Semantic search
Jump to navigation
Jump to search
Issue date | Title | Topic | |
---|---|---|---|
ML20259D312 | 8 October 1984 | General Arrangement:Containment and Reactor Building Unit 1 Plan at El 582 Ft 6 Inches. Rev Date Illegible | |
ML20263M938 | 10 January 1984 | Electrical Equipment Layout:Reactor Building Pene Schedule | |
ML20263M936 | 10 January 1984 | Electrical Equipment Layout:Reactor Building Pene Schedule | |
ML20263P081 | 20 December 1983 | Auxiliary Building Units 1 & 2 Floor El 560 Ft General Arrangement Architectural Switchgear Room Plans | |
ML20263P077 | 6 December 1983 | Assembly Layout:General Service Cold Penetration Assembly Type C-1,C-2,C-3 & C-4 | |
ML20263P088 | 1 December 1983 | Auxiliary Building Structural Steel By-Pass Leakage Enclosure Sections and Details | |
ML20263C631 | 22 November 1983 | Auxiliary Building General Arrangement:Health Physics Area Plan at El 594 Ft & El 609 Ft. Rev Date Illegible | |
ML20263M941 | 14 November 1983 | Aux Bldg & Serv Bldg Equipment Layout El 594 Ft Control Room Computer Room | |
ML20263C236 | 1 November 1982 | General Arrangement Fuel Building Unit 2 Plan at El 594 Ft | |
ML20263C227 | 22 October 1982 | Auxiliary Building Floor El 594 Ft General Arrangement Control Room Plan | |
ML20263C244 | 30 September 1982 | Auxiliary Building Hot Machine Shop Area General Arrangement Floor Plan El 594 Ft | |
ML20263C246 | 29 July 1982 | Auxiliary Building General Arrangement Contaminated Tool Calibration Room Area Plan at El 594 Ft and El 809 Ft | |
ML20261M771 | 1 July 1982 | Auxiliary Building General Arrangement:Hoist,Crane and Monorail Schedule. No Revision Date | |
ML20260H566 | 9 March 1982 | Plan at El 605 Ft 10 Inches & El 619 Ft. No Date | |
ML20260H563 | 9 March 1982 | Plan at El 594 Ft. No Date | |
ML20260H558 | 9 March 1982 | Plan at El 577 Ft. No Date | |
ML20260H554 | 9 March 1982 | Plan at El 560 Ft. No Date | |
ML20260H551 | 9 March 1982 | Plan at El 543 Ft. No Date | |
ML20260H546 | 9 March 1982 | Plan at El 522 Ft. No Date | |
ML20263R603 | 24 September 1981 | Auxiliary Building Fuel Building Unit 2 General Arrangement/Architectural Plan at New Fuel Storage. No Revision Date | |
ML20263R591 | 24 September 1981 | Auxiliary Building Units 1 & 2 - Floor El 594 Ft General Arrangement/Architectural Penetration Room Plans | |
ML20263R586 | 24 September 1981 | Auxiliary Building Units 1 & 2 - Floor El 574 Ft General Arrangement/Architectural Cable Room Plan. No Revision Date | |
ML20263R572 | 24 September 1981 | Auxiliary Building Units 1 & 2 - Floor El 560 Ft General Arrangement/Architectural Plan. Sheet 1 of 3.No Revision Date | |
ML20263R574 | 24 September 1981 | Auxiliary Building Units 1 & 2 - Floor El 560 Ft General Arrangement/Architectural Plan. Sheet 2 of 3.No Revision Date | |
ML20263T231 | 31 August 1981 | Fire Protection Layout & Boundaries:Auxiliary Building Elevation 560 Ft | |
ML20263T241 | 31 August 1981 | Fire Protection Layout & Boundaries:Auxiliary Building Elevation 577 Ft | |
