Notice of Violation from Insp on 890206-28.Violation Noted: Licensee Did Not Respond to Violation 298/8831-01 Until 890210 (34 Days After Issuance of Notice of Violation)
ML20247A412
Person / Time
Site: Cooper Entergy icon.png
Issue date: 03/20/1989
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20247A390 List:
References
50-298-89-07, 50-298-89-7, NUDOCS 8903290118
Download: ML20247A412 (1)


Text

.

APPENDIX A NOTICE OF VIOLATION Nebraska Public Power District Docket: 50-298 Cooper Nuclear Station License: DPR-46 During an NRC inspection conducted February 6-28, 1989, a violation of NRC requirements was identified. The violation involved failure to provide a timely response to a notice of violation.

In accordance with the " General Statement of Policy and Procedure for NRC Enforcement Actions," 10 CFR Part 2, Appendix C (1988), the violation is listed below:

Failure to Provide a Timely Response To a Notice of Violation 10 CFR 2.201 requires that the licensee respond, in writing, to a notice of violation within a specified time.

Appendix A, Notice of Violation, to NRC Inspection Report 50-298/88-31 required that the licensee respond, in writing, to Violation 298/8831-01 within 30 days of November 18, 1988.

Contrary to the above, the licensee did not respond, in writing, to Violation 298/8831-01 until February 10, 1989 (84 days after the issuance of the violation).

This is a Severity Level IV violation. -(Supplement I) (298/8907-01)

Pursuant to the provisions of 10 CFR 2.201, Nebraska Public Power District is hereby required to submit to this office, within 30 days of the date of the letter transmitting this Notice, a written statement or explanation in reply, including for each violation: (1) the reason for the violation if admitted, (2) the corrective steps which have been taken and the results achieved, j (3) the corrective steps which will be taken to avoid further violations, and (4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.

Dated at Arlington, Texa l this 2Od day of 1989 8903290118 890320

{DR ADOCK 05000298 PDC