ML20155J137

From kanterella
Revision as of 04:12, 17 December 2020 by StriderTol (talk | contribs) (StriderTol Bot change)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Errata to SALP Rept 50-395/85-47,reflecting Correct Info Re Degradation of Mgt Controls & Eddy Current Testing of Steam Generator Tubes.Salp Rept Discussed at 860318 Meeting
ML20155J137
Person / Time
Site: Summer South Carolina Electric & Gas Company icon.png
Issue date: 05/08/1986
From: Grace J
NRC OFFICE OF INSPECTION & ENFORCEMENT (IE REGION II)
To: Nauman D
SOUTH CAROLINA ELECTRIC & GAS CO.
Shared Package
ML20155J142 List:
References
NUDOCS 8605220027
Download: ML20155J137 (2)


See also: IR 05000395/1985047

Text

aw

. .

,

May 8, 1986

South Garolina Electric and Gas Company

ATTN:/Mr. D. A. Nauman, Vice President

Nuclear Operations

P. 0. Box 764 (167)

Columbia, SC 29218

'

Gentlemen:

SUBJECT: SYSTEMATIC ASSESSMENT OF LICENSEE PERFORMANCE, REPORT NO. 50-395/85-47

This refers to the NRC's Systematic Assessment of Licensee Performance (SALP)

Board Report for your V. C. Summer facility which was sent to you on March 12,

1986; our meeting of March 18, 1986, at which we discussed this report; and

your written comments dated April 21, 1986, relative to the report.

Your written reply emphasized and described in detail the measures and follow-up

actions you have accomplished and are further planning to improve the functional

areas rated as Category 3 by the Board, specifically Fire Protection and Plant

Operations. A careful examination of these comments lead to our conclusion that

your corrective action is plausible and, if continued, should lead to an

improvement trend.

I have also concluded, based upon *your written comments and my review, that

information contained in the SALP Board Report regarding degradation of management

controls and eddy current testing of the steam generator tubes was inaccurate.

The SALP Board Report has been modified to reflect the correct information.

These modifications are described in the attached Errata sheets. Corrected pages

are included herein to update your copy of the SALP Board Report.

No reply to this letter is required; however, should you have any questions

concerning these matters, I will be pleased to discuss them with you.

Sincerely,

Original Signed by

Roger D. Walker /for

J. Nelson Grace

Regional Administrator

Enclosure:

Appendix to SCE&G V. C. Summer

Plant SALP Board Report No.

50-395/85-47 (Dtd Mar 12, 1986)

cc w/ encl: (See page 2)

8605220027

ADOCK O

a g* h e c ,

PDR PDR

'

g

a wt

-.

,,: *

.

South Carolina Electric and 2 May 8, 1986

Gas Company

gc w/ encl:

W. S. Bradham, Director, Nuclear Plant

M. Operations

L. Skolds, Deputy Director

Operations and Maintenance

/J.B.Knotts,Jr.

Debevoise and Liberman

AI. A. Williams, Jr. , Special

Assistant, Nuclear Operations -

. / Santee Cooper

V A. M. Paglia, Jr. , Manager

Nuclear Licensing

pcc w/ encl:

VChairman Palladino

Commissioner Roberts

4 , Commissioner Asselstine

JCommissioner Bernthal '

gCommissionerZech

e . M. Taylor, IE

. E. Murley, RI

J. G. Keppler, RIII

'

/ . D. Martin, RIV

J. B. Martin, RV

J. A. Axelrad, IE

v$ecords Center, INP0

/vR egion II Distribution List C

'

K. D. Landis

VJ. K. Rausch

J . Hopkins, NRR

vNRC Resident Inspector - Summer

AccumentControlDesk

4 tate of South Carolina

i

'

f

'

.,

RII RII RII

RI RII RII

J W RII//

/ lb/N is DV

9

relli

dtD

HDan(e Stohr

f/

) son R r

/*

. ausch KL) _

/86 04, y /8 ,f./861

/86 g/ /86 0 f/86fOW/co

5g/'t/16 *

t/ 6-74

s/7/4

..