Text
__ .___ . _ _ _ _ .- - _ - _ - _ - -
.
.
.,
,
4
m
'
<.: _.
- , ..- .
3 'i '" ~ , f
-
g 0 51989 gI f
-Docket-Nos.. 50-321, 50-366
. License Nos.-DPR-57, NPF-5
,. / Georgia Power Company;
ATTN: Mr. W. .G.- Hairston,_ III
. Senior Vice President -
Nuclear Operations
-P. O. Box.1295'
- Birmingham, AL'=35201
Gentlemen:
' SUBJECT: NRC INSPECTION REPORT NOS. 50-321/89-10 AND 50-366/89-10
This refers to the Nuclear Regulatory Commission (NRC) inspection conducted by
J..E. Menning on'May 27'-' June 23, 1989. The-inspection included a. review of
activities authorized for your Hatch facility. . At the conclusion of' the
inspection, the findings were discussed with those members of your staff
identified in the enclosed Inspection Report.
- Areas examined during the inspection are identified in the report. Within
these areas, the . inspection consisted of selective examinations of procedures
.and representative records, interviews with personnel, and .observat'on of.
activities in. progress.
The'. inspection- findings indicate that certain activities appeared to violate
NRC: requirements. . However, because all of the criteria for categorization of
' licensee-identified violations were . met, two violations are not being cited.
The details - pertaining to .the licensee-identified non-cited violations are
described in the enclosed Inspection Report.
Your attention 'is also invited to the unresolved items identified in the
. Inspection Report. These matters will be pursued during future inspections.
In accordance with Section 2.790 of the NRC's " Rules of Practice," Part 2,
Title 10, Code of Federal Regulations, a copy of this letter and its enclosure
will be placed in the NRC Public Document Room.
Should you have any questions concerning this letter, please contact us. -
Sincerely.
ORIGINAL SIGNED BY
ALAN R. HERDT
89071go y 890 PW $21
PDR A t Alan R. Herdt, Chief
G Reactor Projects Branch 3
Division of Reactor Projects
Enclosure: (See page 2)
kl
- _
,
_ _ - _ _ _ _ _ - - _ _ .
Sfel
m--- . _ _
7
. 1
'
,
.
Georgia Power Company 2' ' JUL 0 a 1989 ,
I
i
Enclosure. I
NRC Inspection Report
cc w/ encl:
. R. P. Mcdonald, Executive Vice President,
-
Nuclear Operations q
J. T. Beckham, Vice President,iiant Hatch :
'
LH. C. Nix, General Manager, Plant Hatch-
O. M. Fraser, Site Quality Assurance
Manager
J.;Heidt, Manager, Nuclear Engineering
and Licensing, Plant Hatch
S. B. Tipps, Manager of Nuclear
Safety and Compliance
State of Georgia
bec w/ enc 1:
L. P. Crocker, NRR
-
M. V. Sinkule, RII
NRC Resident Inspector
' Document Control Desk
1
RII:DR -
RII:DRP
NCk
LTrocine:er J % ning/ Acting
,
06/A7/89- 06/30/89
1
!
.__ - _ _