ML21232A339

From kanterella
Revision as of 09:54, 13 September 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
August 19,2021, Public Meeting with Southern Nuclear Operating Company Regarding Proposed LAR to Remove Function 1.f (Main Steam Line Isolation-Turbine Building Area Temperature-High) from TS Table 3.3.6.1A-7 for Hatch Units 1&2 (L-2021-LRM
Date released: 09/10/2021 Download: ML21232A339



Summary of Public Meeting with Southern Nuclear Operating Company Regarding Proposed LAR to Remove Function 1.f (Main Steam Line Isolation-Turbine Building Area Temperature-High) from TS Table 3.3.6.1A-7 for Hatch Units 1&2 (L-2021-LRM-0081
ML21232A262
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 09/01/2021
From: John Lamb
Plant Licensing Branch II
To:
Southern Nuclear Operating Co
Lamb J G
References
EPID L-2021-LRM-0081
Download: ML21232A262 (7)
Pre-Submittal Meeting - Request to Eliminate the Requirement for Automatic Main Steam Isolation on High Turbine Building Area Temperature
ML21225A031
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 08/31/2021
From:
Southern Nuclear Operating Co
To:
Office of Nuclear Reactor Regulation
Lamb J G
References
Download: ML21225A031 (20)
Pre-Submittal Meeting with Southern Nuclear Operating Company, Inc. Planned License Amendment Request for Edwin I. Hatch Nuclear Plant, Units 1 and 2
ML21211A079
Person / Time
Site: Hatch Southern Nuclear icon.png
Issue date: 07/30/2021
From:
Office of Nuclear Reactor Regulation
To:
References
PMNS20211015
Download: ML21211A079 (3)