ML20212H617

From kanterella
Revision as of 00:53, 21 January 2021 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Rev 2 to COLR for Pbaps,Unit 2,Reload 12,Cycle 13, IAW TS Section 5.6.5.d.Rept Incorporates Revised Single Loop Operation MAPLHGR Flow Multiplier
ML20212H617
Person / Time
Site: Peach Bottom 
Issue date: 09/24/1999
From: Hutton J
PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
Shared Package
ML20212H620 List:
References
NUDOCS 9910010267
Download: ML20212H617 (1)


Text

s i

, e, 1. - l A TS 5.6.5.d v

,PECO NUCLEAR escocoerove - + "<

965 Chesterbrook Boulevard 1 A Unit of PECO Energy ' Wayne. PA 19 % 7 5691 September 24,1999 Docket No. 50-277 l

l I

License No. DPR-44 U.S. Nuclear Regulatory Commission l Attention: Document Control Desk l Washington DC 20555

]

Subject:

Peach Bottom Atomic Power Station, Unit 2 lssuance of the Core Operating Limits Report for Reload 12, Cycle 13, Revision 2 l

Dear Sir / Madam:

i Enclosed is a copy of the Core Operating Limits Report (COLR) for Peach Bottom Atomic Power Station (PBAPS), Unit 2, Reload 12, Cycle 13 (Revision 2). Revision 2 of this report incorporates a revised Single Loop Operation MAPLHGR flow multiplier.

This COLR is being submitted to the NRC in accordance with PBAPS, Unit 2 Technical Specifications (TS) Section 5.6.5.d.

If you have any questions, please do not hesitate to contact uc.

Ve rs, ,

ames A. Hutton Director - Licensing Enclosure cc: H. J. Miller, Administrator, Region l', USNRC (w/ Enclosure)

A. C. McMurtray, USNRC Senior Resident inspector, PBAPS (w/ Enclosure) l l

- 0 0I 9910010267 990924 PDR' ADOCA 05000277

'P PDR L

i

-- J