Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20263Q624 | 2 April 1984 | Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches | |
ML20263M269 | 15 February 1984 | Marked-up Hanger Isometric:Main Steam & Turbine Steam Aux & Turbine Bldgs Unit 1 System B. Sheet 3.Rev Date Illegible | |
ML20263M270 | 15 February 1984 | Marked-up Hanger Isometric:Main Steam Turbine Steam Aux & Turbine Bldgs Unit 2 Sys A. Sheet 2.Rev Date Illegible | |
ML20263K726 | 30 January 1984 | Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches | |
ML20263M273 | 13 September 1983 | Marked-up Hanger Isometric:Main Steam Turbine Steam Aux Turbine Bldgs Unit 2 Sys B. Sheet 3 | |
ML20263M254 | 25 August 1983 | Marked-up Piping and Instrument Diagram:Service Water Cooling Tower and Pump Structure Unit 1 & 2 | |
ML20263M249 | 25 August 1983 | Marked-up Piping and Instrument Diagram:Service Water Cooling Tower and Pump Structure Unit 1 & 2 | |
ML20263M258 | 14 July 1983 | Marked-up Hanger Isometric:High Pressure Steam to Evaporator Building. Sheet 1 | |
ML20263B794 | 24 June 1983 | Hanger Isometric:Decay Heat Removal and Core Flooding System Unit 2 (Reactor Bldg Headers). Sheet 1 | |
ML20259C692 | 7 June 1983 | Geologic Cross Section B-B and C-C Service Water Pump Structure | |
ML20259C687 | 6 June 1983 | Geologic Cross Sections A-A and D-D Service Water Pump Structure | |
ML20259C682 | 6 June 1983 | Geologic Cross Section Location Plan Service Water Pump Structure | |
ML20263M261 | 15 February 1983 | Marked-up Hanger Isometric:Main Steam and Turbine Steam Aux & Turbine Unit 1 System A. Sheet 2 | |
ML20263H772 | 13 January 1983 | Hanger Isometric:Make-Up and Purification System Unit 2. Sheet 18.Rev Date Illegible | |
ML20263H528 | 13 January 1983 | Piping & Instrument Diagram:Plant Heating Auxiliary & Reactor Buildings. Sheet 2B.Rev Sheet Encl.Rev Date Illegible | |
ML20263H458 | 13 January 1983 | Piping and Instrument Diagram:Feedwater Chemical Addition Unit 1. Rev Sheet Encl.Rev Date Illegible | |
ML20263H320 | 13 January 1983 | Piping and Instrument Diagram:Reactor Building Penetration Pressurization Unit-2. Sheet 2.Rev Sheet Encl.Rev Date Illegible | |
ML20263J057 | 13 January 1983 | Hanger Isometric:Feedwater and Condensate System Unit-2 (Reactor Bldg Main Feedwater Headers). Sheet 13.Rev Date Illegible | |
ML20263H750 | 13 January 1983 | Hanger Isometric:Make Up & Purification System Discharge System - Unit 2. Sheet 9.Rev Date Illegible | |
ML20263H463 | 13 January 1983 | Piping and Instrument Diagram:Feedwater Chemical Addition Unit 2. Rev Sheet Encl.Rev Date Illegible | |
ML20263H576 | 13 January 1983 | Piping and Instrument Diagram:Turbine Extraction Steam to Evaporators. Sheet 4.Rev Sheet Encl.Rev Date Illegible | |
ML20263H732 | 13 January 1983 | Hanger Isometric:Make-Up and Purification System Unit-2 (Reactor Bldg HP Injection). Sheet 1.Rev Date Illegible | |
ML20263H709 | 13 January 1983 | Hanger Isometric:Make-Up and Purification System Unit-1. Sheet 11.Rev Date Illegible | |
ML20263J036 | 13 January 1983 | Hanger Isometric:Auxiliary Feedwater Suction System Units 1 & 2. Sheet 4.Rev Date Illegible | |
ML20263H612 | 13 January 1983 | Piping and Instrument Diagram:Heating Ventilating & Air Conditioning Office & Service Building. Sheet 3.Rev Sheet Encl.Rev Date Illegible | |
ML20263H787 | 13 January 1983 | Hanger Isometric:Decay Heat Removal Discharge System a Engineered Safeguards Room Unit 1. Sheet 4.Rev Date Illegible | |
