Category:DRAWINGS
MONTHYEARML20266A5471996-02-14014 February 1996 General Assembly Shaft Seal Pump ML20266A5341996-02-14014 February 1996 as Built.Sheet 2 of 2 ML20266A5301996-02-14014 February 1996 as Built.Sheet 1 of 2 ML20266A5161996-02-14014 February 1996 General Arrangement.Sheet 2 of 2 ML20265F4971996-02-14014 February 1996 Valve Assembly 8 Inch 600 LB Gate Valve Cressoh A-20.Sheet 1 of 1 ML20266A3791996-02-14014 February 1996 General Arrangement.Sheet 1 of 2 ML20266A2991996-02-14014 February 1996 General Arrangement Elevation Westinghouse Electric Corp 173 Feet Id PWR ML20265F5291996-02-14014 February 1996 Valve Assembly 4 Inch 1500 LB Gate Cres Sch 80.Sheet 1 of 1 ML20266A3101996-02-14014 February 1996 150 Gpm 7 Inch Dia LOW Pressure Filter Assembly Inside Out Flow.Sheet 1 of 1 ML20266A3191996-02-14014 February 1996 Tank 400 Ft Volume Control.Sheet 1 of 2 ML20266A3241996-02-14014 February 1996 Pulsation Damper Assy Reciprocating Suction Pump 1 Gallon. Sheet 1 ML20266A3051995-08-14014 August 1995 80 Gpm 4 Inch Dia High Pressure Filter Assembly Inside Out Flow.Sheet 1 of 1.Actual Drawing Number 5EHD-10602-004EC32 ML20265F6551995-06-26026 June 1995 Auxiliary Feedwater System to STM Gen 2D ML20266F8241995-06-13013 June 1995 as Built Dimensions.Sheet 2 of 3 ML20266F8211995-06-13013 June 1995 as Built Dimensions.Sheet 1 of 3 ML20266F8161995-06-13013 June 1995 as Built Dimensions.Sheet 2 of 3 ML20266F8111995-06-13013 June 1995 as Built Dimensions.Sheet 1 of 3 ML20266F8081995-06-13013 June 1995 General Arrangement.Sheet 2 of 2 ML20266A2221995-03-31031 March 1995 Flow Diagram of Main Steam System SM ML20266A5431995-03-20020 March 1995 as Built Dimensions Ddgt 1924.Sheet 1 of 3 ML20266A5391995-03-0303 March 1995 as Built Dimensions Ddgt 1923.Sheet 1 of 3 ML20266A5251995-03-0303 March 1995 as Built Dimensions DOST-1222.Sheet 1 of 3 ML20266A5211995-03-0303 March 1995 as Built Dimensions.Sheet 1 of 3 ML20266A2851995-02-25025 February 1995 Ddp as Builts Coordinates & Elevation of Closure Head Penetration.Sheet 7 of 9 ML20265F5021995-01-20020 January 1995 Valve Assembly Gate 6 Inch 150 LB Cres.Sheet 1 of 1 ML20266A1891994-12-0606 December 1994 Flow Diagram of Containment Spray System Ns ML20266A1851994-11-23023 November 1994 Flow Diagram of Safety Injection System Ni ML20265F5651994-11-0606 November 1994 Reactor Coolant System to Regen HX & Reac Coolant Drain Tank Pumps ML20265F7071994-10-25025 October 1994 Feedwater System to Steam Generator 2C ML20265F6391994-10-25025 October 1994 Auxiliary Feedwater Sys Aux Feedwater to Steam Gen 2C. Drawing Number Partially Illegible ML20266A4261994-10-10010 October 1994 Flow Diagram of Component Cooling System Kc ML20266A2011994-09-27027 September 1994 Flow Diagram of Feedwater System CF ML20262E9321994-09-14014 September 1994 General Arrangement ML20266A1501994-09-13013 September 1994 Flow Diagram of Chemical & Volume Control System Nv ML20266A4541994-09-13013 September 1994 Flow Diagram of Nuclear Service Water System Rn ML20266A1701994-09-0909 September 1994 Flow Diagram of Safety Injection System Ni ML20266A1751994-08-29029 August 1994 Flow Diagram of Safety Injection System Ni