Notice of Violation from Insp on 880926-30.Violation Noted: Licensee Established Radwaste Storage Area on Elevation 4,771 Ft of Reactor Bldg Where Combustibles within Not Identified in App R Evaluation Rept
ML20206N085
Person / Time
Site: Fort Saint Vrain Xcel Energy icon.png
Issue date: 11/18/1988
From:
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION IV)
To:
Shared Package
ML20206L974 List:
References
50-267-88-21, NUDOCS 8812050331
Download: ML20206N085 (1)


Text

_ _ _ _ _ _ _ _ _. _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ _ - _ _ _ _ - _ _ _ _ _ _ _ _ _ _ _ _

O APPENDIX A NOTICE OF VIOLATION  :

Public Service Company of Colorsdo Docket: 50-267 ,

Fort St. Vrain Nuclear Generating Station Operating License: DRP-34 l

l During an NRC inspection conducted on September 26-30, 1988, a vio!<Aian of Nr.C d

requirements was identified. The violation involved a failure to 6Hlow procedures. In accordance with the "General Statement of Policy ved Procedure for NRC Enforcement Actions," 10 CF! Part 2. Appendir C (1988), ch* violation is listed below:

Fort St. Vrain Nuclear Generating Station Technical Specificatfor. AC7.4.a. ,

requires that, "Written procedures shall be established, implemented, arid ,

maintained covering . . . 1. The applicable proceduras recommended in L Appendix A of Safety Guide 33, November 1972." Safety Guide 33 includes fire safety prevention.

Procedure P-8, "Fire Fighting and Prevention," states that the use of combustibles in plant operating areas may be allowed temporarily and only when immediate use is intended; combustibles must be removed f.om the area when not being used.

Contrary to the above, the licensee has established a radwaste storage >

area on Elevation 4771 feet of the reactor building. This storage area i and the combustibles within it had not been identified in the Appendix R evaluation report or in the justification prcvided in conjunction with the licensee's exemption request for the reactor building.

i This is a Severity Level V violation. (Supplement 1)(267/8821-04) i Pursuant to the provisions of 10 CFR 2.201, Public Service Comoany of Colorado is hereby required to submit to this office, within 30 days of the date of the  ;

letter transmitting this Notice, a written statement or explanation in reply, L

. including for each violation: (1) the reason for the violation if admitted,  !

l 2) the corrective steps which have been taken and the results achieved, j l 3) the corrective steps which will be taken to avoid further violations, and <

4) the date when full compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time.  ;

i j

i j Dated at Arlington, Texas,  !

j this day of 1988.

I t

G812050331 001110 PDR ADOCK 05000P67 0 PDH l

t 2

i steps that have been taken and the results achieved. (3) the corrective steps that will be taken to avoid further deviations, and (4) the date when full s compliance will be achieved. Where good cause is shown, consideration will be given to extending the response time. l L

Dated at Arlington, is. 3, a thh day cf 1980.  ;

+