ML20245C103

From kanterella
Revision as of 07:33, 22 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Insp Rept 50-298/89-13 on 890327-30.No Violations or Deviations Noted
ML20245C103
Person / Time
Site: Cooper Entergy icon.png
Issue date: 04/17/1989
From: Callan L
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To: Trevors G
NEBRASKA PUBLIC POWER DISTRICT
Shared Package
ML20245C106 List:
References
NUDOCS 8904270004
Download: ML20245C103 (2)


See also: IR 05000298/1989013

Text

.-__ __ - _ _ _ _ _ _ --

. ',

F ,

.

l

'

In Reply Refer To:

Docket: '50-298/89-13 APR l T IM

k

Nebraska Public Power District

ATTN: George A. Trevors

Division Manager - Nuclear Support

P.O. Box 499

Columbus, NE 68602-0499

Gentlemen:

This refers to the inspection. conducted by Mr. A. R. Johnson of this office

during .the period March 27-30, 1989, of activities authorized by NRC Operating

License DPR-46 for the Cooper Nuclear Station, and to the discussion of our

findings with Mr. Guy Horn and other members of yeur staff at the conclusion of

the inspection.

Areas examined during the inspection: included a review and walkdown of heat

shrinkable tubing used on electrical splices and terminations at Cooper Nuclear

Station. We have also examined actions you have taken with regard to

previously identified inspection findings regarding equipment qualification as

documented in NRC Inspection Reports 50-298/R6-28, April 1,1987, and

50-298/88-26, October.19, 1988, and the Notice'of Violation dated October 25,

1988. Within these areas, the inspection consisted of selective examinatit.n of

procedures and representative records, interviews with personnel, and observations J

by the NRC inspector. The inspection findings are documented in the enclosed

inspecticn report.

t Within the scope of the inspection, no violations or deviations were

identified.

Should you have any questions concerning this inspection, we will be pleased to

discuss them with you.

Sincerely.

Original Signed By

L. A Callen

L. J. Callan, Director

Division of Reactor Projects

Enclosure: (see next page)

RIV:RI h C:PSS % 8 D RS66 D:DRPb

AJohnson;ap TStetka JLMilhoan%$$ LJCa lan

4 /:2./89 4 /#7/89 g/g/89 q///89

8904D70004 890417

PDR ADOCK 05000298

O PNU e

/s l

- . - . . - - _ - . -

_-_ ___ - _ _ - __ _ __ ._-_-

~

'

- - .-

- . ,

'

p. -u.

..

p >

-

Nebraska Public-Power District' -2-' ,

'~

{....

. Enclosure:' '

Appendix - NRC Inspection Report-

50-298/89-13-

cc w/ enclosure:

e Cooper Nuclear Station

. ATTN:! Guy Horn, Division Manager

.of Nuclear Operations

i' P.O. Box 98. .

Brownville, Nebraska '68321 .

Kansas Radiation Control Program Director

Nebraska Radiation Contro1~ Program Director

bec to DMB'(IE01)

bec distrib. by RIV:-

  • RRI *R. D. Martin, RA
  • SectionChief(DRP/C) Lisa Shea, RM/ALF
  • RPB-DRSS * MIS System
  • RIV File *ProjectEngineer,(DRP/C)
  • RSTS Operator *DRP
  • P. O'Connor, NRR Project Manager (MS: 13-D-18)-
  • DRS _ *A. Johnson
  • T. Stetka'
  • w/766

1

. _ . . . - _ _ _ . _ . . _ _ _ _ _ --_ __. _ - - - - _ _ _ . . _ - - - _ - _ _ - _ _ _ _ . - _ - _ _ _ _ _ _ _ _ - _ _ _ . - _ _ . - _ . _ _ _ _ _ _ . _ _ - _ . _ _ _ _ - . - _ _ - - - _ _