Title | Failure to Provide Adequate Emergency Lighting |
Description | The team identified a non-cited violation of License Condition 2.C.(5) for failure to provide emergency lighting along alternate routes plant operators are allowed to take during implementation of the procedure for control room evacuation due to fire.The failure to provide 8-hour emergency lights along alternate routes used by operators during control room evacuation due to fire is a performance deficiency. The performance deficiency was more than minor because it was associated with the protection against external factors attribute of the Mitigating Systems cornerstone and adversely affected the cornerstone objective of ensuring the availability, reliability, and capability of systems that respond to initiating events to prevent undesirable consequences. The team evaluated this finding using Inspection Manual Chapter 0609, Appendix F, Fire Protection Significance Determination Process, dated September 20, 2013, because it affected the ability to reach and maintain safe shutdown conditions in case of a fire. The team assigned the finding to the post-fire safe shutdown category since it impacted the alternate shutdown element. The issue screened to Green because the reactor would be able to achieve and maintain hot shutdown because the operators are required to carry flashlights. Specifically, the team had reasonable assurance that the operators would be able to complete the evacuation procedure using handheld flashlights to access safe shutdown equipment. The finding is assigned a cross-cutting aspect in the area of human performance, associated with training, because the operators are not being trained on the access and egress routes that are provided with 8-hour emergency lights during implementation of the control room evacuation procedure due to fire to ensure the time critical actions can be met (H.9). |
Site: | Wolf Creek |
---|---|
Report | IR 05000482/2017008 Section 1R05 |
Date counted | Dec 31, 2017 (2017Q4) |
Type: | NCV: Green |
cornerstone | Mitigating Systems |
Identified by: | NRC identified |
Inspection Procedure: | IP 71111.05 |
Inspectors (proximate) | J Mateychick B Correll G Pick S Makor G Werner |
Violation of: | License Condition |
CCA | H.9, Training |
INPO aspect | CL.4 |
' | |