recognition of their problems.
, c. Observed BEco's comitment of dollars to improvement of the plant and their apparent willingness to take the lead in making
^
modificatiens to % prove their Mark I containment. This was a positive indicator of BEco's comitment to improve.
- d. Discussed the clean, quiet, taut philosophy. BECo made a good t
impression concerning their obvious efforts to improve cleanliness, housekeeping and the radiological working conditions i at Pilgrim. They were encouraged to continue those efforts.
Pilgrim was not quiet, especially in the control room. The Chairman recognizFd the current plant conditions but also observed the distraction posed to the operators by over use of the paging system. The Chairman also discussed his view of a TAUT plant and indicated that BECo had additional work to do in this area,
- e. The operators appeared good and were anxious to operate the plant again. BECo was encouraged to increase the number of available 4
operators and to decrease operator overt me.
- f. Emphasized the need for good configuratien control / design change control and root cause corrective action,
- g. Corporate engineering and technical support was seen as a plus.
Suggested BEco consider utilizing the expertise in other areas,
- h. The hRC is looking for results; not just for improved programs.
NFC rest see that Pilgrin esn and is doing better.
- - p - r-
L 3
O,
- i. Sense that a good relationship exists between NRC and BECo' in particular, good, honest communications.
J. The exciting challenge confronting BECo management today is their people and their attitudes. Strongly suggested that senior management visit the plant and talk with the people routinely,
- k. Encouraged the utility to challenge their operators with a company sponsored degree program.
- 1. The onsite plant specific simulator soon to be delivered was seen as a very positive benefit to the company and a symbol fo their comitment to excellence in plant operations and training.
- m. Recognized the reporting of operations and chemistry to the same section manager as a good approach.
- 7. Mr. Sweeney stated that he appreciated the Chairman's visit and his candor during the exit. The following sumarizes Mr. Sweeney's remarks:
- a. NRC and BECo have the same goals (implies safe plant operations),
- b. The exit comments didn't tell BECo anything they didn't already kr.ow. BECo learned of the problems at Pilgrim early on but was slow to scope the problems. They intentionally took their time in obtaining Mr. Bird's help to assure that they were getting the right man for the job rather than a person to fill an opening,
- c. Mr. Sweeney stated that the company currently has a degree assistance program for its employecs and didn't know why it wasn't being made available to the operators. Mr. Bird will look into this,
- d. BEco will not come to the Comission to seek restart of Pilgrim until BECo is absolutely convinced that they are fully ready.
BECc will not rush the process and wants to make sure they do things right.
Attachment:
BEco Briefing Book
,