Monthly Operating Rept for Jan 1988
ML20149J021
Person / Time
Site: Oyster Creek
Issue date: 01/31/1988
From: Baran R, Fiedler P
GENERAL PUBLIC UTILITIES CORP.
To:
NRC OFFICE OF ADMINISTRATION & RESOURCES MANAGEMENT (ARM)
References
NUDOCS 8802220240
Download: ML20149J021 (6)


Text

6.

FONIELY OPERATING REPORT - JANUARY- 1988 At the beginning of the report period, Oyster Creek was operating at approximately 666 FMe. On January 5, power was briefly reduced to perform turbine valve testing.

On ' January 6, power was reduced to 635 AMe to remove a reactor recirculation pump from service to replace exciter brushes and stone the collector rings. On January 7, plant load was further reduced to approximately 585 SMe to return the pump to service and power was increased to 665 FMe.

On January 13, power was reduced to approximately 577 FMe to remove the cleanup system from service to perform scheduled surveillance testing and to place a new filter ~ in service. Following satisfactory completion, power was increased to maximum generator load by 2205 hours0.0255 days <br />0.613 hours <br />0.00365 weeks <br />8.390025e-4 months <br />. At 1912 hours0.0221 days <br />0.531 hours <br />0.00316 weeks <br />7.27516e-4 months <br />, a rapid load reduction to 580 FMe was required to stabilize condenser vacuum. Subsequent investigation determined that one (1) steam trap was sticking closed on a steam jet air ejector condenser. The trap was freed and condenser vacuum returned to normal. Power was returned to approximately 665 hWe by 2220 hours0.0257 days <br />0.617 hours <br />0.00367 weeks <br />8.4471e-4 months <br />.

Maximum generator load was maintained for the balance of the report period except for brief power reductions to perform turbine valve testing and to clear an acoustic monitor alarm on an electromatic relief valve.

t 8802220240 880131 PDR ADOCK 05000219 R PDR I

2531g

& g\

-a-- y - , - - -

.----.,-_9 iu------wy.-y-qs---.- py , - - . -

, OPERATING DATA REPORT OPERATING STA11JS

?

1. DOCKET: 50-219

! 2. REPORTING PERIOD: JANUARY, 1988

3. LTTILITY CONTACT: JOHN H. SEDAR, JR. 609-971-4695
4. LICENSED THERMAL POWER (W t): 1930

' 5. NAMEPIATE RATING (GROSS We): 687.5 X 0.8 = 550

6. DESIGN ELECIRICAL RATING (NET We): 650
7. MAXIMLN DEPENDABLE CAPACITY (GROSS We): 650
8. MAXIMUM DEPENDABLE CAPACITY (NET We): 620
9. IF CHANGES OCCUR ABOVE SINCE IAST REPORT, GIVE REASONS: NONE
10. POWER LEVEL 10 WHICH RESTRICTED, IF ANY (NET We): 0
11. REASON FOR RESTRICTION, IF ANY: NONE MONTH YEAR CLMJLATIVE
12. REPORT PERIOD FRS 744.0 744.0 158737.0
13. HOURS RX GITICAL 744,0 744.0 101200.4
14. RX RESERVE SKrDWN 1RS 0.0 0.0 918.2 4
15. HRS GENERATOR ON-LINE 744.0 744.0 98536.9 l 16. LTT RESERVE Sifl1MN 1RS 0.0 0.0 1208.6
17. GROSS THERM ENER (WH) 1429000 1429000 164076789 l
18. GROSS ELEC ENER (WH) 493070 493070 55411424
19. NET ELEC ENER (MWH) 475563 475563 53196559
20. Ifr SERVICE FACTOR 100.0 100.0 62.1
21. (Tr AVAIL FAC'IOR 100.0 100.0 62.8
22. [TT CAP FACIOR (MDC NET) 103.1 103.1 54.1
23. tTT CAP FACTOR (DER NET) 98.3 98.3 51.6
24. IIT FORCED OlTTAGE RATE 0.0 0.0 11.4
25. FORCED OLITAGE 1RS 0.0 0.0 12686.3
26. SFUTDOWNS SmEDULED OVER NEXT 6 MON 116 (TYPE, DATE, DURATION): N/A
27. IF OJRRENTLY EHTTDOWN ESTIMATED STARTUP TIME: N/A 1965B l

t AVERAGE DAILY POE R LEVEL NET We DOCKET f. . . . . . . . 50-219 UNIT. . . . . . . . . . 0YSTER GEEK #1 REPORT DATE . . . . . . . FEBRUARY 02, 1988 CCMPILED BY , . . . . . . DONALD V. NOTIGAN TELEPHONE # . . . . . . 609-971-4695 l

MONDI JANUARY, 1988 l

DAY W DAY W
1. 644 17 640
2. 644 18 642
3. 643 19 641
4. 644 20 642
5. 641 21 641
6. 639 22 641
7. 613 23 641
8. 640 24 641
9. 641 25 639
10. 642 26 639
11. 642 27 640
12. 641 28 641
13. 617 29 640
14. 639 30 641
15. 641 31 6 38
16. 640 1968B l

I

y.

