ML20203D327

From kanterella
Revision as of 15:16, 14 December 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Forwards Results of SG Tube Insp,Conducted in Fall of 1998 During Plant end-of-cycle 9 Refueling Outage,Per TS 5.6.8.b. Total of Nine Tubes Were Removed from Svc by Plugging
ML20203D327
Person / Time
Site: Catawba 
Issue date: 02/09/1999
From: Gordon Peterson
DUKE POWER CO.
To:
NRC OFFICE OF INFORMATION RESOURCES MANAGEMENT (IRM)
References
NUDOCS 9902160167
Download: ML20203D327 (81)


Text