ML20263T228 | 31 August 1981 | Fire Protection Layout & Boundaries:Auxiliary Building Elevation 543 Ft | |
ML20263T225 | 31 August 1981 | Fire Protection Layout & Boundaries:Auxiliary Building Elevation 522 Ft | |
ML20262C732 | 25 August 1981 | Reactor Building General Arrangement:Hoist,Crane and Monorail Schedule | |
ML20263R566 | 21 July 1981 | General Arrangement:Containment and Reactor Building Unit 2 Top Deck El 669 Ft 5 Inches and Laydown Space | |
ML20263R564 | 21 July 1981 | General Arrangement:Containment and Reactor Building Unit 2 Plan at El 652 Ft 7 1/2 Inches | |
ML20263R562 | 21 July 1981 | General Arrangement:Containment and Reactor Building Unit 2 Plan at Operating Floor El 605 Ft 10 Inches | |
ML20263R561 | 21 July 1981 | General Arrangement:Containment and Reactor Building Unit 2 Plan at El 594 Ft 10 3/4 Inches | |
ML20263R596 | 3 June 1981 | Auxiliary Building Fuel Building Unit 1 General Arrangement/Architectural Plans at New Fuel Storage | |
ML20263R608 | 8 May 1981 | Auxiliary Building Diesel Generator Area Unit 1 General Arrangement/Architectural Floor Plan El 556 Ft Roof Plan El 594 Ft | |
ML20263R589 | 8 May 1981 | Auxiliary Building Units 1 & 2 - Floor El 594 Ft General Arrangement/Architectural Plan. Sheet 3 of 3 | |
ML20263R587 | 8 May 1981 | Auxiliary Building Units 1 & 2 - Floor El 594 Ft General Arrangement/Architectural Plan. Sheet 2 of 3 | |
ML20263R610 | 5 May 1981 | Auxiliary Building Diesel Generator Area Unit 2 General Arrangement/Architectural Floor Plan El 556 Ft Roof Plan El 594 Ft | |
ML20261M774 | 30 April 1981 | Auxiliary Building Units 1-2 - Floor El 522 Ft General Arrangement/Architectural Plan. Sheet 1 of 2 | |
ML20263R576 | 8 April 1981 | Auxiliary Building Units 1 & 2 - Floor El 560 Ft General Arrangement/Architectural Plan. Sheet 3 of 3 | |
ML20263R584 | 8 April 1981 | Auxiliary Building Units 1 & 2 - Floor El 577 Ft General Arrangement/Architectural Plan. Sheet 3 of 3 | |
ML20263R577 | 8 April 1981 | Auxiliary Building Units 1 & 2 - Floor El 554 Ft General Arrangement/Architectural Battery Room Plan | |
ML20263R567 | 8 April 1981 | Auxiliary Building Units 1 & 2 - Fl El 543 Ft General Arrangement/Architectural Plan. Sheet 2 of 3 | |
ML20263R569 | 8 April 1981 | Auxiliary Building Units 1 & 2 - Fl El 543 Ft General Arrangement/Architectural Plan. Sheet 3 of 3 | |
ML20263R581 | 8 April 1981 | Auxiliary Building Units 1 & 2 - Floor El 577 Ft General Arrangement/Architectural Plan. Sheet 1 of 3 | |
ML20263R579 | 8 April 1981 | Auxiliary Building Units 1 & 2 - Floor - El 560 Ft General Arrangement/Architectural Switchgear Room Plans | |
ML20263R571 | 31 March 1981 | Auxiliary Building Units 1 & 2 - Floor El 547 Ft General Arrangement/Architectural Auxiliary Feedwater Pump Room Plans | |
ML20263P053 | 18 March 1981 | Reactor Building:Spare Penetration Sleeve Capping Details | |
ML20263R582 | 9 March 1981 | Auxiliary Building Units 1 & 2 - Floor El 577 Ft General Arrangement/Architectural Plan. Sheet 2 of 3 | |
ML20263R606 | 9 March 1981 | Auxiliary Building Hot Machine Shop Area General Arrangement Floor Plan El 594 Ft |