Letter Sequence Request |
---|
|
|
MONTHYEARML20137J9701997-04-0101 April 1997 Discusses GE Request That Info Provided in Re Calulations of Min Critical Power Ratio Safety Limit for Plant,Be Withheld from Public Disclosure,Per 10CFR2.790.Subj Info Will Be Withheld from Public Disclosure Project stage: Other ML20154Q7681998-09-22022 September 1998 Notice of 981026 Informal Public Hearing Re Petition Submitted Per 10CFR2.206 Involving Plant,Unit 1 of Tva,At Browns Ferry Nuclear Plant Training Ctr Auditorium, Athens,Al Project stage: Request ML20154M7571998-10-13013 October 1998 Withdraws TS Change 377 Re SLMCPR for Unit 1,per NRC Request Project stage: Other 1998-10-13
[Table View] |
|
---|
Category:FEDERAL REGISTER NOTICES
MONTHYEARML20205D6471999-03-29029 March 1999 Notice of Issuance of Director'S Decision Under 10CFR2.206 Denying in Part & Granting in Part Petition Filed by D Lochbaum on 980405 ML20155H4561998-11-0404 November 1998 Notice of Withdrawal of TVA 950602 Application for Amend to DPR-33.Proposed Amend Would Have Revised Custom TS for Unit 1 to Include Changes Associated with Implementation of Pr Neutron Monitor Upgrade ML20155H4361998-11-0404 November 1998 Notice of Withdrawal of TVA 960621 Application for Amend to FOL DPR-33.Proposed Amend Would Have Provided New Safety Limit Min Critical Power Ratio to Replace Existing non-conservative Value ML20154J6541998-10-0808 October 1998 Notice of Withdrawal of Application for Amend to FOLs DPR-33,DPR-52 & DPR-68,respectively.Amends Request Revising BFN Custom TSs to Remove Identified non-conservatism Re Number of RHRSW Pumps Required to Be Operable ML20154J8271998-10-0707 October 1998 Notice of Withdrawal of Application for Amend to Facility Operating Licenses DPR-33,DPR-52 & DPR-68.Proposed Amend to Allow Traveling in-core Probe Sys to Be Considered Operable with Less than Five TIP Machines Operable ML20154Q7681998-09-22022 September 1998 Notice of 981026 Informal Public Hearing Re Petition Submitted Per 10CFR2.206 Involving Plant,Unit 1 of Tva,At Browns Ferry Nuclear Plant Training Ctr Auditorium, Athens,Al ML20217Q7271998-04-29029 April 1998 Notice of Receipt of Petition for Director'S Decision Under 2.206.Petitioners Request That Us NRC Take Action W/Regard to Browns Ferry Unit 1 Denied ML20217K7731998-04-22022 April 1998 Notice of Denial of Amend to License DPR-33 & Opportunity for Hearing Re Revising TSs to Permit Increasing Main Steam safety-relief Valve Set Point Tolerance to Plus or Minus 3% ML20129F2551996-09-26026 September 1996 Notice of Denial of Amend to Facility OL & Opportunity for Hearing Re Request to Revise TS to Permit Continued Operation of BFN Unit 3 for Up to 7 Days W/One Reactor Coolant Recirculation Loop Out of Svc ML20246C0871989-04-24024 April 1989 Notice of Withdrawal of 861216 Application for Amend to Licenses DPR-39 & DPR-48,revising Radiological Effluent Tech Specs ML20203P6891983-05-0303 May 1983 Notice of Issuance of Amend 91 to License DPR-49, Incorporating License Condition to Require Licensee to Follow Plan for Integrated Scheduling of Plant Mods ML20062A4311978-09-29029 September 1978 Notice of Issuance of Amend to Facil Oper Lic DPR-33 to Permit Oper at Maximum of 50% Lic Pwr Level w/1 Recirculation Loop Isolated ML20062A4571978-09-29029 September 1978 Notice of Issuance of Amend 43 to Facil Oper Lic DPR-33 on 780929 Re 82% Lic Pwr Level W/ One Recirculation Loop Isolated ML20062B0181978-08-0202 August 1978 Notice of Issuance of Amends 40,38 & 14 to Licenses DPR-33, DPR-52 & DPR-68,respectively,revising Tech Specs to Lower Low Water Level Setpoints 1999-03-29
