ML20212H617
| ML20212H617 | |
| Person / Time | |
|---|---|
| Site: | Peach Bottom |
| Issue date: | 09/24/1999 |
| From: | Hutton J PECO ENERGY CO., (FORMERLY PHILADELPHIA ELECTRIC |
| To: | NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM) |
| Shared Package | |
| ML20212H620 | List: |
| References | |
| NUDOCS 9910010267 | |
| Download: ML20212H617 (1) | |
Text
s i
, e, 1. - l A TS 5.6.5.d v
,PECO NUCLEAR escocoerove - + "<
965 Chesterbrook Boulevard 1 A Unit of PECO Energy ' Wayne. PA 19 % 7 5691 September 24,1999 Docket No. 50-277 l
l I
License No. DPR-44 U.S. Nuclear Regulatory Commission l Attention: Document Control Desk l Washington DC 20555
]
Subject:
Peach Bottom Atomic Power Station, Unit 2 lssuance of the Core Operating Limits Report for Reload 12, Cycle 13, Revision 2 l
Dear Sir / Madam:
i Enclosed is a copy of the Core Operating Limits Report (COLR) for Peach Bottom Atomic Power Station (PBAPS), Unit 2, Reload 12, Cycle 13 (Revision 2). Revision 2 of this report incorporates a revised Single Loop Operation MAPLHGR flow multiplier.
This COLR is being submitted to the NRC in accordance with PBAPS, Unit 2 Technical Specifications (TS) Section 5.6.5.d.
If you have any questions, please do not hesitate to contact uc.
Ve rs, ,
ames A. Hutton Director - Licensing Enclosure cc: H. J. Miller, Administrator, Region l', USNRC (w/ Enclosure)
A. C. McMurtray, USNRC Senior Resident inspector, PBAPS (w/ Enclosure) l l
- 0 0I 9910010267 990924 PDR' ADOCA 05000277
'P PDR L
i
-- J