ML20263J926
From kanterella
Jump to navigation
Jump to search
ML20263J926 | |
Person / Time | |
---|---|
Site: | Midland |
Issue date: | 08/07/1981 |
From: | BECHTEL GROUP, INC. |
To: | CONSUMERS ENERGY CO. (FORMERLY CONSUMERS POWER CO.) |
Shared Package | |
ML20030E025 | List:
|
References | |
CON-7220 M-479-(Q), NUDOCS 8109240188 | |
Download: ML20263J926 (2) | |
Similar Documents at Midland | |
---|---|
Category:DRAWINGS
MONTHYEARML20263Q6241984-04-0202 April 1984
[Table view]Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches ML20263M2701984-02-15015 February 1984 Marked-up Hanger Isometric:Main Steam Turbine Steam Aux & Turbine Bldgs Unit 2 Sys A. Sheet 2.Rev Date Illegible ML20263M2691984-02-15015 February 1984 Marked-up Hanger Isometric:Main Steam & Turbine Steam Aux & Turbine Bldgs Unit 1 System B. Sheet 3.Rev Date Illegible ML20263M4431984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plans at El 674 Ft & El 685 Ft ML20263M5231984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Interior Wall Elevs. Sheet 5 ML20263M5261984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevations. Sheet 6 ML20263M5291984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elev at 5.3 & K (E of 7.8) ML20263M5211984-02-0707 February 1984 Auxiliary Building:Crack Survey Interior Wall Elevs. Sheet 4 ML20263M5181984-02-0707 February 1984 Auxiliary Building:Crack Survey Interior Wall Elevs. Sheet 3 ML20263M5151984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Interior Wall Elevs. Sheet 2 ML20263M5131984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Interior Wall Elevs. Sheet 1 ML20263M5101984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs at Col 8.7 & C ML20263M5551984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs 7.8 & K (E of 7.8) ML20263M5591984-02-0707 February 1984 Auxiliary Building:Crack Survey W Wing Plans & El 614 Ft - El 708 Ft 6 Inches ML20263M5611984-02-0707 February 1984 Auxiliary Building:Crack Survey E Wing Plans & El 614 Ft - El 708 Ft 6 Inches ML20263M5681984-02-0707 February 1984 Auxiliary Building:Crack Survey Elevs at Col Aa ML20263M5691984-02-0707 February 1984 Auxiliary Building:Crack Survey Control Tower Walls Elevs ML20263M5711984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Railroad Bay Plans ML20263M5731984-02-0707 February 1984 Auxiliary Building:Crack Survey Plan at El 624 Ft & Miscl Walls ML20263M5741984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs at Col a & B & Misc Walls ML20263M5091984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elev at Col 7.4 ML20263M5061984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elev at Col 5.6 ML20263M5031984-02-0707 February 1984 Auxiliary Building:Crack Survey Wall Elevs at Col 5.1,7.9 & Hk ML20263M5001984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elev at Col Line a ML20263M4551984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elev at Col Line B ML20263M4531984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col D & 4.55 ML20263M4511984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col G & F ML20263M4481984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col H ML20263M4461984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Wall Elevs at Col Kc ML20263M4401984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 659 Ft ML20263M4371984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 646 Ft ML20263M4351984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 634 Ft 6 Inches ML20263M4321984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 614 Ft ML20263M4291984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 599 Ft ML20263M4271984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 584 Ft ML20263M4241984-02-0707 February 1984 Auxiliary Bldg:Crack Survey Plan at El 568 Ft ML20263K7261984-01-30030 January 1984 Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches ML20263M2771984-01-13013 January 1984 Unit 2 Turbine Roll Integrated Schedule ML20263M2731983-09-13013 September 1983 Marked-up Hanger Isometric:Main Steam Turbine Steam Aux Turbine Bldgs Unit 2 Sys B. Sheet 3 ML20263M2491983-08-25025 August 1983 