t TA8LE 4.4-2 STEAM GENERATOR TUSE INSPECTION IST SAMPLE INSPECTION 2ND SAMPLE INSPECTION 3RD SAMPLE INSPECTION Sample Size Result Action Required Result Action Required Result Action Required A minimum of C-1 None N/A N/A N/A N/A S Tubes per S. G.
C-2 Plug defective tubes C-1 None N/A N/A and inspect additional Plug defective tubes C-1 None 2S tubes in this S. G.
C-2 and inspect additional C-2 Plug defective tubes AS tubes m this S. G.
Perform action for C-3 C-3 result of first p
sample Perform action for C-3 C-3 result of first N/A N/A semple C-3 Inspect all tubes in All other this S. G., plug de.
S. G.s are None N/A N/A factive tubes and C-1 mspect 25 tubes in Some S. G.s Perform action for N/A N/A sech other S. G.
C-2 but no C-2 result of second additional semple Prompt notification S. G. are to NRC pursuant C-3 to specification Additional Inspect all tubes in 6.9.1 S. G. is C-3 each S. G. and plug defective tubes.
Prompt notification N/A N/A to NRC pursuant to specification 6.9.1 U
h N k h nuh of mesm pm in h unit, W n k h nuh of steem was iW S=3 n
during an inspection The Cycle 13 Steam Generator tube eddy current testing of Steam Generator #4 shall not require testing of the 4 Row #1 tubes (Row 1, Columns 51, 52, 53, and 54) having historical data indicating they are not degraded tubes.