ML20266A2071994-08-22022 August 1994 Flow Diagram of Auxiliary Feedwater System CA ML20266A1611994-08-11011 August 1994 Flow Diagram of Residual Heat Removal System No ML20266A1411994-08-0909 August 1994 Flow Diagram of Chemical & Volume Control System Nv ML20266A1291994-08-0909 August 1994 Flow Diagram of Reactor Coolant System Nc ML20265F5241994-08-0909 August 1994 Valve Assy Gate 4 Inch 900 LB Cres with Motor Cpep Sch 80. Sheet 1 of 1 ML20266A1551994-08-0303 August 1994 Flow Diagram of Chemical & Volume Control System Nv ML20266A1371994-08-0303 August 1994 Flow Diagram of Chemical & Volume Control System Nv ML20266A1321994-07-27027 July 1994 Flow Diagram of Chemical & Volume Control System Nv ML20266A1661994-07-25025 July 1994 Flow Diagram of Residual Heat Removal System No ML20266A4621994-07-13013 July 1994 Flow Diagram of Nuclear Service Water System Rn ML20266A4691994-07-13013 July 1994 Flow Diagram of Nuclear Service Water System Rn ML20265F7121994-07-0202 July 1994 Feedwater Sys to Steam Gen 2D ML20265F6601994-07-0202 July 1994 Auxiliary Feedwater System to STM Gen 2B 1996-02-14
[Table view] Category:DRAWINGS-PIPING & INSTRUMENTATION DIAGRAMS-APPLICANT'S
MONTHYEARML20266A2631986-01-31031 January 1986 Flow Diagram of Reactor Coolant System (Nc), as-built. Rev Date Illegible ML20266A1861986-01-31031 January 1986 Flow Diagram of Solid Radwaste System (Ws). Rev Date Illegible ML20266A1901986-01-31031 January 1986 Flow Diagram of Solid Radwaste System (Ws). Rev Date Illegible ML20266A2031986-01-31031 January 1986 Flow Diagram of Liquid Radwaste System (Wl), as-built.Rev Date Illegible ML20266A0791986-01-31031 January 1986 Flow Diagram of Makeup Demineralizer Water System (Ym). Rev Date Illegible ML20266A2111986-01-31031 January 1986 Flow Diagram of Liquid Radwaste System (Wl), as-built.Rev Date Illegible ML20266A0891986-01-31031 January 1986 Flow Diagram of Liquid Radwaste System (Wl), as-built.Rev Date Illegible ML20266A2161986-01-31031 January 1986 Flow Diagram of Liquid Radwaste System (Wl). Rev Date Illegible ML20266A2731985-07-12012 July 1985 Flow Diagram of Reactor Coolant System (Nc), as-built ML20266A2691985-07-12012 July 1985 Flow Diagram of Reactor Coolant System (Nc), as-built ML20266A0951985-07-12012 July 1985 Flow Diagram of Diesel Gen Engine Fuel Oil System (Fd), as-built ML20266A0981985-07-12012 July 1985 Flow Diagram of Diesel Gen Engine Fuel Oil System (Fd, as-built ML20266A2201985-07-12012 July 1985 Flow Diagram of Containment Spray System (Ns), as-built ML20266A1401985-07-11011 July 1985 Flow Diagram of Feedwater System (Cf) ML20198L7061985-07-0808 July 1985 Flow Diagram of Main Steam to Aux Equipment (SA) Main Steam Bypass to Condenser (Sb), as-built ML20266A1941985-06-11011 June 1985 Flow Diagram of Solid Radwaste System (Ws) ML20266A1171985-05-24024 May 1985 Flow Diagram of Main Turbine Leakoff & Steam Seal System (Tl) ML20266A1201985-05-24024 May 1985 Flow Diagram of Station Air System (Vs) ML20266A1351985-05-23023 May 1985 Flow Diagram of Heater Drain System (Hw) ML20261G3881985-05-17017 May 1985 Flow Diagram of Nuclear Sampling System (Nm), as-built.Rev Date Illegible ML20266A1441985-04-29029 