ML20263K178
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML20263K178 | |
Person / Time | |
---|---|
Site: | Midland |
Issue date: | 05/07/1981 |
From: | BECHTEL GROUP, INC. |
To: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
Shared Package | |
ML20030E025 | List:
|
References | |
CON-7220 M-445, NUDOCS 8109250061 | |
Download: ML20263K178 (2) | |
Similar Documents at Midland | |
---|---|
Category:DRAWINGS
MONTHYEARML20263Q6241984-04-0202 April 1984
[Table view]Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches ML20263N5301984-03-0101 March 1984 Service Water Pump Structucrack Survey Exterior Walls East & West ML20263N5251984-03-0101 March 1984 Service Water Pump Structucrack Survey Plans at Elev 656 Ft ML20263N5361984-03-0101 March 1984 Service Water Pump Structucrack Survey Misc Wall Elevations ML20263N5281984-03-0101 March 1984 Service Water Pump Structucrack Survey Exterior Walls North & South and Miscellaneous Columns ML20263N5381984-03-0101 March 1984 Service Water Pump Structucrack Survey Misc Plans & Misc Walls ML20263N5331984-03-0101 March 1984 Service Water Pump Structucrack Survey Interior Wall Elevations ML20263N5221984-03-0101 March 1984 Service Water Pump Structucrack Survey Plans at Els 592 Ft,620 Ft & 634 Ft 6 Inches ML20263M2691984-02-15015 February 1984 Marked-up Hanger Isometric:Main Steam & Turbine Steam Aux & Turbine Bldgs Unit 1 System B. Sheet 3.Rev Date Illegible ML20263M2701984-02-15015 February 1984 Marked-up Hanger Isometric:Main Steam Turbine Steam Aux & Turbine Bldgs Unit 2 Sys A. Sheet 2.Rev Date Illegible ML20263M4371984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 646 Ft ML20263M4241984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 568 Ft ML20263M4271984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 584 Ft ML20263M4291984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 599 Ft ML20263M4321984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 614 Ft ML20263M4351984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 634 Ft 6 Inches ML20263M4401984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 659 Ft ML20263M4431984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plans at El 674 Ft & El 685 Ft ML20263M4461984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col Kc ML20263M4481984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col H ML20263M4511984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col G & F ML20263M4531984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col D & 4.55 ML20263M4551984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elev at Col Line B ML20263M5001984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elev at Col Line a ML20263M5031984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs at Col 5.1,7.9 & Hk ML20263M5061984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elev at Col 5.6 ML20263M5091984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elev at Col 7.4 ML20263M5101984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs at Col 8.7 & C ML20263M5131984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Interior Wall Elevs. Sheet 1 ML20263M5151984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Interior Wall Elevs. Sheet 2 ML20263M5181984-02-0707 February 1984 Auxiliary Building:Crack Survey Interior Wall Elevs. Sheet 3 ML20263M5211984-02-0707 February 1984 Auxiliary Building:Crack Survey Interior Wall Elevs. Sheet 4 ML20263M5231984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Interior Wall Elevs. Sheet 5 ML20263M5261984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevations. Sheet 6 ML20263M5291984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elev at 5.3 & K (E of 7.8) ML20263M5551984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs 7.8 & K (E of 7.8) ML20263M5591984-02-0707 February 1984 Auxiliary Building:Crack Survey W Wing Plans & El 614 Ft - El 708 Ft 6 Inches ML20263M5611984-02-0707 February 1984 Auxiliary Building:Crack Survey E Wing Plans & El 614 Ft - El 708 Ft 6 Inches