Marked-up Piping and Instrument Diagram:Service Water Cooling Tower and Pump Structure Unit 1 & 2 ML20263M2541983-08-25025 August 1983 Marked-up Piping and Instrument Diagram:Service Water Cooling Tower and Pump Structure Unit 1 & 2 ML20261A6001983-07-25025 July 1983 Settlement Vs Time:Reactor Buildings. No Rev Date ML20263M2581983-07-14014 July 1983 Marked-up Hanger Isometric:High Pressure Steam to Evaporator Building. Sheet 1 ML20259D0491983-06-28028 June 1983 Dewatering Events ML20263B7941983-06-24024 June 1983 Hanger Isometric:Decay Heat Removal and Core Flooding System Unit 2 (Reactor Bldg Headers). Sheet 1 ML20259C6921983-06-0707 June 1983 Geologic Cross Section B-B and C-C Service Water Pump Structure ML20259C6871983-06-0606 June 1983 Geologic Cross Sections A-A and D-D Service Water Pump Structure ML20259C6821983-06-0606 June 1983 Geologic Cross Section Location Plan Service Water Pump Structure ML20263M2611983-02-15015 February 1983 Marked-up Hanger Isometric:Main Steam and Turbine Steam Aux & Turbine Unit 1 System A. Sheet 2 ML20263J1161983-01-13013 January 1983 Hanger Isometric:Aux Bldg Safety Related Chilled Water System Train B. Sheet 45.Rev Date Illegible 1984-04-02 Category:DRAWINGS-PIPING & INSTRUMENTATION DIAGRAMS-APPLICANT'S MONTHYEARML20263Q6241984-04-0202 April 1984
[Table view]Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches ML20263M2691984-02-15015 February 1984 Marked-up Hanger Isometric:Main Steam & Turbine Steam Aux & Turbine Bldgs Unit 1 System B. Sheet 3.Rev Date Illegible ML20263M2701984-02-15015 February 1984 Marked-up Hanger Isometric:Main Steam Turbine Steam Aux & Turbine Bldgs Unit 2 Sys A. Sheet 2.Rev Date Illegible ML20263K7261984-01-30030 January 1984 Diesel Generator Typical Utility Interconnection Plan Above El 634 Ft 6 Inches ML20263M2731983-09-13013 September 1983 Marked-up Hanger Isometric:Main Steam Turbine Steam Aux Turbine Bldgs Unit 2 Sys B. Sheet 3 ML20263M2541983-08-25025 August 1983 Marked-up Piping and Instrument Diagram:Service Water Cooling Tower and Pump Structure Unit 1 & 2 ML20263M2491983-08-25025 August 1983 Marked-up Piping and Instrument Diagram:Service Water Cooling Tower and Pump Structure Unit 1 & 2 ML20263M2581983-07-14014 July 1983 Marked-up Hanger Isometric:High Pressure Steam to Evaporator Building. Sheet 1 ML20263B7941983-06-24024 June 1983 Hanger Isometric:Decay Heat Removal and Core Flooding System Unit 2 (Reactor Bldg Headers). Sheet 1 ML20259C6921983-06-0707 June 1983 Geologic Cross Section B-B and C-C Service Water Pump Structure ML20259C6871983-06-0606 June 1983 Geologic Cross Sections A-A and D-D Service Water Pump Structure ML20259C6821983-06-0606 June 1983 Geologic Cross Section Location Plan Service Water Pump Structure ML20263M2611983-02-15015 February 1983 Marked-up Hanger Isometric:Main Steam and Turbine Steam Aux & Turbine Unit 1 System A. Sheet 2 ML20263H7721983-01-13013 January 1983 Hanger Isometric:Make-Up and Purification System Unit 2. Sheet 18.Rev Date Illegible ML20263H5281983-01-13013 January 1983 Piping & Instrument Diagram:Plant Heating Auxiliary & Reactor Buildings. Sheet 2B.Rev Sheet Encl.Rev Date Illegible ML20263H4581983-01-13013 January 1983 Piping and Instrument Diagram:Feedwater Chemical Addition Unit 1. Rev Sheet Encl.Rev Date Illegible ML20263H3201983-01-13013 January 1983 Piping and Instrument Diagram:Reactor Building Penetration Pressurization Unit-2. Sheet 2.Rev Sheet Encl.Rev Date Illegible ML20263J0571983-01-13013 January 1983 Hanger Isometric:Feedwater and Condensate System Unit-2 (Reactor Bldg Main Feedwater Headers). Sheet 13.Rev Date Illegible ML20263H7501983-01-13013 January 1983 Hanger Isometric:Make Up & Purification System Discharge System - Unit 2. Sheet 9.Rev Date Illegible ML20263H4631983-01-13013 January 1983 Piping and Instrument Diagram:Feedwater Chemical Addition Unit 2. Rev Sheet Encl.Rev Date Illegible ML20263H5761983-01-13013 January 1983 Piping and Instrument Diagram:Turbine Extraction Steam to Evaporators. Sheet 4.Rev Sheet Encl.Rev Date Illegible ML20263H7321983-01-13013 January 1983 Hanger Isometric:Make-Up and Purification System Unit-2 (Reactor