ML20249A021

From kanterella
Revision as of 07:08, 1 February 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
PNO-78-017:on 780127,plant Planning Shutdown to Replace 48 Terminal Blocks Located Inside Containment Necessary for Operation of Certain Safety Related Equipment & to Balance Main Turbine.Shutdown Expected to Last 24-36 Hrs
ML20249A021
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 01/27/1978
From: Klingler G, Nolan F, Sniezek J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION I)
To:
References
PNO-78-017, PNO-78-17, NUDOCS 9806150325
Download: ML20249A021 (1)


Text

- - - - - - - - - - - - - - - -

g - -- g - --

l PRELIMINARY NOTIFICATION s

Q9m= January 27, 1978 PRELIMINARY NOTIFICATION OF EVENT OR UNUSUAL OCCURRENCE--PNO:

This preliminary notification constitutes EARLY notice of an event of ,

POSSIBLE safety or public interest significance. The information presented is as initially received without verification or evaluation and is basically all that is known by IE staff on this date. i Facility: Connecticut Yankee Atomic Power Company l

I Haddam Neck Plant (DN 50-213)  !

Haddam Neck, Connecticut

Subject:

SHUTDOWN FOR REPL*sCEMENT OF TERMINAL BLOCKS Haddam Neck Plant is planning a shutdown commencing this evening (January 27,1978) to replace 48 terminal blocks located inside the I containment which are necessary for the operation of certain safety related equipment, and to also balance the main turbine.

Recent tests conducted indicate that these terminal blocks (a type of .

electrical connector) are incapable of performing satisfact,orily in the high temperature / humidity environment following a loss of coolant accident. pr.a <

, E:1..

The shutdown is expected to last 24-36 hours. >

(- Media interest is expected because of the extensive interast in environ-lQ mental qualification of safety related electrical connectors. The State of Connecticut has been informed. A press release is planned by the ' /

i' licensee. NRC Region I is considering a press release. i 6

NRC, Region I, (Philadelphia) received notification of this occurrence 4, by telephone from Haddam Neck Plant Superintendent on January 27, 1978, n at 9:10 a.m.

Q

Contact:

GKlingler, IE x28019 FNolan, IE x28019 JSniezek, IE x28019 Distribution: Transmitted H St /.* A d Chairman Hendrie Commissioner Bradford Commissioner Kennedy S. J. Chilk, SECY C. C. Kammerer, CA Commissioner Gilinsky (ForDistribution)

Transmitted: MNBB //M P Bldg /.* 2- E. Volgenau L. V. 1iossick, EDO ' E. G. Case, NRR Region I , IE/ .' d-

S. H. Hanauer, EDO J. J. Fouchard, PA SS Bldg / / ~2-+f (MAIL)

R. Hartfield, MIPC C. V. Smith, NMSS T. J. McTiernan, 0IA R. G. Ryan, OSP R. Minogue, SD H. K. Shapar, ELD

, , PRELIMINARY NOTIFICATION

.,U'8 1 .J-t 9906150325 790127 PDR 18sE PNO-78-017 PDR