p -
4 APPENDIX A
, NOTICE OF VIOLATION p Houston Lighting .&-Power Company Docket: 50-499 iSouthTexasProject(STP), Unit 2- Operating License: NPF-78 During an NRC inspection conducted January 1-31, 1989, a violation of NRC i
requirements was identified. The violation involved the failure to accomplish i an activity affecting quality in accordance with documented procedures. In-
- accordance with the 10 Enforcement Actions," " General CFR PartStatement 2, AppendixofCPolicy (and Procedure for NRC1989),thevio
- below:
,10 CFR Part 50, Appendix B, Criterion:Y, requires that activities affecting quality shall be prescribed by documented instructions, procedures, or drawings of a type appropriate to the circumstances and shall be accomplished in accordance with these instructions, procedures, or drawings. ,
~
a South Texas Project Station Procedure OPGP03-ZA-0039, Revision 8, " Plant Procedures Writer's Guide," Section 3.2.20, " Independent Verification," -t requires, in part, that alignment changes or_ alterations in_ status of components / systems identified as safety-related be independently verified-when a' component / system is returned to service following_a period when the component / system was inoperable due to maintenance or testing or when a component / system is removed from service or altered from its normal configuration, n ,
Contrary to the' above, Station Procedure OTEP03-FP-0006, Revision 0, ,
" Relay Room Halon Concentration Test," did not include provisions for independent' verification that the control room envelope makeup fan air inlets had beenr.estored to normal configuration after testing. This oversight ' led to the plastic sheeting being left on the Train C control room envelope makeup fan inlet thereby rendering that train inoperable.
This is a Severity Level IV violation. (Supplements)(499/8902-01)
~
Pursuant to the provisions of 10 CFR 2.201, Houston Lighting & Power Com)any is hereby required to submit to this office within 30 days of the date of tie letter transmitting this Notice, a written statement or explanation in reply, including for each violation: (1) the reason for the violation if admitted, 2)_.the corrective steps which have been taken and the results achieved,
- 3) the corrective steps which will be taken to avoid further violations, and 4).the date when full compliance will be achieved.
Dated at Arlington, Texas,
.this p g g day of 1989 8905020171 690425 hDR ADOCK 05000493 PDC