Bldg HP Injection). Sheet 1.Rev Date Illegible ML20263H7091983-01-13013 January 1983 Hanger Isometric:Make-Up and Purification System Unit-1. Sheet 11.Rev Date Illegible ML20263J0361983-01-13013 January 1983 Hanger Isometric:Auxiliary Feedwater Suction System Units 1 & 2. Sheet 4.Rev Date Illegible ML20263H6121983-01-13013 January 1983 Piping and Instrument Diagram:Heating Ventilating & Air Conditioning Office & Service Building. Sheet 3.Rev Sheet Encl.Rev Date Illegible ML20263H7871983-01-13013 January 1983 Hanger Isometric:Decay Heat Removal Discharge System a Engineered Safeguards Room Unit 1. Sheet 4.Rev Date Illegible ML20263H9461983-01-13013 January 1983 Hanger Isometric:Component Cooling Water System Unit 2 Fuel Pool Cooling Heat Exch Supply & Return. Sheet 11.Rev Date Illegible ML20263H3511983-01-13013 January 1983 Piping and Instrument Diagram:Auxiliary Steam Boilers. Sheet 1A.Rev Sheet Encl.Rev Date Illegible ML20263H6721983-01-13013 January 1983 Piping and Instrument Diagram:Plant Radiation Monitoring System Airborne Monitors. Sheet 4.Rev Sheet Encl.Rev Date Illegible ML20263H9611983-01-13013 January 1983 Hanger Isometric:Service Water Return - System a Unit 1 & 2. Sheet 5.Rev Date Illegible ML20263H6241983-01-13013 January 1983 Piping and Instrument Diagram:Heating,Ventilating & Air Conditioning Misc Structure. Sheet 7.Rev Sheet Encl. Rev Date Illegible ML20263H8991983-01-13013 January 1983 Hanger Isometric:Component Cooling Water Supply System B Unit 1. Sheet 8.Rev Date Illegible ML20263H8921983-01-13013 January 1983 Hanger Isometric:Component Cooling Water Return System a Unit 1. Sheet 7.Rev Date Illegible ML20263H6781983-01-13013 January 1983 Hanger Isometric:Make-Up and Purification System Unit-1 (Reactor Bldg HP Injection). Sheet 1.Rev Date Illegible ML20263H3921983-01-13013 January 1983 Piping & Instrument Diagram:Auxiliary Steam Unit 2. Rev Sheet Encl.Rev Date Illegible ML20263H9331983-01-13013 January 1983 Hanger Isometric:Component Cooling Water Return System a Unit 2. Sheet 7.Rev Date Illegible ML20263H5861983-01-13013 January 1983 Piping and Instrument Diagram:Miscellaneous Gas Supply Hydrogen Supply System. Sheet 1A.Rev Sheet Encl.Rev Date Illegible ML20263J1121983-01-13013 January 1983 Hanger Isometric:Aux Bldg Safety Related Chilled Water System Train A. Sheet 44.Rev Date Illegible ML20263H9951983-01-13013 January 1983 Hanger Isometric:Service Water System Reactor and Aux Bldg Unit-1 (Reactor Bldg B System Return Headers). Sheet 13. Rev Date Illegible ML20263H9641983-01-13013 January 1983 Hanger Isometric:Service Water Supply System B Units 1 & 2. Sheet 6.Rev Date Illegible ML20263J1161983-01-13013 January 1983 Hanger Isometric:Aux Bldg Safety Related Chilled Water System Train B. Sheet 45.Rev Date Illegible ML20263H7391983-01-13013 January 1983 Hanger Isometric:Make-Up and Purification System Unit 2 (Reactor Bldg Primary Coolant Letdown Line). Sheet 3. Rev Date Illegible ML20263J0191983-01-13013 January 1983 Hanger Isometric:Auxiliary Feedwater Suction System Units 1 & 2. Sheet 3.Rev Date Illegible ML20263H9201983-01-13013 January 1983 Hanger Isometric:Component Cooling Water System Unit-2 (Rcb Supply Hdr to CRD Mech & Rc Pump Seal Coolers). Sheet 4.Rev Date Illegible ML20263H7231983-01-13013 January 1983 Hanger Isometric:Make-Up and Purification System Unit-1. Sheet 15.Rev Date Illegible ML20263H7201983-01-13013 January 1983 Hanger Isometric:Make-Up and Purification System Unit-1. Sheet 14.Rev Date Illegible ML20263H6291983-01-13013 January 1983 Piping & Instrument Diagram:Boron Recovery Degasifier. Rev Sheet Encl.Rev Date Illegible ML20263H3791983-01-13013 January 1983 Piping & Instrument Diagram:Main Steam & Turbine Steam Unit 2. Sheet 2A.Rev Sheet Encl.Rev Date Illegible ML20263J1021983-01-13013 January 1983 Hanger Isometric:Aux Bldg Safety Related Chilled Water System Unit 2 Train B Supply. Sheet 41.Rev Date Illegible ML20263J0091983-01-13013 January 1983 Hanger Isometric:Main Steam Turbine Steam Aux Turbine Bldgs Unit 2 Sys B. Sheet 3.Rev Date Illegible 1984-04-02 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20263J926&oldid=3128510"