ML20149D859

From kanterella
Revision as of 01:11, 27 October 2020 by StriderTol (talk | contribs) (StriderTol Bot insert)
(diff) ← Older revision | Latest revision (diff) | Newer revision → (diff)
Jump to navigation Jump to search
Advises That Date of Compliance Stated in 871125 Response to Notice of Deviation,Item B from Insp Rept 50-455/86-03 Revised from 871231 to 880315 Due to More Extensive Review of Const Work Categories than Originally Scheduled
ML20149D859
Person / Time
Site: Comanche Peak 
Issue date: 02/04/1988
From: Beck J
TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC)
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
TXX-88199, NUDOCS 8802100050
Download: ML20149D859 (1)


Text

.-

FE log # TXX-88199

_ = File # 10130

= r IR 86-03 86-02 TUELECTRIC Ref. # 10CFR2.201  ;

  • /,3,'",hC,n",","l,,, February 4,1988 U. S. Nuclear Regulatory Commission Attn: Document Control Desk  !

Washington, D.C. 20555

SUBJECT:

COMANCHE PEAK STEAM ELECTRIC STAT 10ft (CPSES)

DOCKET N0. 50-445 REVISED DATE OF FULL COMPLIANCE FOR NOTICE OF DEVIATION ITEM B (445/8603-D-18)

Gentlemen:

The TV Electric response to Notice of Deviation (N00) Item B (445/8603-D-18)

(reference TXX-6997 dated November 25,1987) stated that full compliance would be achieved by December 31, 1987, however, as of this date, the review of attributes for each construction work category (CWC) has not been completed.

A more extensive review of the attributes for the CWCs is being performed than was originally scheduled. This more extensive review has resulted in ti,e date of compliance not being achieved as scheduled. Our revised schedule is to attain full compliance by March 15, 1988.

Very truly yours,  !

W. G. Counsil  !

4 By:

JpnW. Beck

.b l Vice President, i Uuclear Engineering GLB/grr c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3) 1 CK [

O a sons, om, svart tan canas, raw nm Yl O\

3 l'

,