ML20263M5681984-02-0707 February 1984 Auxiliary Building:Crack Survey Elevs at Col Aa ML20263M5691984-02-0707 February 1984 Auxiliary Building:Crack Survey Control Tower Walls Elevs ML20263M5711984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Railroad Bay Plans ML20263M5731984-02-0707 February 1984 Auxiliary Building:Crack Survey Plan at El 624 Ft & Miscl Walls ML20263M5741984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs at Col a & B & Misc Walls ML20263K7261984-01-30030 January 1984 Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches ML20263M2771984-01-13013 January 1984 Unit 2 Turbine Roll Integrated Schedule ML20263F6211983-11-21021 November 1983 Lighting and Communication Oily Waste Treatment Building. Sheet 1 of 1.Rev Date Illegible ML20263F0941983-11-21021 November 1983 Class IE 460V Motor Control Center Schedule Unit 1. Rev Date Date Illegible ML20263G2681983-11-21021 November 1983 Logic Diagram:Engineered Safety Features Actuation System. Sheet 3.Rev Date Illegible ML20263F4601983-11-21021 November 1983 Lighting and Communication Reactor and Auxiliary Bldg Unit 1 & 2 Elevation 659 Ft. Sheet 1 of 1.Rev Date Illegible ML20263G2481983-11-21021 November 1983 Local Control Panel 1C114 Auxiliary Shutdown Panel Arrangement. Sheet 1.Rev Date Illegible 1984-04-02 Category:DRAWINGS-PIPING & INSTRUMENTATION DIAGRAMS-APPLICANT'S MONTHYEARML20263Q6241984-04-0202 April 1984
[Table view]Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches ML20263M2701984-02-15015 February 1984 Marked-up Hanger Isometric:Main Steam Turbine Steam Aux & Turbine Bldgs Unit 2 Sys A. Sheet 2.Rev Date Illegible ML20263M2691984-02-15015 February 1984 Marked-up Hanger Isometric:Main Steam & Turbine Steam Aux & Turbine Bldgs Unit 1 System B. Sheet 3.Rev Date Illegible ML20263K7261984-01-30030 January 1984 Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches ML20263C3761983-11-21021 November 1983 Piping and Instrument Diagram:Miscellaneous Reactor Coolant Pump Connections - Pump 1P-51B Unit 1. Sheet B.Rev Date Illegible ML20263D2111983-11-21021 November 1983 Hanger Isometric:Component Cooling Water System Surge Lines Unit 1. Sheet 12.Rev Date Illegible ML20263C3721983-11-21021 November 1983 Piping and Instrument Diagram:Miscellaneous Reactor Coolant Pump Connections - Pump 1P-51A Unit 1. Sheet A.Rev Date Illegible ML20263C3061983-11-21021 November 1983 Piping and Instrument Diagram:Service Water Cooling Tower and Pump Structure Unit 1 & 2. Rev Date Illegible ML20263C3081983-11-21021 November 1983 Piping and Instrument Diagram:Service Water Cooling Tower and Pump Structure Unit 1 & 2. Rev Date Illegible ML20263C5121983-11-21021 November 1983 Piping & Instrument Diagram:Feedwater & Condensate Unit 2. Sheet 2B.Rev Date Illegible ML20263C3031983-11-21021 November 1983 Piping and Instrument Diagram:Component Cooling Water Unit 2. Sheet 2B.Rev Date Illegible ML20263D6121983-11-21021 November 1983 Piping and Instrumentation Diagram:Plant Radiation Monitoring System Liquid Monitors. Sheet 6.Rev Date Illegible ML20263C2731983-11-21021 November 1983 Piping & Instrument Diagram:Reactor Building Spray Unit 2. Rev Date Illegible ML20263C2621983-11-21021 November 1983 Piping & Instrument Diagram:Decay Heat Removal & Core Flooding Unit 2. Rev Date Illegible ML20263C2871983-11-21021 November 1983 Piping and Instrument Diagram:Component Cooling Water Unit 1. Sheet 2A.Rev Date Illegible ML20263C4541983-11-21021 November 1983 Piping & Instrument Diagram:Turbine Extraction Heater Vents & Drains Unit 1. Sheet 1A.Rev Date Illegible ML20263C2491983-11-21021 November 1983 Piping and Instrument Diagram:Boron Recovery Units 1 & 2. Sheet 5.Rev Date Illegible ML20263C1901983-11-21021 November 1983 Piping and Instrument Diagram:Make-up and Purification Unit 2. Sheet 1B.Rev Date Illegible ML20263C2161983-11-21021 November 1983 Piping and Instrument Diagram:Reactor Plant Sample System Unit 1. Sheet 2.Rev Date Illegible ML20263C4451983-11-21021 November 1983 Piping & Instrument Diagram:Auxiliary