ML20199E138

From kanterella
Revision as of 22:13, 19 November 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Revised Proposed Tech Specs,Narrowing Scope of Applicability of Inservice Insp of Steam Generator Tubes
ML20199E138
Person / Time
Site: Haddam Neck File:Connecticut Yankee Atomic Power Co icon.png
Issue date: 06/30/1986
From:
CONNECTICUT YANKEE ATOMIC POWER CO.
To:
Shared Package
ML20199E124 List:
References
NUDOCS 8606230198
Download: ML20199E138 (1)


Text

..

t TA8LE 4.4-2 STEAM GENERATOR TUSE INSPECTION IST SAMPLE INSPECTION 2ND SAMPLE INSPECTION 3RD SAMPLE INSPECTION Sample Size Result Action Required Result Action Required Result Action Required A minimum of C-1 None N/A N/A N/A N/A S Tubes per S. G.

C-2 Plug defective tubes C-1 None N/A N/A and inspect additional Plug defective tubes C-1 None 2S tubes in this S. G. C-2 and inspect additional C-2 Plug defective tubes AS tubes m this S. G.

Perform action for C-3 C-3 result of first p sample

- Perform action for

% C-3 C-3 result of first N/A N/A semple C-3 Inspect all tubes in All other this S. G., plug de. S. G.s are None N/A N/A factive tubes and C-1 mspect 25 tubes in Some S. G.s Perform action for N/A N/A sech other S. G. C-2 but no C-2 result of second additional semple Prompt notification S. G. are to NRC pursuant C-3 to specification Additional Inspect all tubes in 6.9.1 S. G. is C-3 each S. G. and plug defective tubes.

Prompt notification N/A N/A to NRC pursuant to specification 6.9.1 S=3 U % h during N k h nuh of mesm pm in h unit, W n k h nuh of steem was iW an inspection n

The Cycle 13 Steam Generator tube eddy current testing of Steam Generator #4 shall not require testing of the 4 Row #1 tubes (Row 1, Columns 51, 52, 53, and 54) having historical data indicating they are not degraded tubes.

%M 198 p

S h ADOCK 05000213 PDR _