ML20263R581
From kanterella
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
ML20263R581 | |
Person / Time | |
---|---|
Site: | Catawba |
Issue date: | 04/08/1981 |
From: | DUKE POWER CO. |
To: | |
Shared Package | |
ML20011A174 | List:
|
References | |
REF-GTECI-A-36, REF-GTECI-SF, RTR-NUREG-0612, RTR-NUREG-612, TASK-A-36, TASK-OR CN-1200-9.1, CN-1200-9.1-01, CN-1200-9.1-1, NUDOCS 8111100253 | |
Download: ML20263R581 (1) | |
Similar Documents at Catawba | |
---|---|
Category:ARRANGEMENT-GENERAL--DRAWINGS-APPLICANT'S FACILITY
MONTHYEARML20259D3121984-10-0808 October 1984
[Table view]General Arrangement:Containment and Reactor Building Unit 1 Plan at El 582 Ft 6 Inches. Rev Date Illegible ML20263M9381984-01-10010 January 1984 Electrical Equipment Layout:Reactor Building Pene Schedule ML20263M9361984-01-10010 January 1984 Electrical Equipment Layout:Reactor Building Pene Schedule ML20263P0811983-12-20020 December 1983 Auxiliary Building Units 1 & 2 Floor El 560 Ft General Arrangement Architectural Switchgear Room Plans ML20263P0771983-12-0606 December 1983 Assembly Layout:General Service Cold Penetration Assembly Type C-1,C-2,C-3 & C-4 ML20263P0881983-12-0101 December 1983 Auxiliary Building Structural Steel By-Pass Leakage Enclosure Sections and Details ML20263C6311983-11-22022 November 1983 Auxiliary Building General Arrangement:Health Physics Area Plan at El 594 Ft & El 609 Ft. Rev Date Illegible ML20263M9411983-11-14014 November 1983 Aux Bldg & Serv Bldg Equipment Layout El 594 Ft Control Room Computer Room ML20263C2361982-11-0101 November 1982 General Arrangement Fuel Building Unit 2 Plan at El 594 Ft ML20263C2271982-10-22022 October 1982 Auxiliary Building Floor El 594 Ft General Arrangement Control Room Plan ML20263C2441982-09-30030 September 1982 Auxiliary Building Hot Machine Shop Area General Arrangement Floor Plan El 594 Ft ML20263C2461982-07-29029 July 1982 Auxiliary Building General Arrangement Contaminated Tool Calibration Room Area Plan at El 594 Ft and El 809 Ft ML20261M7711982-07-0101 July 1982 Auxiliary Building General Arrangement:Hoist,Crane and Monorail Schedule. No Revision Date ML20260H5661982-03-0909 March 1982 Plan at El 605 Ft 10 Inches & El 619 Ft. No Date ML20260H5631982-03-0909 March 1982 Plan at El 594 Ft. No Date ML20260H5581982-03-0909 March 1982 Plan at El 577 Ft. No Date ML20260H5541982-03-0909 March 1982 Plan at El 560 Ft. No Date ML20260H5511982-03-0909 March 1982 Plan at El 543 Ft. No Date ML20260H5461982-03-0909 March 1982 Plan at El 522 Ft. No Date ML20263R6031981-09-24024 September 1981 Auxiliary Building Fuel Building Unit 2 General Arrangement/Architectural Plan at New Fuel Storage. No Revision Date ML20263R5911981-09-24024 September 1981 Auxiliary Building Units 1 & 2 - Floor El 594 Ft General Arrangement/Architectural Penetration Room Plans ML20263R5861981-09-24024 September 1981 Auxiliary Building Units 1 & 2 - Floor El 574 Ft General Arrangement/Architectural Cable Room Plan. No Revision Date ML20263R5721981-09-24024 September 1981 Auxiliary Building Units 1 & 2 - Floor El 560 Ft General Arrangement/Architectural Plan. Sheet 1 of 3.No Revision Date ML20263R5741981-09-24024 September 1981 Auxiliary Building Units 1 & 2 - Floor El 560 Ft General Arrangement/Architectural Plan. Sheet 2 of 3.No Revision Date ML20263T2311981-08-31031 August 1981 Fire Protection Layout & Boundaries:Auxiliary Building Elevation 560 Ft ML20263T2411981-08-31031 August 1981 Fire Protection Layout & Boundaries:Auxiliary Building Elevation 577 Ft ML20263T2281981-08-31031 August 1981 Fire Protection Layout & Boundaries:Auxiliary Building Elevation 543 Ft ML20263T2251981-08-31031 August 1981 Fire Protection Layout & Boundaries:Auxiliary Building Elevation 522 Ft ML20262C7321981-08-25025 August 1981 Reactor Building General Arrangement:Hoist,Crane and Monorail Schedule ML20263R5661981-07-21021 July 1981 General Arrangement:Containment and Reactor Building Unit 2 Top Deck El 669 Ft 5 Inches and Laydown Space ML20263R5641981-07-21021 July 1981 General Arrangement:Containment and Reactor Building Unit 2 Plan at El 652 Ft 7 1/2 Inches ML20263R5621981-07-21021 July 1981 General Arrangement:Containment and Reactor Building Unit 2 Plan at Operating Floor El 605 Ft 10 Inches ML20263R5611981-07-21021 July 1981 General Arrangement:Containment and Reactor Building Unit 2 Plan at El 594 Ft 10 3/4 Inches ML20263R5961981-06-0303 June 1981 Auxiliary Building Fuel Building Unit 1 General Arrangement/Architectural Plans at New Fuel Storage ML20263R6081981-05-0808 May 1981 Auxiliary Building Diesel Generator Area Unit 1 General Arrangement/Architectural Floor Plan El 556 Ft Roof Plan El 594 Ft ML20263R5891981-05-0808 May 1981 Auxiliary Building Units 1 & 2 - Floor El 594 Ft General Arrangement/Architectural Plan. Sheet 3 of 3 ML20263R5871981-05-0808 May 1981 Auxiliary Building Units 1 & 2 - Floor El 594 Ft General Arrangement/Architectural Plan. Sheet 2 of 3 ML20263R6101981-05-0505 May 1981 Auxiliary Building Diesel Generator Area Unit 2 General Arrangement/Architectural Floor Plan El 556 Ft Roof Plan El 594 Ft ML20261M7741981-04-30030 April 1981 Auxiliary Building Units 1-2 - Floor El 522 Ft General Arrangement/Architectural Plan. Sheet 1 of 2 ML20263R5761981-04-0808 April 1981 Auxiliary Building Units 1 & 2 - Floor El 560 Ft General Arrangement/Architectural Plan. Sheet 3 of 3 ML20263R5841981-04-0808 April 1981 Auxiliary Building Units 1 & 2 - Floor El 577 Ft General Arrangement/Architectural Plan. Sheet 3 of 3 ML20263R5771981-04-0808 April 1981 Auxiliary Building Units 1 & 2 - Floor El 554 Ft General Arrangement/Architectural Battery Room Plan ML20263R5671981-04-0808 April 1981 Auxiliary Building Units 1 & 2 - Fl El 543 Ft General Arrangement/Architectural Plan. Sheet 2 of 3 ML20263R5691981-04-0808 April 1981 Auxiliary Building Units 1 & 2 - Fl El 543 Ft General Arrangement/Architectural Plan. Sheet 3 of 3 ML20263R5811981-04-0808 April 1981 Auxiliary Building Units 1 & 2 - Floor El 577 Ft General Arrangement/Architectural Plan. Sheet 1 of 3 ML20263R5791981-04-0808 April 1981 Auxiliary Building Units 1 & 2 - Floor - El 560 Ft General Arrangement/Architectural Switchgear Room Plans ML20263R5711981-03-31031 March 1981 Auxiliary Building Units 1 & 2 - Floor El 547 Ft General Arrangement/Architectural Auxiliary Feedwater Pump Room Plans ML20263P0531981-03-18018 March 1981 Reactor Building:Spare Penetration Sleeve Capping Details ML20263R5821981-03-0909 March 1981 Auxiliary Building Units 1 & 2 - Floor El 577 Ft General Arrangement/Architectural Plan. Sheet 2 of 3 ML20263R6061981-03-0909 March 1981 Auxiliary Building Hot Machine Shop Area General Arrangement Floor Plan El 594 Ft 1984-10-08 Category:DRAWINGS MONTHYEARML20266A5471996-02-14014 February 1996
[Table view]General Assembly Shaft Seal Pump ML20266A5341996-02-14014 February 1996 as Built.Sheet 2 of 2 ML20266A5301996-02-14014 February 1996 as Built.Sheet 1 of 2 ML20266A5161996-02-14014 February 1996 General Arrangement.Sheet 2 of 2 ML20265F4971996-02-14014 February 1996 Valve Assembly 8 Inch 600 LB Gate Valve Cressoh A-20.Sheet 1 of 1 ML20266A3791996-02-14014 February 1996 General Arrangement.Sheet 1 of 2 ML20266A2991996-02-14014 February 1996 General Arrangement Elevation Westinghouse Electric Corp 173 Feet Id PWR ML20265F5291996-02-14014 February 1996 Valve Assembly 4 Inch 1500 LB Gate Cres Sch 