April 1985 Flow Diagram of Steam Generator Blowdown System (88), as-built ML20266A1991985-04-11011 April 1985 Flow Diagram of Liquid Radwaste System (Wl) ML20266A1251985-03-12012 March 1985 Flow Diagram of Makeup Demineralized Water System (Ym), as-built ML20266A1731985-03-12012 March 1985 Flow Diagram of Nuclear Sampling System (Nm), as-built ML20266A1681985-03-12012 March 1985 Flow Diagram of Nuclear Sampling System (Nm), as-built ML20266A1311985-03-0707 March 1985 Flow Diagram of Fire Protection System (Rf) ML20266A1641985-02-21021 February 1985 Flow Diagram of Component Cooling System (Kc), as-built ML20266A2301985-02-12012 February 1985 Flow Diagram of Boron Recycle System (Nb), as-built ML20261G3761985-01-29029 January 1985 Flow Diagram of Waste Gas System (Wg), as-built ML20261G4081985-01-17017 January 1985 Flow Diagram of Auxiliary Feedwater System (Ca), as-built ML20266A1541985-01-0707 January 1985 Flow Diagram of Nuclear Service Water System (Rn), as-built ML20261G3571985-01-0707 January 1985 Flow Diagram of Boron Recycle System (Nb), as-built ML20266A1761985-01-0707 January 1985 Flow Diagram of Waste Gas System (Wg), as-built ML20266A1811985-01-0707 January 1985 Flow Diagram of Waste Gas System (Wg), as-built ML20266A2581985-01-0707 January 1985 Flow Diagram of Chemical & Volume Control System (Nv), as-built ML20266A2261985-01-0707 January 1985 Flow Diagram of Boron Recycle System (Ns), as-built ML20266A2351985-01-0707 January 1985 Flow Diagram of Boron Recycle System (Nb), as-built ML20266A2391985-01-0707 January 1985 Flow Diagram of Boron Thermal Regeneration System (Nr), as-built ML20266A2431985-01-0707 January 1985 Flow Diagram of Boron Thermal Regeneration System (Nr), as-built ML20266A2461985-01-0707 January 1985 Flow Diagram of Chemical & Volume Control System (Nv), as-built ML20266A1491985-01-0707 January 1985 Flow Diagram of Nuclear Service Water System (Rn), as-built ML20266A2551985-01-0707 January 1985 Flow Diagram of Chemical and Volume Control System (Nv), as-built ML20266A2501985-01-0707 January 1985 Flow Diagram of Chemical and Volume Control System (Nv), as-built ML20261G4261984-12-11011 December 1984 Flow Diagram of Reactor Coolant System (Nc), as-built ML20261G3931984-12-11011 December 1984 Flow Diagram of Nuclear Sampling System (Nm), as-built ML20261G4211984-11-29029 November 1984 Flow Diagram of Conventional Chemical Addition System (Ya) ML20261G3591984-11-15015 November 1984 Flow Diagram of Liquid Radwaste System (Wl) ML20261G3851984-11-14014 November 1984 Flow Diagram of Nuclear Sampling System (Nm), as-built ML20261G3681984-11-14014 November 1984 Flow Diagram of Liquid Radwaste System (Wl) ML20261G4041984-11-13013 November 1984 Flow Diagram of Auxiliary Feedwater System (Ca), as-built 1986-01-31
[Table view] |
Text
.
- % 1 *
) .
PAC I F I C G-AS AND E LE C T R.I C COMPANY -
15' MAP /3 '[ 77 BEALE STREET . L A N F R A t4 C I S C O C A L I F O R tl l A 94106 . (415) 781 4211 aouN c. uonneosev . .;.,..,,. g g.. .,. . . ... g. ;,g.
..ca e as m t ... ... ;.6 con u L y , 976 g...f . g;;a.. . g . .,,. .,. g.,.,,,,,
7,. . ,
M A L C O t. M H . P U 64 B U S N . pfffyjg;*;*,, ._
==8.*m.=..*.