Oyster Creek Station #1 Docket No. 50-219 REFUELING INFORMATION - JANUARY, 1988 Name of Facility: Oyster Creek Station #1 Scheduled date for next refueling shutdown: N/A Scheduled date for restart following refueling:

Will refueling or resumption of operation thereafter require a Technical Specification change or other license amendment?

Yes Scheduled date(s) for submitting proposed licensing action ani supporting informaticn:

March 31, 1988 Important licensing considerations associated with refueling, e.g., new or different fuel design or supplier, unreviewed design or perfomance analysis methods, significant changes in fuel design, new operating procedures:

1. General Electric Fuel Assemblies - fuel design and performance analysis methods have been approved by the NRC.
2. Exxon Fuel Assemblies - no major changes have been made nor are there any anticipated.

= 560 We nmber of fuel assemblies (a) in the core (b) in the spent fuel storage pool = 1392 (c) in dry storage = 20

%e present licensed spent fuel pool storage capacity and the size of any increase in licensed storage capacity that has been requested or is planned, in neber of fuel assemblies:

Present licensed capacity: 2600 he projected date of the last refueling that can be discharged to the spent fuel pool assming the present licensed capacity:

Reracking of the fuel pool is in progress. Nine (9) out of ten (10) racks have been installed to date. When reracking is completed, discharge capacity to the spent fuel pool will be available until 1994 refueling outage.

1619B

l r., ,

l I

50-219 DOCKET NO.

UNITSilUTDOWNS AND POWER REDUCTIONS vyster Creek UNIT NAME DATE February 1988 COMPLETED BY R. Rnrnn January 1988 971-4640 REPORT MON DI TELEPHONE "E c s o E  % Cause A Corrective

$E "g Y3 Licensee t No. Date g 3g ,s& Event g3 EO T Ai"" '"

Report # mO o Prevent Recurrence H

fE 5 3 e

5 c:) o 8

Maintenance outage following 66 9/10/87 F 1804.4 A 1 forced shutdown - September 10 to November 24.

l l

l l

3 4 I 2 Exhibit G - Instructions F: Forced Reason: Method:

1-Manual for Preparation of Data S: Scheduled A-Equipment Failure (Explain) Entry Sheets for Licensee B-Maintenance of Test 2-Manual Scram.

3 Automatic Scram. Event Report (LER) File (NUREG-C-Refueling 4-Other (Explain) 0161)

D Regulatory Restriction l

E-Opesator Training & Ucense Exandaallon 5

F-Administrative Exhibit I- Same Source G-Operational Errur (Explain)

(9/77) IIOti.es (Explain)

- e GPU Nuclear Corporation NggIgf Post Office Box 388 Route 9 South Forked River.New Jersey 08731-0388 609 971 4000 Writer's Direct Dial Number:

uary 16, 1988 c of Management Information U.S. Nuclear Regulatory Commission Washington, DC 20555

Dear Sir:

Subject:

Oyster Creek Nuclear Generating Station Docket No. 50-219 Monthly Operating Report In accordance with the Oyster Creek Nuclear Generating Station Operating License No. DPR-16, Appendix A, Section 6.9.1.C, enclosed are two (2) copies of the Monthly Operating Data (gray book information) for the Oyster Creek Nuclear Generating Station.

If you should have any questions, please contact Mr. Joseph D. Kowalski, Oyster Creek Licensing Manager at (609)971-4643.

Very truly yours, IA . A Pe(.e V .~Fiedler Vice President and Director Oyster Creek PBF:KB:dmd(0841 A) l Enclosures cc: Director (10)

Office of Inspection and Enforcement U.S. Nuclear Regulatory Commission Washington, DC 20555 Mr. William T. Russell, Administrator Region I U.S. Nuclear Regulatory Commission l 475 Allendale Avenue King of Prussia, PA 19406 i Mr. Alexander W. Dromerick, Project Manager U.S. Nuclear Regulatory Commission Division of Reactor Projects I/II l Washington, DC 20555 t