ML20309A601

From kanterella
Revision as of 15:42, 26 March 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
6 to Updated Final Safety Analysis Report, Chapter 17, Quality Assurance Program
ML20309A601
Person / Time
Site: North Anna  Dominion icon.png
Issue date: 09/30/2020
From:
Virginia Electric & Power Co (VEPCO)
To:
Office of Nuclear Reactor Regulation
References
20-324
Download: ML20309A601 (4)


Text

North Anna Power Station Updated Final Safety Analysis Report Chapter 17

Intentionally Blank Revision 56--Updated Online 09/30/20 NAPS UFSAR 17-1 CHAPTER 17 QUALITY ASSURANCE PROGRAM The Quality Assurance Program is described in Topical Report DOM-QA-1, Dominion Nuclear Facility Quality Assurance Program Description (QAPD). This topical report provides the QAPD for Dominions nuclear power stations and independent spent fuel storage installations.

The Dominion QAPD conforms to applicable regulatory requirements, such as 10 CFR 50, Appendix B, and approved industry standards, including equivalent alternatives, where identified.

This program applies to activities during design, construction, operation, and decommissioning as well as siting.

Revision 56--Updated Online 09/30/20 NAPS UFSAR 17-2 Intentionally Blank