ML20149D859
| ML20149D859 | |
| Person / Time | |
|---|---|
| Site: | Comanche Peak |
| Issue date: | 02/04/1988 |
| From: | Beck J TEXAS UTILITIES ELECTRIC CO. (TU ELECTRIC) |
| To: | NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM) |
| References | |
| TXX-88199, NUDOCS 8802100050 | |
| Download: ML20149D859 (1) | |
Text
.-FE log # TXX-88199
=
File # 10130
=
r IR 86-03 86-02 TUELECTRIC Ref. # 10CFR2.201
- /,3,'",hC ",","l,,,
February 4,1988
,n U. S. Nuclear Regulatory Commission Attn: Document Control Desk Washington, D.C.
20555
SUBJECT:
COMANCHE PEAK STEAM ELECTRIC STAT 10ft (CPSES)
DOCKET N0. 50-445 REVISED DATE OF FULL COMPLIANCE FOR NOTICE OF DEVIATION ITEM B (445/8603-D-18)
Gentlemen:
The TV Electric response to Notice of Deviation (N00) Item B (445/8603-D-18)
(reference TXX-6997 dated November 25,1987) stated that full compliance would be achieved by December 31, 1987, however, as of this date, the review of attributes for each construction work category (CWC) has not been completed.
A more extensive review of the attributes for the CWCs is being performed than was originally scheduled.
This more extensive review has resulted in ti,e date of compliance not being achieved as scheduled.
Our revised schedule is to attain full compliance by March 15, 1988.
Very truly yours, W. G. Counsil By:
.b JpnW. Beck l
4 Vice President, i
Uuclear Engineering GLB/grr c - Mr. R. D. Martin, Region IV Resident Inspectors, CPSES (3)
[
CK O
\\Yl O
a sons, om, svart tan canas, raw nm 3 l'
'