ML20155J623
| ML20155J623 | |
| Person / Time | |
|---|---|
| Site: | Fort Saint Vrain |
| Issue date: | 10/14/1988 |
| From: | Robert Williams PUBLIC SERVICE CO. OF COLORADO |
| To: | |
| Shared Package | |
| ML20155J619 | List: |
| References | |
| TAC-69862, NUDOCS 8810260491 | |
| Download: ML20155J623 (7) | |
Text
_ _ _ _ _ _ _ _ _ __
S BEFORE THE UNITED 5T/.TES NUCLEAR-REGULATORY COMMISSION In the Matter of the Facility Operating License)
)
of )
)
PUBLIC SERVICE COMPANY.0F COLORADO )
Application for Amendment to Appendix A of Facility Operating License I License No. OPR-34 l
OF THE PUBLIC SERVICE COMPANY OF COLORADO FOR THE FORT ST. VRAIN NUCLEAR GENERATING STATION This application fer Amendment to Appendix A of Facility Operating License, license No. DPR-34, is submitted for NRC review and approval.
- Respectfully submitted.
PUBLIC SERVICE COMPANY OF COLORADO By R. O. Williams, Jr.
Senica Vice President huclear Operations KELLY, STANSFIELO & 0'DONNELL James K. Tarpey Public Service Co,npany Building Denver, Colorado 80202 Attorneys for Applicant 8810260491 SG1014 DR ADOCK 05000'67 g
i I
l i.
I I
i ATTACHMENT 1 4
$UMMARY OF
! PROPOSED CHANGES
! {
I l-i f
f s
k I
q l
l l
l l
l
. - _ - ---- -- . . _ , , - _ - . _ _ _ - _ = . .
s SUKYARY OF PROPOSED CHANGES
- 1. Specification AC 7.1.1. is reformatted to better conform to the Stancard Tecnnical Specifications' (STS) format, revised to include the new titles of the recent Fort St.
Vrain (FSV) reoroanization. and~'TolTEws the guidance of Generic Letter $8-06 to allow deletiori of the organization charts and reference to them. Specific changes include:
Section 1- "RESPCNSIBILITY" section added delegating control room command responsibility and corporate responsiblity for overall plant i nuclear safety per STS guidelines.
Section 2a- "Onsite and Offsite Organization" section added to provide a directive '
for the establishment and definition of lines of authority, responsibility, and communication for onsite and offsite organizatiens per Generic Letter 88-06 ouidelines.
j Section 2b(1)- Designates on-duty shift ninimum shift 7.1-1 crew composition per Table following Generic Letter 88-06 guicelines. This section also
] incorporates current Section 2.a i
requirements.
t 5ections 2b(2,3,4)- Discuss licensed operator on-shift
, requirements. This section incluces part of the current clarification text following Table 7.1-1, and the i requirements of current Section 2.b.
Section 2b(S)- Discusses core alteration supervision, .
incarporating the requirements of current Section 2.c, with minor 1 editorial corrections, i
Section 2b(6)- Discusses the onsite requirements for a radiation protection cualified person, incorporating the requirements of current Section 2.d. :
i 1
d i
s l
Section 2b(7)& ,
Fire Brigade Note- Discuss the site . Fire Brigade, incorporating the requirements of current Section 2.e and its Note, with minor editorial corrections.
Sections 2b(8, 8a :
through 8d)- Discuss staff working hours, incorporating the requirements of current Sections 2.1 and 2.i(1 through
- 4), with minor editorial corrections.
Section 2b(9)- Discusses deviation of working hour !
guidelines, incorporating the requirements of the paragraph l r
following currant Section 2.i(4), and the position titles of the FSV reorganization, i Section 2b(10)- Section added to delineate those requiring a Senior Reactor Operator's (SRO) license and those requiring a !
Reactor Operator's (RO) license per l j the guidelines of Generte Letter 88- l j 06, Section 6.2.2.g. -
l Section 2b(11)- Discusses shift crew composition, !
Jl incorporating, with minor editorial l
] corrections, the raquirements of the j current final clarification paragraph following Table 7.1-1, which were not ,
j included in the proposed Sections 2.b(2,3,4). ;
Section 2b(12)- Added to delineate control rocm i command responsibility in the absence l of the Shift Supervisor, and further ;
l expounds on proposed Section 1.b.