.m.c .: r.cu 6 capua ... ... ....
C H A R LE & T. Y A te O E U & L N e,e e. ., s. s. .. c. . . g. . . .
u A L e oo u A. u.. ni L i.O P . . , . . . . . . . . . . . . . . . . . . . < . . . .
PHs L e P A. C R A N E. J 88 ~ . I . . s ["
- .. I;*f HCNMV J. L.PL ANT F .a.es.....s..-. ... m.ta.s.
RIC H A R D A . C L A R R E . . .e .. e a .w e . . ((. r.e e '=
JOHN S.G6SSON . .. s. = .7 "
Oa aeav
. . . . . . V::::. n.'.:::::: '...... '~~ ~ -
Mr. Karl R. Goller g . -r ; / g Assistant Director for kb' C Operating Reactors Y Division of Operating Reactors 6 , f}, f,//g U. S. Nuclear Regulatory Commission 3 jf';M, ,
(id) -g p/'t'J 4 Washington, D. C. 20555
$. -u Re: Docket No. 50-133 % h;:g%8r.~ m,Ml -
- W : J ;f 7OlEN Ligense No. DPR-7 Yf
Dear Mr..Goller:
b U>
m\p h/
This letter is to confirm agreements reached with your Staff concerning (1) the program of additional geologic and scismic investigations in. the vicinity of our Humboldt Day Power Plant, which will be completed over the next several months, (2) the scopo of the seismic design upgrading program for the Plant in order to meet cur-rent regulatory requirements, which is planned for completion during
.g. the Summer-Fall 1976- Unit No. 3 refueling, maintenance, and modifica-l tion outage, and (3) the planned outago s'chedule and requirements for return of the Unit to service. These matters have been discussed in detail with various members of the Regulatory Staff in a series of meetings held on April 20, 21, and 28, 1976.
Attachment I (40 copics enclosed) consists of a report which describes the objectives and details of the program for additional geologic and scismic investigations. It is our intent to complete this work prior to the return of Unit No. 3 to service following the Summer-Fall 1976 outage with the exception of one item noted in the report.
This item, which involves investigations in Table Bluff and Bayside Cutoff-Freshwater Crock Areas, will be completed by the end of 1976.
The report describes the mechanism by which the Regulatory Staff will be kept apprised of the progress of this work and the planned schedule for submission of reports on these investigations.
Attachment II (40 copics enclos,.d) is a summary report de-scribing in detail those Humboldt Bay Power Plant structures, systems-and components which arc addressed by our current seismic design up-grading program and have been classified as Sc'ismic Category I based S
eg 5o21@1o240antain' g $-665 PDR -
. ._) )-
~~~, -
Mr. Karl R. Goller 2 ,- May'll, 1976 on Regula' tory Guide 1.29. In addition, those portions $f[ structures, -
systems and components whose continued function is not required but whose failure could reduce the functioning of Seismic Category I .
plant features are describcd in Attachment II. All of the structures, systems and components listed in Attachment II have or will be qualified by analysis and/or testing, modified or replaced as required to mect current regulatory requirements with respect to withstanding the effects of both the agreed upon OBE of 0.25 g and, in addition, an assumed SSE of 0.50 g. It should be noted that most of the major modifications that will be required are in progress at this time. The Regulatory Staff will_bc kept informed of the status of this work as it progresses. !
- The Summer-Fall 1976 refueling, maintenanco and modification outage. will begin with a controlled shutdoun of the Unit commencing on the night of July 2, 1976. This is consistent with our normal practice of beginning an outage following the Friday cvening peak load rcquire-ments. The present expected return to servico dato is November 1. As agreed in our meeting of April 28, Commission concurrence with respect to the satisfactory completion of the geologic and seismic investigation program (Attachment I) and the current scismic design upgrading program for tho Plant (Attachment II) will be required prior to the time the Unit is returned to power operation.
Kindly acknowledge roccipt of the above material on the on- -
closed copy of this letter and return it to me in the onclosed addressed envelope.
Very truly yours, D _
s i
' J f i
(
Enclosure and Attachments e
4 e p Y
O v l