ML20247A385

From kanterella
Revision as of 00:12, 12 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-298/89-07 on 890206-28 & Notice of Violation
ML20247A385
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/20/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20247A390 List:
References
NUDOCS 8903290113
Download: ML20247A385 (2)


See also: IR 05000298/1989007

Text

_

_ __-__ _ _ _ _ - _ - _ _ - . _ _ _

,

.s

,

... < o

"

4 "

.

MAR 201989

.In Reply Refer To:

Docket: -50-298/89-07

il

i

Nebraska Public Power District

ATTN: Mr. George A. Trevors

Division-Manager - Nuclear Support

P.O. Box 499

Co7umbus, NE 68602-0499

'

Gentlemen:

This refers to the inspection conducted by Messrs. W.'R. Bennett and G.'A. Pick

of this office during the period' February 6-28, 1989, of activities authorized

by NRC Operating License DPR-46 for_ Cooper Nuclear Station, and to the

discussion of our findings with Mr. G. R. Horn and other members of your staff

at the conclusion of the inspection.

Areas examined during the inspection included a followup of previously  !

r identified inspection findings, operational safety verification, and monthly i

surveillance and maintenance observations. Within these areas, the inspection  !

consisted of selective examination of procedures and representative records,. '

!

interviews with personnel, and observations by the NRC inspectors. The

inspection findings are documented in the enclosed inspection report.

During this; inspection, it was found that certain of your activities were in

violation of.NRC requirements. 'The violation involved a failure to provide a

ti.nely response to a Notice of Violation. Consequently, you are required to-

respond to this violation, in writing, in accordance with the provisions of 1

Section.2.201 of-the. NRC's " Rules of Practice," Part 2, Title 10, Code of

'

Federal Regulations. Your. response should be based on the specifics contained

in the Notice of Violation enclosed with this letter.

The response directed by this letter and the accompanying Notice are not

subject to the clearance procedures of.the Office of Management and Bu'dget as

required by the Paperwork Reduction Act of 1980 PL 96-511.

The NRC is concerned that your failure to provide a timely response to a recent

violation concerning training in conjunction with four violations in the arec

of training that have been issued in the last 14 months indicates a lack of

appropriate management involvement.

-

  • RIV:RI * SRI *C:DRP/C *D:DRP

GAPick/sn WRBennett GLConstable LJCallan

/ /89 / /89 / /89 / /89' 3

  • Previously concurred h

8903290113 890320 '

'

PDR ADOCK 05000298

O PDC ,

- --_ .-_ - - -

. . _

, - - .

.__.

, _

-_

. . .

i ( k

3 ..

, ,

.

>

,, - ' -

s

i 4

~

Nebraska Public Power District "-2-

"

,

,

-)

~

Should you have.any questions concerning this inspection,iwe will be pleased .

'to discuss them with you.

,

Sincerely,.

t .-Original signed:by

T. F.. Westerman '

L. J. Callan, Director; .i - l

Division of Reactor Projects'

L~

l

Enclosures:

1. Appendix A - Notice of Violation'.

2. Appendix B - NRC Inspection Report

50-298/89-07-

cc w/ enclosures:

Cooper Nuclear Station

ATTN: Guy R.' Horn, Division Manager

of Nuclear Operations l

P.O. Box 98

=Brownville, Nebraska. 68321

Kansas Radiation Control Program Director

Nebraska Radiation Control Program Director

'

bec to DMB (IE01)

bec distrib. by RIV: . .- l

. *NRC Resident Inspector R. D. Martin, RA o,-

i

  • Section Chief ~(DRP/C); *Lisa Shea,.RH/ALF 1

RPB-DRSS * MIS System j

  • NRC RIV File * Project Engineer,'DRP/C
  • RSTS Operator- ., . *DRP 3- ,'
  • P. O' Conner, NRR Project Manager, MS: 13-D- 18'.

'

l

  • DRS *G. Pick  :

1

  • w/766 .!

, .:

e

1

\

1

-

,

'

_.

4 i

'

' i

.3 ,

,

g .