ML21039A277

From kanterella
Revision as of 19:21, 8 April 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Updated Final Safety Analysis Report, Chapter 17, Quality Assurance
ML21039A277
Person / Time
Site: Grand Gulf Entergy icon.png
Issue date: 01/27/2021
From:
Entergy Operations
To:
Office of Nuclear Reactor Regulation
Shared Package
ML21039A278 List:
References
GNRO2021/00002
Download: ML21039A277 (2)


Text

GRAND GULF NUCLEAR GENERATING STATION Updated Final Safety Analysis Report (UFSAR)

TABLE OF CONTENTS CHAPTER 17 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION . . . . . 17.1-1 17.2 QUALITY ASSURANCE DURING THE OPERATING PHASE . . . . . . . 17.1-1 17-i Revision 2016-00

GRAND GULF NUCLEAR GENERATING STATION Updated Final Safety Analysis Report (UFSAR) 17.0 QUALITY ASSURANCE 17.1 QUALITY ASSURANCE DURING DESIGN AND CONSTRUCTION This section, as it relates to GGNS, is covered in the PSAR.

17.2 QUALITY ASSURANCE DURING THE OPERATING PHASE This section was covered in a separate topical report (GGNS-TOP-1A), but has been replaced by a Corporate QA manual.

17.1-1 Revision 2016-00