80.Sheet 1 of 1 ML20266A3101996-02-14014 February 1996 150 Gpm 7 Inch Dia LOW Pressure Filter Assembly Inside Out Flow.Sheet 1 of 1 ML20266A3191996-02-14014 February 1996 Tank 400 Ft Volume Control.Sheet 1 of 2 ML20266A3241996-02-14014 February 1996 Pulsation Damper Assy Reciprocating Suction Pump 1 Gallon. Sheet 1 ML20266A3051995-08-14014 August 1995 80 Gpm 4 Inch Dia High Pressure Filter Assembly Inside Out Flow.Sheet 1 of 1.Actual Drawing Number 5EHD-10602-004EC32 ML20265F6551995-06-26026 June 1995 Auxiliary Feedwater System to STM Gen 2D ML20266F8241995-06-13013 June 1995 as Built Dimensions.Sheet 2 of 3 ML20266F8211995-06-13013 June 1995 as Built Dimensions.Sheet 1 of 3 ML20266F8161995-06-13013 June 1995 as Built Dimensions.Sheet 2 of 3 ML20266F8111995-06-13013 June 1995 as Built Dimensions.Sheet 1 of 3 ML20266F8081995-06-13013 June 1995 General Arrangement.Sheet 2 of 2 ML20266A2221995-03-31031 March 1995 Flow Diagram of Main Steam System SM ML20266A5431995-03-20020 March 1995 as Built Dimensions Ddgt 1924.Sheet 1 of 3 ML20266A5391995-03-0303 March 1995 as Built Dimensions Ddgt 1923.Sheet 1 of 3 ML20266A5251995-03-0303 March 1995 as Built Dimensions DOST-1222.Sheet 1 of 3 ML20266A5211995-03-0303 March 1995 as Built Dimensions.Sheet 1 of 3 ML20266A2851995-02-25025 February 1995 Ddp as Builts Coordinates & Elevation of Closure Head Penetration.Sheet 7 of 9 ML20265F5021995-01-20020 January 1995 Valve Assembly Gate 6 Inch 150 LB Cres.Sheet 1 of 1 ML20266A1891994-12-0606 December 1994 Flow Diagram of Containment Spray System Ns ML20266A1851994-11-23023 November 1994 Flow Diagram of Safety Injection System Ni ML20265F5651994-11-0606 November 1994 Reactor Coolant System to Regen HX & Reac Coolant Drain Tank Pumps ML20265F7071994-10-25025 October 1994 Feedwater System to Steam Generator 2C ML20265F6391994-10-25025 October 1994 Auxiliary Feedwater Sys Aux Feedwater to Steam Gen 2C. Drawing Number Partially Illegible ML20266A4261994-10-10010 October 1994 Flow Diagram of Component Cooling System Kc ML20266A2011994-09-27027 September 1994 Flow Diagram of Feedwater System CF ML20262E9321994-09-14014 September 1994 General Arrangement ML20266A1501994-09-13013 September 1994 Flow Diagram of Chemical & Volume Control System Nv ML20266A4541994-09-13013 September 1994 Flow Diagram of Nuclear Service Water System Rn ML20266A1701994-09-0909 September 1994 Flow Diagram of Safety Injection System Ni ML20266A1751994-08-29029 August 1994 Flow Diagram of Safety Injection System Ni ML20266A2071994-08-22022 August 1994 Flow Diagram of Auxiliary Feedwater System CA ML20266A1611994-08-11011 August 1994 Flow Diagram of Residual Heat Removal System No ML20266A1411994-08-0909 August 1994 Flow Diagram of Chemical & Volume Control System Nv ML20266A1291994-08-0909 August 1994 Flow Diagram of Reactor Coolant System Nc ML20265F5241994-08-0909 August 1994 Valve Assy Gate 4 Inch 900 LB Cres with Motor Cpep Sch 80. Sheet 1 of 1 ML20266A1551994-08-0303 August 1994 Flow Diagram of Chemical & Volume Control System Nv ML20266A1371994-08-0303 August 1994 Flow Diagram of Chemical & Volume Control System Nv ML20266A1321994-07-27027 July 1994 Flow Diagram of Chemical & Volume Control System Nv ML20266A1661994-07-25025 July 1994 Flow Diagram of Residual Heat Removal System No ML20266A4621994-07-13013 July 1994 Flow Diagram of Nuclear Service Water System Rn ML20266A4691994-07-13013 July 1994 Flow Diagram of Nuclear Service Water System Rn ML20265F7121994-07-0202 July 1994 Feedwater Sys to Steam Gen 2D ML20265F6601994-07-0202 July 1994 Auxiliary Feedwater System to STM Gen 2B 1996-02-14 |
Text
Retrieved from "https://kanterella.com/w/index.php?title=ML20263R581&oldid=3125090"