[Table view] Category:TEXT-CODE OF FEDERAL REGULATIONS
MONTHYEARML20205D6471999-03-29029 March 1999 Notice of Issuance of Director'S Decision Under 10CFR2.206 Denying in Part & Granting in Part Petition Filed by D Lochbaum on 980405 ML20155H4561998-11-0404 November 1998 Notice of Withdrawal of TVA 950602 Application for Amend to DPR-33.Proposed Amend Would Have Revised Custom TS for Unit 1 to Include Changes Associated with Implementation of Pr Neutron Monitor Upgrade ML20155H4361998-11-0404 November 1998 Notice of Withdrawal of TVA 960621 Application for Amend to FOL DPR-33.Proposed Amend Would Have Provided New Safety Limit Min Critical Power Ratio to Replace Existing non-conservative Value ML20154J6541998-10-0808 October 1998 Notice of Withdrawal of Application for Amend to FOLs DPR-33,DPR-52 & DPR-68,respectively.Amends Request Revising BFN Custom TSs to Remove Identified non-conservatism Re Number of RHRSW Pumps Required to Be Operable ML20154J8271998-10-0707 October 1998 Notice of Withdrawal of Application for Amend to Facility Operating Licenses DPR-33,DPR-52 & DPR-68.Proposed Amend to Allow Traveling in-core Probe Sys to Be Considered Operable with Less than Five TIP Machines Operable ML20154Q7681998-09-22022 September 1998 Notice of 981026 Informal Public Hearing Re Petition Submitted Per 10CFR2.206 Involving Plant,Unit 1 of Tva,At Browns Ferry Nuclear Plant Training Ctr Auditorium, Athens,Al ML20217Q7271998-04-29029 April 1998 Notice of Receipt of Petition for Director'S Decision Under 2.206.Petitioners Request That Us NRC Take Action W/Regard to Browns Ferry Unit 1 Denied ML20217K7731998-04-22022 April 1998 Notice of Denial of Amend to License DPR-33 & Opportunity for Hearing Re Revising TSs to Permit Increasing Main Steam safety-relief Valve Set Point Tolerance to Plus or Minus 3% ML20129F2551996-09-26026 September 1996 Notice of Denial of Amend to Facility OL & Opportunity for Hearing Re Request to Revise TS to Permit Continued Operation of BFN Unit 3 for Up to 7 Days W/One Reactor Coolant Recirculation Loop Out of Svc ML20246C0871989-04-24024 April 1989 Notice of Withdrawal of 861216 Application for Amend to Licenses DPR-39 & DPR-48,revising Radiological Effluent Tech Specs ML20203P6891983-05-0303 May 1983 Notice of Issuance of Amend 91 to License DPR-49, Incorporating License Condition to Require Licensee to Follow Plan for Integrated Scheduling of Plant Mods ML20062A4311978-09-29029 September 1978 Notice of Issuance of Amend to Facil Oper Lic DPR-33 to Permit Oper at Maximum of 50% Lic Pwr Level w/1 Recirculation Loop Isolated ML20062A4571978-09-29029 September 1978 Notice of Issuance of Amend 43 to Facil Oper Lic DPR-33 on 780929 Re 82% Lic Pwr Level W/ One Recirculation Loop Isolated ML20062B0181978-08-0202 August 1978 Notice of Issuance of Amends 40,38 & 14 to Licenses DPR-33, DPR-52 & DPR-68,respectively,revising Tech Specs to Lower Low Water Level Setpoints 1999-03-29
[Table view] |
Text
,.' .
h/)fl 9l$%
csqunr
' ' ~
7590-01P
" l C? 'll f,1 1: 56 FUBLIC 00:U.EM EC,:1 U.S. NUCLEAR REGULATORY COMMISSION .
