ML20217G810

From kanterella
Revision as of 00:50, 2 March 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Monthly Operating Repts for Aug 1999 for McGuire Nuclear Station,Unit 1 & 2
ML20217G810
Person / Time
Site: McGuire, Mcguire  
Issue date: 08/31/1999
From:
DUKE POWER CO.
To:
Shared Package
ML20217G791 List:
References
NUDOCS 9910210360
Download: ML20217G810 (1)


Text

y

?._

McGUIRE NUCLEAR STATION MONTHLY OPERATING STATUS REPORT i

AUGUST 1999

-.1. - ' Personnel Exposure -

1 The' total-station liquid release for AUGUST has been compared with the Technical Specifications maximum annual f

~

dose commitment and was'less than 10 percent of this limit.

The' tota'l. station gaseous release for AUGUST has been compared'with the Technical Specifications maximum annual dose commitment and was less than 10 percent of this limit.

l i

l 0

\ i

\

l I

l l

1 9910210360 DR 991013 M ADOCK 05000369 Ul ,

PDR Q b