Steam Unit 2. Rev Date Illegible ML20263C1861983-11-21021 November 1983 Piping and Instrument Diagram:Make-up and Purification Unit 1. Sheet 2B.Rev Date Illegible ML20263C4601983-11-21021 November 1983 Piping and Instrument Diagram:Turbine Extraction Heater Vents & Drains Unit 1. Sheet 2A.Rev Date Illegible ML20263C2591983-11-21021 November 1983 Piping and Instrument Diagram:Decay Heat Removal and Core Flooding Unit 1. Rev Date Illegible ML20263C2281983-11-21021 November 1983 Piping and Instrument Diagram:Liquid Waste Unit 1 & 2. Sheet 2A.Rev Date Illegible ML20263C2931983-11-21021 November 1983 Piping and Instrument Diagram:Component Cooling Water Unit 2. Sheet 1A.Rev Date Illegible ML20263C2991983-11-21021 November 1983 Piping and Instrument Diagram:Component Cooling Water Unit 2. Sheet 2A.Rev Date Illegible ML20263C2961983-11-21021 November 1983 Piping and Instrument Diagram:Component Cooling Water Unit 2. Sheet 1B.Rev Date Illegible ML20263C1821983-11-21021 November 1983 Piping and Instrument Diagram:Make-up and Purification Unit 1. Sheet 1B.Rev Date Illegible ML20263C2841983-11-21021 November 1983 Piping and Instrument Diagram:Component Cooling Water Unit 1. Sheet 1B.Rev Date Illegible ML20263C2401983-11-21021 November 1983 Piping and Instrument Diagram:Radwaste Pump Seal Water System Units 1 & 2. Sheet 4B.Rev Date Illegible ML20263C2131983-11-21021 November 1983 Piping and Instrument Diagram:Reactor Plant Sample System Unit 1. Sheet 1.Rev Date Illegible ML20263C3111983-11-21021 November 1983 Piping and Instrument Diagram:Service Water Reactor and Auxiliary Building Units 1 & 2. Rev Date Illegible ML20263C1801983-11-21021 November 1983 Piping and Instrument Diagram:Make-up and Purification Unit 1. Sheet 1A.Rev Date Illegible ML20263C2481983-11-21021 November 1983 Piping and Instrument Diagram:Boron Recovery Unit 1 & 2. Sheet 4B.Rev Date Illegible ML20263C5151983-11-21021 November 1983 Piping and Instrument Diagram:Feedwater and Condensate Unit 2. Sheet 3A.Rev Date Illegible ML20263C2221983-11-21021 November 1983 Piping and Instrument Diagram:Reactor Plant Sample System Unit 2. Sheet 4.Rev Date Illegible ML20263C1681983-11-21021 November 1983 Legend:Piping and Instrument Diagram. Sheet 2.Rev Date Illegible ML20263C2341983-11-21021 November 1983 Piping and Instrument Diagram:Liquid Waste Unit 1 & 2. Sheet 3B.Rev Date Illegible ML20263C4011983-11-21021 November 1983 Piping and Instrument Diagram:Evaporator Sample System. Sheet 1.Rev Date Illegible ML20263D9401983-11-21021 November 1983 Hanger Isometric:Make-up and Purification System Pump B Suction & Discharge Unit 2. Sheet 6.Rev Date Illegible ML20263C2811983-11-21021 November 1983 Piping and Instrument Diagram:Component Cooling Water Unit 1. Sheet 1A.Rev Date Illegible ML20263C1701983-11-21021 November 1983 Legend:Piping and Instrument Diagram. Sheet 3.Rev Date Illegible ML20263C5661983-11-21021 November 1983 Piping and Instrument Diagram:Heating,Ventilation and Air Conditioning,Reactor Building Unit 1. Rev Date Illegible ML20263C2431983-11-21021 November 1983 Piping and Instrument Diagram:Boron Recovery Unit 1 & 2. Sheet 1.Rev Date Illegible ML20263C3901983-11-21021 November 1983 Piping and Instrument Diagram:Liquid Waste Evaporator. Rev Date Illegible ML20263D2141983-11-21021 November 1983 Hanger Isometric:Component Cooling Water System (Reactor Building Supply & Return Header Unit 2). Rev Date Illegible ML20263D2471983-11-21021 November 1983 Piping & Instrument Diagram:Evaporator Process Steam to Dow. Sheet 5B.Rev Date Illegible ML20263C3481983-11-21021 November 1983 Piping & Instrument Diagram:Service Water Turbine Building Unit 1. Sheet 1A.Rev Date Illegible ML20263C2191983-11-21021 November 1983 Piping and Instrument Diagram:Reactor Plant Sample System Unit 2. Sheet 3.Rev Date Illegible ML20263D2771983-11-21021 November 1983 Hanger Isometric:Service Water System Pump Structure Header. Sheet 1.Rev Date Illegible 1984-04-02 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20263K178&oldid=3128309"