1 DOCKET NO. 50-259 l
LICENSE NO. DPR-33 '
TENNESSEE VALLEY AUTHORITY NOTICE OF INFORMAL 10 CFR 2.206 PUBLIC HEARING The U.S. Nuclear Regulatory Commission (NRC) will hold an informal public hearing i regarding a petition submitted pursuant to 10 CFR 2.206 involving Browns Ferry Nuclear Plant, Unit 1, of the Tennessee Valley Authority (TVA or the licensee). The hearing will be held on October 26,1998. The location of the hearing will be at the Browns Ferry Nuclear Plant Training Center, Auditorium. The Browns Ferry Nuclear Plant Training Center is located at Shaw Road and Nuclear Plant Road, Athens, Alabama. The hearing will be open to public attendance and will be transcribed.
The structure of the hearing shall be as follows:
Monday October 26,1998:
1:00 p.m. - NRC opening remarks 1:15 p.m. - Petitioners presentation 2:00 p.m. - NRC questions i
2:15 p.m. - Licensee's presentation
() !
3:00 p.m. - NRC questions 3:15 p.m. - Public Comments 3:45 p.m. - Licensee / Petitioners final statements 7gl 4:00 p.m. - Meeting concludes Y 9810260063 980922 PDR ADOCK 05000259 P PDR
, m P 1.3 s, ,-
y - .- -- . - . - . . . -- ~ . - . - - - . .
Ia :
1 1
By letter dated April 5,,1997, the Union of Concemed Scientists (UCS or Petitioner) submitted a Petition pursuant to 10 CFR 2.206 requesting (1) that the operating license for Browns Feny Nuclear Plant, Unit i be revoked and (2) that the NRC require TVA to submit either a decommissioning plan or a lay-up plan for Browns Ferry Nuclear Plant, Unit 1, in addition, the Petitioner requested a hearing on this petition to present new information on Browns Ferry Nuclear Plant, Unit 1 that would include si discussion of the licensing basis reconstitution that would be requi ed to support restart, and certain financial aspects that might be a consideration for the TVA's decision for retaining the Browns Feny Unit 1 operating license.
The purpose of this informal public hearing is to obtain additional information from the Petitioner, the licensee, and the public for NRC staff use in evaluating the Petition. Therefore, this informal public hearing will be limited to information relevant to issues raised in the Petition.
The staff will not offer any preliminary views on its evaluation of the Petition. The informal public hearing will be chaired by a senior NRC official who will limit presentations to the above subject.
The format of the informal public hearing will be as follows:
opening remarks by the NRC regarding the general 10 CFR 2.206 process, the purpose of the informal public hearing, and a brief summary of the Petition and its Addendum (15 minutes); time for the Petitioner to articulate the basis of the Petition (45 minutes); time for the NRC to ask the Petitioner questions for purposes of clarification (15 minutes); time for the licensee to address the issues raised in the Petition (45 minutes); time for the NRC to ask the licensee questions for purposes of clarification (15 minutes); time for public comments relative to the Petition (30 minutes); and time for licensee and Petitioner's final statements (15 minutes).
Members of the public who are interested in presenting information relative to the Petition should notify the NRC official named below,5 working days prior to the hearing. A brief summary l of the information to be presented and the time requested should be provided in order to make appropriate arrangements. Time allotted for presentations by members of the public will be
7- :*
determined based upon the number of requests raceived and will be announced at the beginning of the hearing. The order for public presentations will be on a first received first to = peak basis.
Written statements will also be accepted and included in the record of the hearing.
Written statements should be mailed to the U.S. Nuclear Regulatory Commission, Mail stop O-14B21, Attn: Albert W. De Agazio, Washington, DC 20555.
Requests for the opportunity to present information can be made by contacting Albert W.-
De Agazio, Project Manager,' Division of Reactor Projects-l/II (telephone 301-1161443) between 8:00 a.m. to 5:45 p.m. (EDT), Monday-Friday. Persons planning to attend this informal public ,
hearing are urged to contact the above 1 or 2 days prior to the informal public hearing to be advised of any changes that may have occurred.
FOR THE NUCLEAR REGU TORY COMMISSION
., - I '
John A. Zwolinski, Acting Director l Division of Reactor Projects-l/II l Office of Nuclear Reactor Regulation Dated at Rockville, Maryland, This22rd day of September 1998.