1 I
Table 7.1 Placed within Specification AC 7.1.1 .
4 following Section 2. Editorial !
corrections are made to conform with '
this proposed atendment's formatting.
Section 3- "TECHNICAL ADVISORS" section is added i and centrali:es ciscussion of the I function, responsibilities, and '
autnority of the Technical Advisors.
This section incorporates the require ents of current Sections 1.c ,
and 2.f. Revisions are made in formatting, and position titles due to '
the FSV reorganization.
i t
l m . _ _ , _ - -- _ - - . . - , - - . -___.--
Section 4- "UNIT STAFF QUALIFICATIONS" section is i added and discusses staffing and
) qualification requirements; and incorporates the requirements of current Sections 29 and 2.h, with editorial corrections.
Section S- "TRAINING" section was reformatted as Section 5 and contains editorial corrections. This section incorporates requirements of current ,
Section 3. ,
i e
l 1 .
1 !
i I
j 1 i l .
i 1 ,
l k I I
i !
} !
i j l,
4 II. Specification AC 7.1.2 is revised as follows:
Section 1- The Plant Operations Review Committee (PORC) "Membersnip" section is revised to incorporate position titles of the FSV reorganization:
-Current Technical / Administrative Services Manager is replaced by the Nuclear Support Manager;
-Current Support Services Menager is ,
replaced by the Superintendent of '
Chemistry and Radiation Protection 4
(Radiation Protection Manager);
-Current Superintendent of Maintenanco !
15 replaced by the Maintenance ,
Department Manager; '
-Current Superintendent of Nuclear ,
Betterment Engineering and Superintendent of Technical Services .
Engineering are replaced by the '
Systems Engineering Manager; -
- -Current Results Engineering l Supervisor is replaced by the Superintendent of Instrumentation and r Controls (I&C) Maintenance; i i
, -The new position of Operations !
j Manager is created by the t
] reorgani:ation; and the current l l position of Administrative Shift i Supervisor is deleted by the reorgani:ation.
- Sections Sa, Se, l 6d, and /- These sections are revised to ,
incorporate new position titles of the l FSV reorganization.
Section Sk- PORC "Review of every unplsnned onsite release of radioactive material to the !
i environs...," is celeted. This
) requiretent is adequately covered in ;
Sections 5.a through 5.g. ,
1 ,
! l d
i .
I III. Soecification AC 7.1.3. is revised as follows:
Section 1- Formatting changes only are made.
Section 2- The Nuclear Facility Safety Committee !
(NFSC) "Membership" is revised to ,
incorporate new position titles of the FSV reorganization. !
! Sections 3,4, ;
- and 9- "Vice President, Nuclear Operatiens"
< is revised to be "Senior Vice President, Nuclear Operations".
1 l Section 10a- Revised to delete the requirement that i 1 each NFSC meeting's minutes be approved within 30 days following each ,
i neeting. i Section 10b- This section was acded and cirects the preliminary approval of the NFSC F meeting minutos by the Seifor Vice ,
President, "uclear Operations. It 2
also directs tne cistribution of the minutes to the NFSC members, and - L
- approval of the minutes at the next a NFSC meeting.
J ,
Sections 10e j and 10d- Reformatted, and revised to I incorporate the new title of Senior Vice Presicent Nucleat Ooerations. .
4 IV. Paces 7.1-20 through 7.1-23 are (*eleted: I i i Pages 7.1-20 &
7.1 These pages are celeted. They contain 3 Table 7.1-1, and its associated notes
.: and clarification information. This information is new included elsewhere '
in this proposec amencment formatting, t 1 Pages 7.1-22 & !
. 7.1 These pages contain the organi:ation :
- charts (Figures 7.1-1 and 7.1-2), anc
, are deieted follcwing the guicelines !
1 of Generic Letter SS-06.
I j V, Specification AC 7.2 is revised as follows_: l t
5 Sections b. and c.- "Manager Nuclear Procuction" is f J revised to te "Manager, Nuclear j Production and Station Manager."
j I
! f
_. -- . - - .__ _ - _ , - . -. ,,. . . _ _ , . ,__- .