ML20335A305

From kanterella
Revision as of 16:39, 2 June 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Response to SRM-20-0086 - Federal Register Notice - PRM-26-3 and PRM-26-5 Denial of Petitions Fitness-for-Duty Program
ML20335A305
Person / Time
Issue date: 12/08/2020
From: Annette Vietti-Cook
NRC/SECY
To:
Yanely Malave
Shared Package
ML20335A264 List:
References
10 CFR Part 26, NRC-2009-0482, NRC-2010-0304, PRM-26-3, PRM-26-5, SRM-20-0086
Download: ML20335A305 (6)


Text

[7590-01-P]

NUCLEAR REGULATORY COMMISSION 10 CFR Part 26

[Docket Nos. PRM-26-3; NRC-2009-0482, PRM-26-5; NRC-2010-0304]

Fitness-for-Duty Program AGENCY: Nuclear Regulatory Commission.

ACTION: Petitions for rulemaking; denial.

SUMMARY

The U.S. Nuclear Regulatory Commission (NRC) is denying two petitions for rulemaking related to the fitness-for-duty program that were docketed as PRM-26-3, Professional Reactor Operator Society - Fitness-for-Duty Programs, and PRM-26-5, Nuclear Energy Institute - Fitness-for-Duty Programs, due to the discontinuation of the associated rulemaking.

DATES: As of December 17, 2020, the dockets for PRM-26-3 and PRM-26-5 are closed.

ADDRESSES: Please refer to Docket IDs NRC-2009-0482 or NRC-2010-0304 when contacting the NRC about the availability of information regarding this document. You may obtain publicly-available information related to this document using any of the following methods:

Dawn.Forder@nrc.gov. For technical questions, contact the individuals listed in the FOR FURTHER INFORMATION CONTACT section of this document.

  • NRCs Agencywide Documents Access and Management System (ADAMS): You may obtain publicly-available documents online in the ADAMS Public Documents collection at https://www.nrc.gov/reading-rm/adams.html. To begin the search, select Begin Web-based ADAMS Search. For problems with ADAMS, please contact the NRCs Public Document Room (PDR) reference staff at 1-800-397-4209, 301-415-4737, or by e-mail to pdr.resource@nrc.gov. The ADAMS accession number for each document referenced (if it is available in ADAMS) is provided the first time that it is mentioned in the SUPPLEMENTARY INFORMATION section.
  • Attention: The PDR, where you may examine and order copies of public documents, is currently closed. You may submit your request to the PDR via email at PDR.Resource@nrc.gov or call 1-800-397-4209 between 8:00 a.m. and 4:00 p.m.

(EST), Monday through Friday, except Federal holidays.

FOR FURTHER INFORMATION CONTACT: Yanely Malave, Office of Nuclear Material Safety and Safeguards, U.S. Nuclear Regulatory Commission, Washington, DC 20555-0001; telephone: 301-415-1519, e-mail: Yanely.Malave-Velez@nrc.gov.

SUPPLEMENTARY INFORMATION:

2

I. Background Title 10 of the Code of Federal Regulations (10 CFR) 2.802, Petition for rulemakingrequirements for filing, provides an opportunity for any interested person to petition the Commission to issue, amend, or rescind any regulation in 10 CFR chapter I.

The NRC received the following petitions for rulemaking (PRMs) regarding 10 CFR part 26, Fitness for Duty Programs, subpart I, Managing Fatigue, from the Professional Reactor Operator Society (PROS) and the Nuclear Energy Institute (NEI) after the NRC issued a final rule1 in 2008 that substantially revised its fitness for duty requirements:

(1) PRM-26-3 Submitted by Robert N. Meyer on Behalf of PROS On October 16, 2009, Mr. Robert N. Meyer, on behalf of PROS, an organization of operations personnel employed at nuclear power plants throughout the United States, submitted a PRM requesting that the NRC amend its fatigue management regulations to change the term unit outage to site outage used in § 26.205(d)(4) and (d)(5) and that the definition of site outage should be provided to read as up to 1 week prior to disconnecting the reactor unit from the grid and up to 75-percent turbine power following reconnection to the grid (ADAMS Accession No. ML092960440). The NRC docketed the petition as PRM-26-3, and on November 27, 2009, published a document in the Federal Register requesting public comment (74 FR 62257). The comment period closed on February 10, 2010, and the NRC received 4 comment letters. After evaluating the merits of the petition and the public comments, the NRC determined that the issues raised in PRM-26-3 would be considered in a planned rulemaking activity titled, Quality 1

Fitness for Duty Programs; Final Rule, 73 FR 16966 (March 31, 2008).

3

Control/Quality Verification (QC/QV) (Docket ID: NRC-2009-0090) and published a Federal Register notice (76 FR 28192) on May 16, 2011 to this effect.

(2) PRM-26-5 Submitted by Anthony R. Pietrangelo on Behalf of NEI On September 3, 2010, Anthony R. Pietrangelo on behalf of NEI, a nuclear power industry trade association, submitted a PRM requesting that the NRC amend its regulations regarding fatigue management based on experience gained since the regulations were amended in 2008. The NRC docketed the petition as PRM-26-5, and on October 22, 2010, published a document in the Federal Register requesting public comment (75 FR 65249). The comment period closed on January 5, 2011, and the NRC received 39 comment letters. After evaluating the merits of the petition and the public comments, the NRC determined that the issues raised in PRM-26-5 would be considered in the planned QC/QV rulemaking and published a Federal Register notice (76 FR 28192) on May 16, 2011 to this effect.

II. Discussion A. Discontinuation of the Quality Control/Quality Verification (QC/QV) Rulemaking In SECY-15-0074, Discontinuation of Rulemaking ActivityTitle 10 of the Code of Federal Regulations Part 26, Subpart I, Quality Control and Quality Verification Personnel in Fitness for Duty Program (RIN 3150-AF12), (ADAMS Accession No. ML15084A092) dated May 19, 2015, the NRC staff requested Commission approval to discontinue the QC/QV rulemaking. This request was based on the following factors: 1)

QC/QV inspections are most often performed by maintenance personnel who are already covered by the work hour controls in 10 CFR part 26, subpart I; 2) the few 4

remaining inspections are performed by a small number of QC/QV-dedicated personnel; and 3) backfitting the 10 CFR part 26, subpart I, work hour controls to the QC/QV-dedicated personnel would not result in a substantial increase in the overall protection of the public health and safety or common defense and security. The Commission approved the discontinuation of this rulemaking effort in SRM-SECY-15-0074, Staff Requirements - SECY-15-0074 - Discontinuation of Rulemaking Activity - Title 10 of the Code of Federal Regulations Part 26, Subpart I, Quality Control and Quality Verification Personnel in Fitness for Duty Program (RIN 3150-AF12), dated July 14, 2015 (ADAMS Accession No. ML15195A577).

B. Denial of PRM-26-3 and PRM-26-5 Under § 2.803(i)(2), if after closing the docket for a PRM under § 2.803(h)(2)(ii) by addressing it in an ongoing rulemaking the NRC decides not to complete the rulemaking, the PRM is documented as a denial of the PRM. In SRM-SECY-15-0074, the Commission approved the discontinuation of the QC/QV rulemaking, which was identified to address PRM-26-3 and PRM-26-5. Therefore, the NRC is denying these petitions without prejudice.

III. Conclusion The NRC previously discontinued the QC/QV rulemaking and is therefore denying without prejudice PRM-26-3 and PRM-26-5 for the reasons discussed in this document.

5

Dated: December 8, 2020.

For the Nuclear Regulatory Commission.

/RA/

Annette L. Vietti-Cook, Secretary of the Commission.

6