ML20234B124
| ML20234B124 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 09/14/1987 |
| From: | NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I) |
| To: | |
| Shared Package | |
| ML20234B106 | List: |
| References | |
| 50-267-87-21, NUDOCS 8709180270 | |
| Download: ML20234B124 (1) | |
Text
'
1
'BrN. -v 6).
1 ,
v ; i. 1, .%
.' 4 '
) %' A 3 5 9 ;,- .4 s >
' Ni[ /) o ,/. l )V s ,
\l
' d- '
- APPENDIX A , .., .
q j- 7 !
i gS0TICE OF VIOLATION j PublicServiceCompanyofColorad Docket: 50-267 !
Fort St. Vrain ".
g License: DPR-34 ,
j During an NRC-. inspection conducted on August 1-31,'1987; a violation of NRC i
- l. requirements was identified. The viclation involved inadequate procedures for control _ of radioactivity. Jn accordince with the " General Statemnt of Pol'1c
. and Procedure for NRC Enforcement.' Actions," 10 CFR Part .2, Appen61x C (1987),' .
the violation is listed below:- ., . .lf, s T, ,
Inadequate Procedures for Control of Radioactivity
, . lf, ,'[6 '
Technical Specification AC 7.4.a.1 requires tfiat procedures'shall be;, . ,.. [ ' ,
O I
established, implemented, and maintained' covering the activit,ies ,
./< -
recommended in Appendix A of' Regulatory Gu'ide 1.33,14ovember '1972. L' paragraph G of'ofAppendix A to'Regulatcry 21 Guf;de 1,33 delineates proceduren for the control radioactivity. s l iJ ;e Contrary to. the above, no procedun,s existed on August 20,1987',.to_f' '
establish. responsibility or provide directions for actions to be takenf to .,
control contamination if an individual attempts to er.it the protected
- 5j
- area after the _ portal monitor alaims.
This is a Severity Level IV violations (SupplementIV)(267/8721-05,FF l
Pursuant to the provisions.of 10 CFR 2.201, Public Service Company of Colorado is hereby required tn submit a written statement or explanation to this Office .( 1 within 30 days of the date of the letter transmitting this Notice. This reply, should include for each violation: (1) the reason for the violation if <
.' ],
admitted, (2) the corrective steps that have been taken and the results i achieved. (3) the corrective steps that will be taken to avoid further a '
violations, and (4) the date when full complianca yill be achieved. Where . good cause is shown, consideration will be given to extending the response time.
Dated at Arlington, Texas, this /4/6 dayof,4g,,&t 1987 i-
)
B709180270 870914 PDR ADOCK 05000267 G PDR
',