NMP1L3361, Summary of Regulatory Commitment Changes

From kanterella
Revision as of 01:31, 22 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Summary of Regulatory Commitment Changes
ML20309A904
Person / Time
Site: Nine Mile Point  Constellation icon.png
Issue date: 11/03/2020
From: Shultz B
Exelon Generation Co
To:
Document Control Desk, Office of Nuclear Reactor Regulation
References
NMP1L3361, RIS 2000-17, SECY-00-0045
Download: ML20309A904 (2)


Text

SECY-00-0045 RIS 2000-17 NMP1L3361 November 3, 2020 U.S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, DC 20555-0001 Nine Mile Point Nuclear Station, Units 1 and 2 Renewed Facility Operating License Nos. DPR-63 and NPF-69 Docket Nos. 50-220 and 50-410

Subject:

2020 Summary of Regulatory Commitment Changes There are no regulatory commitment changes requiring NRC notification in accordance with the guidance contained in NEI 99-04, Guidelines for Managing NRC Commitment Changes, Revision 0, for the period of October 1, 2019 to September 30, 2020. NEI 99-04 was approved by the NRC for licensee use via SECY-00-0045, Acceptance of NEI 99-04, Guidelines for Managing NRC Commitments, and licensees were informed that NEI 99-04 was an acceptable process for control of regulatory commitments by the issuance of Regulatory Issue Summary (RIS) 2000-17, Managing Regulatory Commitments made by Power Reactor Licensees to the NRC Staff, on September 21, 2000.

This letter contains no NRC commitments. Should you have any questions regarding the information in this submittal, please contact me at (315) 349-7012.

Sincerely, Digitally signed by Shultz, Brandon K.

Shultz, Brandon K. DN: cn=Shultz, Brandon K.

Date: 2020.11.03 15:35:14 -05'00' Brandon K. Shultz Manager Site Regulatory Assurance, Nine Mile Point Nuclear Station Exelon Generation Company, LLC cc: NRC Regional Administrator, Region I NRC Resident Inspector NRR Project Manager

Document Control Desk November 3, 2020 Page 2 bcc: P. M. Orphanos T. A. Tierney C. M. Adner B. K. Shultz Commitment Coordinator - KSA 3-E