ML20263H946 | 13 January 1983 | Hanger Isometric:Component Cooling Water System Unit 2 Fuel Pool Cooling Heat Exch Supply & Return. Sheet 11.Rev Date Illegible | |
ML20263H351 | 13 January 1983 | Piping and Instrument Diagram:Auxiliary Steam Boilers. Sheet 1A.Rev Sheet Encl.Rev Date Illegible | |
ML20263H672 | 13 January 1983 | Piping and Instrument Diagram:Plant Radiation Monitoring System Airborne Monitors. Sheet 4.Rev Sheet Encl.Rev Date Illegible | |
ML20263H961 | 13 January 1983 | Hanger Isometric:Service Water Return - System a Unit 1 & 2. Sheet 5.Rev Date Illegible | |
ML20263H624 | 13 January 1983 | Piping and Instrument Diagram:Heating,Ventilating & Air Conditioning Misc Structure. Sheet 7.Rev Sheet Encl. Rev Date Illegible | |
ML20263H899 | 13 January 1983 | Hanger Isometric:Component Cooling Water Supply System B Unit 1. Sheet 8.Rev Date Illegible | |
ML20263H892 | 13 January 1983 | Hanger Isometric:Component Cooling Water Return System a Unit 1. Sheet 7.Rev Date Illegible | |
ML20263H678 | 13 January 1983 | Hanger Isometric:Make-Up and Purification System Unit-1 (Reactor Bldg HP Injection). Sheet 1.Rev Date Illegible | |
ML20263H392 | 13 January 1983 | Piping & Instrument Diagram:Auxiliary Steam Unit 2. Rev Sheet Encl.Rev Date Illegible | |
ML20263H933 | 13 January 1983 | Hanger Isometric:Component Cooling Water Return System a Unit 2. Sheet 7.Rev Date Illegible | |
ML20263H586 | 13 January 1983 | Piping and Instrument Diagram:Miscellaneous Gas Supply Hydrogen Supply System. Sheet 1A.Rev Sheet Encl.Rev Date Illegible | |
ML20263J112 | 13 January 1983 | Hanger Isometric:Aux Bldg Safety Related Chilled Water System Train A. Sheet 44.Rev Date Illegible | |
ML20263H995 | 13 January 1983 | Hanger Isometric:Service Water System Reactor and Aux Bldg Unit-1 (Reactor Bldg B System Return Headers). Sheet 13. Rev Date Illegible | |
ML20263H964 | 13 January 1983 | Hanger Isometric:Service Water Supply System B Units 1 & 2. Sheet 6.Rev Date Illegible | |
ML20263J116 | 13 January 1983 | Hanger Isometric:Aux Bldg Safety Related Chilled Water System Train B. Sheet 45.Rev Date Illegible | |
ML20263H739 | 13 January 1983 | Hanger Isometric:Make-Up and Purification System Unit 2 (Reactor Bldg Primary Coolant Letdown Line). Sheet 3. Rev Date Illegible | |
ML20263J019 | 13 January 1983 | Hanger Isometric:Auxiliary Feedwater Suction System Units 1 & 2. Sheet 3.Rev Date Illegible | |
ML20263H920 | 13 January 1983 | Hanger Isometric:Component Cooling Water System Unit-2 (Rcb Supply Hdr to CRD Mech & Rc Pump Seal Coolers). Sheet 4.Rev Date Illegible | |
ML20263H723 | 13 January 1983 | Hanger Isometric:Make-Up and Purification System Unit-1. Sheet 15.Rev Date Illegible | |
ML20263H720 | 13 January 1983 | Hanger Isometric:Make-Up and Purification System Unit-1. Sheet 14.Rev Date Illegible | |
ML20263H629 | 13 January 1983 | Piping & Instrument Diagram:Boron Recovery Degasifier. Rev Sheet Encl.Rev Date Illegible | |
ML20263H379 | 13 January 1983 | Piping & Instrument Diagram:Main Steam & Turbine Steam Unit 2. Sheet 2A.Rev Sheet Encl.Rev Date Illegible | |
ML20263J102 | 13 January 1983 | Hanger Isometric:Aux Bldg Safety Related Chilled Water System Unit 2 Train B Supply. Sheet 41.Rev Date Illegible | |
ML20263J009 | 13 January 1983 | Hanger Isometric:Main Steam Turbine Steam Aux Turbine Bldgs Unit 2 Sys B. Sheet 3.Rev Date Illegible |